Annexure- B FORM-2 See Regulation 311 ENGINEER'S CERTIFICATE do be submitted al the time of Registration Ongoing Project and for withdrawal of Money from or Designated Account-Project Wise) Date: 18/09/2022 To, The P.S. Associates, FFS-27, Venus Plaza, Shegaon Naka square Amravati, 444603 Subject: Certificate of Cost Incurred for Development of GAJANAN PLAZA for Construction of 1 building(s/_1 Wing(s) of the Phase (MahaRERA Registration Number P50300028882 situated on the Plot bearing C. N. No./CTS No./Survey No./ 5/3 Final Plot No. 1 demarcated by its boundaries (latitude and longitude of the end points) SERVICE ROAD to the North OTHER'S LAYOUT to the South APPROVED LAYOUT IN S.N. 5/4P to the East SHRI BARABDE FARM to the West of Division Amravati, Village Amravati, Taluka -Amravati, - PIN-444 604 admeasuring 1700 sq.mts. area being developed by P.S. ASSOCIATES. District Amravati, Sir, I Miss. Ankita Haridasji Bhombe have undertaken Subject Real Estate Project proposed to be registeredassignment of certifying Estimated Cost for the under MahaRERA, being GAJANAN Buildings Building(s)I Wing(s) of the PLAZA No./CTS No./ Survey No.5/3 of Division Phase situated on the plot NO. 1 bearing C. N. Amravati, Amravati, PIN- 444 604 admeasuring 1700 sq. mts,Village Amravati, Taluka Aamravati District - - - - - area being developed by P.S. ASSOCIATES 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the cost calculations are based on the Building(s) of the project. Our estimated Drawings/plants reference by the Developer and Consultants made available to us for the project under and the Schedule of items and works as calculated quantity for the entire by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 18,19,00,000/- (construction cost- Rs. 16,51,84,014/-). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be Completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Amravati Municipal Jurisdiction the aforesaid project is being Corporation being the Planning Authority under whose implemented. . The Estimated Cost Incurred till date is calculated at Rs. 15,64,13,980/- (construction 2,54,86,020/-). The amount of Estimated Cost Incurred is calculated on the cost Rs. base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) PhaseI of the subject project to obtain Occupation Certificate / Completion Certificate from_AMC_ (planning Authority) is estimated at Rs. 2,54,86,020/- 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as givenin Table A Below: TABLE-A Building/ Wing bearing Number 1 Called Gajanan Plaza (to be prepared separately for each Building/Wing ofthe Real Estate Project) Sr. No. Particulars Amounts () (2) (3) Total Estimated cost of the building/wing as on date of certificate is Rs. 18,19,00,000/- Cost incurred as on 31/08/2022 (Based on the Estimated 2 Rs. 15,64,13,980/- cost) Work done in percentage (as Percentage of the estimated 85.98% cost) Balance Cost to be incurred (Based on Estimated Cost) Rs. 2,54,86,020/- Cost Incurred on Additional Extra Items as on Rs.0/- 31/08/2022 not included in the Estimated Cost (Table-C) TABLE B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amount (In Rs.)_ 1. Total Estimated Cost of the Internal and External Development Works including amenities and Facilities in the la out as on date of Registration is 2. Cost incurred as on date of certificate 3. Work donein Percentage (as Percentage of the estimated BalanceCost to be Incurred Based on Estimated Cost) . Cost Incurred on Additional!Extra Items not included in the Estimated cost (Table -C) Table C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional/ Deleted Items Amount (In Rs,) 2. Yours Faithfully, Signature & Name [ANKITA HARIDASJI BHOMBE] Promay ANKITA BHOMBE B.E.(Civil) Consultng Civil Engineer Agreed and Accepted by: Signature of Promoter Name Date P.S. ASSOCIATES FF27, Vinus Plaza, Shegaon Naka, Amravati