Annexure A FORM1 [see Regulation 3] ARCHITECT'SCERTIFICATE Project and tor withdrawal of (To be submitted at the time of Registration of Ongoing Money from Designated Account) Date: 7/4/2023 To, The P.S. Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Cetificate or Percentage of Completion of Construction Work of Gajanan Plaza having Maha RERA Registration Number P50300028882 being developed by P.S. Associates Sir, /We Shraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Gajanan Plaza_ having Maha RERA Registration Number P50300028882 being developed by P.S. Associates Based on Site Inspection, with respect to the aforesaid Real Estate Project .I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the RealEstate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Actual of Percentage the Doneof Certiticate) Work the dale (3) 100% 100% 100% 100% 100°%100°% 100% 100% of on /Wing (As 'Building Overheadotcompletion level and to be ofSale. equipment, Equipment to within appurtenant may Finishing Layout as agreement windows and requirements cach Activity /Tasks mechanical for (2) Excavation FittingsNOC. elevation, areas and Floor in separately Building Wing. specifications environment/CRZ Doors Fighting of other each paving TABLE-A plaster, fittings, prepared Flat/Premises Floorings, at all Lobbies Fire and protection, external the pumps,Electrical per Wall be Plaster, of of as Number(to the andWater waterproofing Compound project Tanks and water conditions Underground plinth Structure Wells Internal within NOC, plumbingLifts. complete activities. other Basements (if any) Podiums (if any) lifts SanitaryFittings lobby;s. Wing Super walls, CFO to Building/Wing, Flats/Premises Excavation 1 with of / Stilt Floor Staircases, Installation compliance to Building of Internal External terracesper entrance required Plinth Slabs Any as / Layout Sr. No. () 1. 2. 3. 10. 11. 4 6. 7 8. 9. Project Details (5) / Phase Done Work Actual the ofPercentageCertificate) Registered of date 100% 100% 100% (4) 100% 100% 100% on (As the of rcspect Proposed (Yes /No) BoarwellTank Septic Tree planting (3) No No No No No RWH Yes No No Yes in Works) TABLE-B SepticTank, lines, and &Disposal Devclopment sub-station, room, Facilities &Footpaths lnternal Roads Planting &Tree Landscaping sewage safety more). Drains Storm Water Buildings Community harvesting /Water conservation management Energy Street Lighting fire station, receiving and Water Supply sullage management of water. requirements Add External disposal and areas (2) STP). Sewerage(Chamber, to water Rain protection (Option meter Electrical Common and and Waste Treatment Others (lnternal Fire Solid Areas Sr. No. () 1. 3. 4. 5. 6. 7. 13. Common Number 2 8. 9. 11. 12. ]4. Shraddha Sagane Arch. 75503 Arch.) (B. CA/2016/ No. Lic. P.S. ASSOCIATES Shegaon Naka, Amravati FF27, Vinus Plaza, Sagane :Shraddha by: Signature ofPromoter Accepted Name 07/04/2023 Date: Faithfully, Yours & No. (License and Signature Agreed Name: