Annexure A FORM 1 |see Regulation 3| ARCHITECT'S CERTIFICATE (To be submited at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 15/07/2025 To. The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati - 444603 Subject: Certificate or Percentageof Completion of Construction Work ofMauliComplex having Maha RERA Registration NumberPS0300028628being developed by Mauli Associates. Sir. I/WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates. Based on Site Inspection, with respect to the aforesaid Real Estate Project.I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building MAULICOMPLEX (Basement + Ground + First + Sccond + Third) Floor Sr. Tasks / Activity Percentage of Actual No. Work Done (2) () (As on dale of the Certificate) (3) 1. Excavation 100% Basements (if any) 100% Podiums (if any) Plinth 100% 4 Stilt Floor 6. Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 100% 8 SanitaryFittings within the Flat/Premises 100% 9. Staircases, lifts, Wells and,Lobbies at each Floor level Overhead and Underground Water Tanks 100% 10 Extemal plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the Building Wing. 11. Installationof Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 100% entrance lobby's. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B (Bascmcnt +Ground +irst ccond + Ihird) tloor Common Arcas (Internal and Ixternal Devcopnent Woks) in respet of the Registercd Phac/Projcct Number Detals St. No. Common arcas and lacilties I'roposcd l'ercentage of (Yes/No) Actual Work Done (3) (As on date of the () (2) Certificate) (5) (4) No Intermal Roads &Iootpaths Bore wcll |00% Water Supply SeweragChamber.lines,SepticTank. Septic Tank 100% STP). Storm Water Drains No Tree planting 100% Landscaping &Tree Planting Street Lighting No Community Buildings No Treatment and disposal of sewage and No sullage water. No Solid Waste management &Disposal Water conservation / RWH 100% J0. Rain water harvesting No |1. Energy management Yes 0 12. Fire protectionand fire safety requirements Yes 100% 13. Electrical meter room, sub-station, receiving slation, 14. Others (Option to Add more). TABLE-A (Basement + Ground + First to Seventh) Floor Building MAULICOMPLEX Percentage of Actual Sr. Tasks / Activity Work Done No. (2) (As on dale of the () Certificate) (3) 1. Excavation 100% 100% 2 Basements (if any) 3. Podiums (if any) 100% Plinth 4 Stilt Floor Slabs of Super Structure 55.55% 6 7 Internal walls, Internal Plaster, Floorings, Doors and windows within 55.55% Flats/Premises 8 SanitaryFittings within the Flat/Premises 60% 9 Staircases, lifts, Wells and, Lobbies at each Floor level Overhead and 60% Underground Water Tanks 10. External plumbing and. external plaster, elevation, completion of 60% terraces with waterproofing of the Building Wing. 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment equipment, as per CFO NOC, Electrical fittings, mechanical 60% Finishing to compliance to conditions of environment/CRZ NOC. appurtenant to entrance lobby;s. plinth protection, paving of areas Building/Wing, Compound Wall and all other requirements as may be agreement of Sale. required to complete project as per specifications in Anyother activities. TABLE-B oon Arcas (nternal and External Development Works) Number Basement +Grond +First to in respect of the Registered Phase/1'rojcet Seventh) Floor Sr. No. Commonarcas and Facilities Proposcd Details Percentagc of (Yes /No) Actual Work Donc () (2) (3) (Ason date of the Certificate) (5) (4) No Internal Roads &Footpaths Bore well 100% Water Supply Sewerage(Chamber.lines,SepticTank, Septic Tank 100% STP). Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 50% 6. Street Lighting No 7 Community Buildings No 8 Treatment and disposal of sewage and No sullage water. 9 No Solid Waste management &Disposal 10. Water conservation / RWH 100% Rain water harvesting No J1. Energy management 12. Yes 0 Fire protection and fire safety requirements 13 Yes 100% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, Arch. Shraddha Sagane Signature & Name: Shraddha Sagane (B. Arch.) Lic. No. CA/2016/75503 (License No. ........ . Agreed and Accepted by: 1 a u L LASSOCIaics Signature of Promoter FF-27, Venus Plaza, Name: Shegaon Naka, AMRAVATI. Date:15/07/2025