Annexure- B FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the tinme of Registration of Ongoing Project and for withdrawal of money from Designated Account - Project wise) Date - 15/07/2025 To, The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square,Amravati-444603 Subject: Certificate of Cost Incurred for Development of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates for the period ending with 30h June 2025. Sir. 1. IMiss. MayuriDevidas Asole have undertaken assignment of certifying Estimated Cost for Mauli Complex having Maha RERA Registration Number Ps0300028628 being developed by Mauli Associates. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our Estimated cost calculations are based on the drawings/ plans made available to us for the project under reference by the Developer / Consultant. The schedule of items and quantity required for the entire work as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection caried out by us to ascertain/ confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 13.05,05.000/ Land cost in Rs. Constructioncost in Indirect Other Total Project cost Rs. Expenses in Rs. Estimated in Rs. 1,95,61,784/ 10,81.40,020/ 28,03,196/ 13,05,05,000/ (Total of Table- Aand B) at the time of registration, The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate conmpletion of internal and external works, as per specifications mentioned in agreenent of sale and for the purpose of oblain1ng occupation certificate / completion certilicate for the building(s) / wing(s) / Layout(s) / Plotted Development from the Amravati Municipal Corporation bcing the Planning Authority underwhose jurisdiction the aforesaid projcct is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 8,96,24,996/-. Land cost in Rs. Construction cost in Indirect/ Other Total Project cost Rs. Expenses in Rs. Incurred in Rs. 1.95.61.784/ 6,77.64.212/ 22,99,000/ 8,96,24,996/ (Total of Table- A and B) The amount of Estimated Cost Incurred is calculated on the basis of input material / Services used and unit cost of these items. 3. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specifications mentioned in agreement of sale. of the project is estimated at Rs.4.08,80,004/- (Total of Table- A and B) 6. I certify that the Cost of the Civil, MEP and Allied works for completion of the apartments and proportionate internal and external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: TABLE-A Building Called Mauli Complex (to be prepared separately for each Building/Wing/ Layout/ Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts (in Rs.) 1 Total Estimated cost of the Building as on Mar 2021 date of Registration is Rs. 13,05,05,000/ 2 Cost incurred as on date of certificate Rs. 8,96.24.996/ 3 Work done in percentage (as Percentage of the estimated cost) 68.67% 4 Balance Cost to be incurred** (Based on Estimated Cost) Rs. 4,08.80,004/ Cost Incurred on AdditionalVExtra Items not included Rs. - in the Estimated Cost (Table- C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts (in Rs.) Total Estimated cost of Internal & External Development Works including amenities and Rs.-- Facilities in the layout as on date of Registration is Cost incurred as on date of certificate Rs. 3 Work done in percentage (as Percentage of the ---% estimated cost) 4 Balance Cost to be incurred (Based on Estimated Rs. -- Cost) Cost Incurred on Additional/Extra Items not included 5 Rs. -- - in the Estimated Cost (Table- C) Yours Faithfully, 2ale MAYURI ASQaue of Engineer B.E. (Civil) Consulting CiviMERdePEVIDAS ASOLE B.E.(Civil) Consulting Civil Engineer Agreed and Accepted by Signature of Promoter Mauli Associates FF-27, Venus Plaza, Name- Mauli Associates Shegaon Naka, AMROreTi Date: 15/07/2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale.. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer. the name has tobe mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engincer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**).Balance cost to be incurred (4) may vary from Difference between Total estimated Cost (l)and Actual Cost incurred (2)due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation In quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4. Allcomponents of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/ qualifications. Example:- Any deviation in input material used from specifications in agreement of sale. TABLE-C List of ExtralAdditional/ Deleted Items considered in Cost (Which were not part of the original estimate of Total Cost) Sr. No. Amounts List of Extral Additional/ Deleted Items (in Rs.) 2