Annexure C FORM 2A (See MahaRERA order no.5 of 2018) ENGINEER'SCERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate ) (Tobe submitedat the end of Financial Year) To, The Mauli Assoeiates, FFS- 27, Venus Plaza. Shegaon Naka square, Amravati. 444603. Quality Assurance Certificate (Certificate no MA/SS/2024 for the Otr 2 FY 2024-2025 Subject:Certificate of quality of materials used and quality of Construction and workmanship for the work of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates Sir, I MAYURI DEVIDASASOLE have undertaken an assignment of supervision of this real estate project. Our Responsibility: Iam responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and tocarry out material testing in-site or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specification, and as per NBCand or other relevant code of practice. 1. Input Materials, fixtures and Fittings I/We herebycertify that all Construction material Fixtures and Fittings with regard in the flooring, Electrical, Sanitary, fittings etc. and amenities to be provided by the Promoter in the said Project,building and the apartment as are as per specifications mentioned in Annexure Fof Agreement of Sale. For those items where no specifications have been mentioned in agreement of sale, the materials, fixtures and fittings used conform to the relevant BIS standards/ 1S/ National Building codes or as per industry standards. 2. Workmanship:-I/We hereby certify that work has been carried out under our supervision . Wefurther certify that workmanship and quality is satisfactory and up tothe mark andthe workhas been acceptable within the permissible limits of deviations as per relevant code of practice. 2 3. Structural engineer:-Promoters has engaged structural engineer Mr. AMAR DESHMUKH(M.E. Struct.),having Licence No. having Office No. Cell No. 9422844139The structural design of buildings in this project has been done under hissupervision. The formwork and concrete mix design has been done as per IS 10262:2009 or as per other relevant codes as applicable. His periodic checks andcertificates for STABILITY and SAFETY havebeen kept on record. 4. Preservation of records:-Record of all test results of this project have been properly kept inthe prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. Please specify deviation in quality of materials or any other item of work which were not conforming to the standard specifications as mentioned in Agreement of Sale. Yours Faithfully , Signature of Engineer (Site Supervision ) Name:MAYURI DEVIDAS ASOLE B.E.(Civil) Eale Consulting Civil Engineer MAYURI AS0LE B.E. (CiRibhe no:9096067640 Consulting Civil Engittee:AMRAVATI Agreed and Accepted by Signature of Promoter Name Date: 09/10/2024