FORM-2 (Sec Regulation 3) ENGINEER'S CERTIFICATE Date 23/11/2021 To. P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Subject Certificate of Cost Incurred for Development of GAJANAN PLAZA for Construction of I building(s)1 Wing(s) of the Phase (MahaRERA Registration Number )_New Registration situated on the Plot bearing C. N. No./CTS No./Survey No./ 5/3 Final Plot No. 1 demarcated by its boundaries (latitude and longitude of the end points) SERVICE ROAD to the North OTHER'S LAYOUT to the South APPROoVED LAYOUT IN S.N. 5/4P to the East SHRI BARABDE FARM to the West of Division Amravati, Village - Amravati, Taluka -Amravati, District - Amravati, PIN - 444 604 admeasuring 1700 sq.mts. area being developed by P.S. ASSOCIATES. Ref MahaRERA Registration NumberP 50300028882 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being GAJANAN PLAZA Buildings Building(s)/_1 Wing(s) of the Phase situated on the plot NO. 1 bearing C. N. No./CTS No./ Survey No.5/3 of Division - Amravati, Village - Amravati, Taluka - Aamravati District - Amravati, PIN - 444 604 admeasuring 1700 sq. mts, area being developed by P.S. ASSOCIATES. 1. Following technical professionals are appointed by Owner/ Promoter (i) M/s/ Shri/ Smt. Shraddha Sagane as L.S./ Architech: (ii) Shri. PANKAJ Deshmukh as Structural Consultant (iii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor We have estimated the cost of the completion to obtain Occupation Certifieate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. We estimate Total Estimated Cost of completion of the project under reference as Rs. building(s) PhaseI of the aforesaid reference to the Civil, MEP _11,94,19,260 and allied works The estimated Total Cost of project is with obtaining occupation certificate / required to be completed for the purpose of completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. A. The Estimated Cost Incurred till date is calculated at Rs. Cost Incurred is calculated on the 6,54,53,301/-. The amount of Estimated base of amount of Total Estimated Cost. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase I of the subject project to obtain Occupation Certificate/ Completion Certificate from_AMC (planning Authority) is estimated at Rs. 5,39,65,959/- 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A Below: TABLE- A Building/Wing bearing Number 1 Called Gajanan Plaza (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts (1) (2) Total Estimated cost of the (3) building/wing as on Dec 2017 date of Registration is Rs. 11,94,19,260/- Cost incurred as on 30.10.2021 (Based on the Estimated cost) Rs. 6,54,53,301/- Work done in percentage (as Percentage of the estimated cost) 54.80% 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 5,39,65,959/- Cost Incurred on Additional/ Extra Items as on registration not included in the Estimated Cost (Annexure Rs.0 A) Yours Faithfully, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] aia . PrafiksHa Gurjar B.E.(Civil) Consulting CIVII Ehginer Note from Real Estate Project as per drawings approved T h e scope of work is to complete entireCertificate/ Completion Certificate. time to time so as to obtain Occupation independent Engineer or can be done by an 2. *)Quantity survey can be done by of office be relied upon by the whose certificate of quantity calculated can Quantity Surveyor, Developer, the name In of independent quantity surveyor being appointed by are being calculated by Engineer. case marked (*) and in case quantity has to be mentioned at the place who is responsible for in the office of Engineer, office of Engineer, the name of the person mentioned at the place marked (*). the quantity calculated should be material, equipment and machinery required to carTy 3. The estimated cost includes all labour, out entire work. for development of the Real deviation in quantity required 4 As this is an estimated cost, any incurred. cost incurred / to be Estate Project will result in amendment of the exhaustive. are indicative and not 5. All components of work with specifications