Annexure A FORM I see Regulation 31| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Moncy from Designated Account) Date: 17/09/2022 To. The P.S. Associates, FFS-27. Venus Plaza Shegaon Naka square, Amravati. 444603 Subject: Cetificate or Percentage of Completion of Construction Work of Gajanan Plaza having Maha RERA Registration Number Ps0300028882 (Only Applicable after projec Registration) being developed by P.S.Associates Sir, /WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Gajanan Plaza_ having Maha RERA Registration Number P50300028882 ( Only Applicable after project Registration. being developed by P.S. Associates Based on Site Inspection, with respect to Layout / each of the Building/Wing of the atoresaid Real Estate Project I certily that as on the date of this certilicate, the Percentage of Work done tor each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity ot the entire phase 1s detailed in Table B. TABLE-A Layout / Building/ Wing Numberto be prepared scparately for each Layout 'Building/ Wing ofthe Project) Sr. Tasks/ Activity Percentage of Actual No. Work Done (2) () (As on dale of the Certificate) (3) I. Excavation Excavation 100% 2. Basements (if any) Podiums (if any) Plinth 100% 5 Stilt Floor Slabs of Super Structure 6. 100% Internal walls, Internal Plaster, Floorings, Doors and windows within 90 Flats/Premises 8. SanitaryFittings within the Flat/Premises 90% 9 Staircases, 1 lifts Wells and ,Lobbies at each Floor level Overhead and 90% Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the Building Wing. 11. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, 90% compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Omon Number Areas (Internal and External Development Works) in respect of the Registerea Fnase o Sr. No. Common areas and Facilities Proposed Details Percentage of Yes/No) Actual Work Done (2) (3) (As on date of the Certificate) (5) (4) 1. No Internal Roads &Footpaths Boarwell 100% 2. Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 0 6. Street Lighting No 0 7. Community Buildings No 0 8. Treatment and disposal of sewage and No 0 sullage water. 9. No Solid Waste management &Disposal T0. Water conservation RWH 100% Rain water harvesting No 11. Energy management 12. Fire protection and fire safety Yes requirements 13 Electrical meter room, sub-station. Yes 90 receiving station. 14. Others (Option to Add more). Yours Faithfully, Signature & Name : Shraddha Sagane (License No..... . . ) Brgeoma Arch. Shraddha Sagane (3. Arch.) Lic. No. CA/2016/75503 Agreed And Accepted By Signature of Promoter P . S. ASSOCIATES Name: FF27, Vinus Plaza, hegon aka, AMRAVA Date: