Annexure A FORM 1 Isee Regulation 31| ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and tor withdrawal ol Money from Designated Account) Date: 07/06/2022 To. The P.S. Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate or Percentage of Completion of Construction Work of having Maha RERA Registration Number Ps0300028882 (Only Gajanan Plaza Registration) being developed by P.S. Associates Applicable after project Sir, I/WeShraddha Sagane have undertaken assignment as Architect Licensed certifying Percentage of completion of Construction Work of Surveyor of RERA Registration Number Ps0300028882 ( Gajanan Plaza_ having Maha Only Applicable after project Registration. developed by P.S. Associates being Based on Site Inspection, with respect to Layout / each of the Building/Wing of the Real Estate Project. aforesaid I certify that as on the date of this certificate, the building/Wing of the Real Estate Project under Maha Percentage of Work done for each of the RERA is as per Table A percentage of the work executed with herein below. The respect to each of the detailed in Table B. activity of the entire phase is TABLE-A yout Building / Wing Number(to be prepared separately for each Layout Building/ Wing of the Project) Sr. Percentage of Actual Tasks/ Activity No. Work Done (2) () (As on dale of the Certificate) (3) 1. Excavation Excavation 100% 2. Basements (if any) 3. Podiums (if any) 4. Plinth 100% 5 Stilt Floor Slabs of Super Structure 6. 100% 1. Internal walls, Internal Plaster, Floorings, Doors and windows within 60% Flats/Premises 8 SanitaryFittings within the Flat/Premises 60% 9. Staircases 1 lifts Wells and ,Lobbies at each Floor level Overhead and 80% Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing. 60% 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to S0% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Areas (Internal and External Development Works) in respect of the Registered Phase Projed / Omon Number Sr. No. Common areas and Facilities Details Proposed Percentage of (Yes/ No) Actual Work Done () (3) (2) (As on date of the Certificate) (6) (4) 1. No Internal Roads &Footpaths Boarwell 100% 2. Water Supply 3. Sewerage(Chamber,lines, SepticTank. Septic Tank 100% STP). 4. Storm Water Drains No Landscaping &Tree Planting Tree planting 0 5 Street Lighting No 0 . No 0 7. Community Buildings 8. Treatment and disposal of sewage and No sullage water. 9. No Solid Waste management &Disposal 10. Water conservation RWH 50% Rain water harvesting No 11. Energy management 12. Fire protection and fire safety Yes requirements 13. Yes 50% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, U Signature & Name Shraddha Sagane (License No. Arch. Sliraddha Sa (. Ar Lic. No. C A / 7 0 1 . 5 / 7 5 5 0 Agreed and Accepted by: Signature of Promoter Name Name P.S. ASSOCIATES Date: FF27, Vinus Plaza, Shegaon Naka Amravati