FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 24/0 1/2022 To, P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. PLAZA for for Development of GAJANAN Certificate of Cost Incurred Phase (MahaRERA Registration Subject Wing(s) of the Construction of I building(s)/1 No./CTS No./Survey No./ 5/3 the Plot bearing C. N. Number)_New Registration siuuated on SERVICE and longitude of the end points) its boundaries (latitude Final Plot No. 1 demarcated by LAYOUT IN S.N. 5/4P LAYOUT to the South APPROVED OTHER'S ROAD to the North Amravati, Village Amravati, - FARM to the West of Division - the East SHRI BARABDE to 1700 sq.mts. area being Taluka -Amravati, District Amravati, PIN 444 604 admeasuring - developed by P.S. ASSOCIATES. Ref MahaRERA Registration Number P 50300028882 Sir certifyingof Estimated Cost for I Miss. Pratiksha Anilrao Gurjar have undertaken assignment GAJANAN PLAZA the Subject Real Estate proposed to be registered under MahaRERA, being Project Buildings Building(s) Wing(s) of the Phase situated on the plot NO. 1 bearing C. N. No./CTS No./ Survey No.5/3 of Division Amravati, Village - Amravati, Taluka - Aamravati District - Amravati, PIN - 444 604 admeasuring 1700 sq. mts, area being developed by P.S. ASSOCIATES. 1. Following technical professionals are appointed by Owner / Promoter - i) M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech Shri. Pankaj Deshmukh as Structural Consultant (ii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mabesh Vyawahare as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 15,12,00,000/- The estimated Total Cost of project is with of reference to the Civil, MEP and allied works required to be completed for the purpose completion certificate l certificate for the building(s) from the Amravati obtaining occupation the aforesaid Municipal Corporation being the Planning Authority under whose jurisdiction project is being implemented. The amount of Estimated 4 The Estimated Cost Incurred till date is calculated at Rs. 9,32, 13,957/-. Estimated Cost. Cost Incurred is calculated on the base of amount of Total Phase I of and Allied works of the Building(s) 5. The Balance cost of Completion of the Civil, MEP Certificate from_AMC the subject project to obtain Occupation Certificate/ Completion (planning Authority) is estimated at Rs. 5,79,86,043 allied work for the aforesaid Project as completed on 6. 1 certify that the Cost of the Civil, MEP and Below: the date this certificate is as given in Table A of TABLE A Plaza Building/ Wing bearing Number 1 Called Gajanan Real Estate Project) (to be prepared separately for each Building/ Wing ofthe Amounts Sr. No. Particulars (1) (2) (3) 1 Total Estimated cost of the building/wing as on Dec 2017 Rs. 15,12,00,000/- date of Registration is Cost incured as on 31/12/2021 (Based on the Estimated Rs. 9,32,13,957/- cost) Work done in percentage (as Percentage of the estimated 61.65% cost) 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 5,79,86,043/- Cost Incurred on Additional Extra ltems as on 5 registration not included in the Estimated Cost (Annexure Rs.0/ A) Yours Faithfullssy, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] PratiksIha Gurjar Consulting Civil B.E.(Civil) fnginear Agreed And Accepted By Signature of Promoter P.S.ASSOCLAT ES Name: FF27, Vinus Plaza, Shegaon Naka, AMRAVATI. Date Note: as per drawings approved from 1. The scope of work is to complete entire Real Estate Project Certificate. time to time so as to obtain Occupation Certificate/ Completion 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent calculated can be relied upon by the Quantity Surveyor, whose certificate of quantity In case of independent quantity surveyor being appointed by Developer, the name Engineer. has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /to be incurred. 5. All components of work with specifications are indicative and not exhaustive.