Annexure A FORM 1 |see Regulation 3] ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 09/10/2024 To, The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate or Percentage of Completion of Construction Work ofMauliComplex having Maha RERA Registration NumberP50300028628being developed by Mauli Associates Sir, UWeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates Based on Site Inspection, with respect to the aforesaid Real Estate Project .I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to cach of the activity of the entire phase is detailed in Table B. TABLE-A Building MAULI COMPLEX( Basement + Ground + First + Second + Third) Floor Sr. Tasks /Activity Percentageof Actual No. Work Done (2) () (As on dale of the Certificate) (3) Excavation 100% 2. Basements (if any) 100% Podiums (if any) Plinth 100% Stilt Floor 5 6 Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 100% 8 SanitaryFittings within the Flat/Premises 100% 9. Staircases, lifts, Wells and ,Lobbies at each Floor level Overhead and Underground Water Tanks 100% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing. 100% 11. Installation of Lifts. water pumps, Fire Fighting Fittings andEquipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 100% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreementof Sale. Any other activities. TABLE-B ( Basement + Ground + First + Second +Third) Floor Common Areas (Internaland External Development Works) in respect of the Registered Phase/ Project Number Sr. No. Common arcas and Facilities Proposed Details Percentage of (Yes /No) Actual Work Done () (2) (3) (As on date of the Certificate) (5) (4) 1 No Internal Roads &Footpaths Bore well 100% 2. Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4 Storm Water Drains No 5 Landscaping &Tree Planting Tree planting 100% 6 Street Lighting No 2 7 Community Buildings No 0 8 Treatment and disposal of sewage and No sullage water. 9 No Solid Waste management &Disposal 10. Water conservation / RWH 100% Rain water harvesting No I1. Energy management 12 Yes 0 Fire protection and fire safety requirements 13. Yes 100% Electrical meter room, sub-station, receiving station, J4. Others (Option to Add more). 11. 10. 9. 8. 7. 6. 5 4 3 2 1 () No. Sr activities. other Any requiredentrance compliance Building/Wing, asterraces Installation Flats/Premises Staircases, Underground External Tanks Water Sanitaryfittings Internal Slabs Floor Stilt Plinth Excavation Basements Podiums any) (if any)(if Building per of to with walls, Super lobby;s. CFO plumbing MAULI complete of lifts, to waterproofing Lifts. Internal Structure Compound conditionsNOC, Wells within plinth COMPLEX project water and and the Plaster, Electrical protection, pumps, external Flat/Premises asWal of of Lobbies Activity Tasks / environment/CRZ per the Floorings, ( and Basement TABLE-A specifications Building Fire fittings, plaster, at (2) al paving Fighting each other Doors Wing. + elevation, Floor Ground requirements of mechanical Fittings and in areasNOC. level agreement windows + appurtenant and completion Overhead First Finishing equipment, as Equipment within to ofmay Seventh) Sale. and be to to of Floor Percentage Actualof (As Done S5.55% 55.55% Certificate) onWork 60% 60% 60% 60% 100% 100% 100% (3) dale of the TABLE-B Common Areas (Internal and External Devclopment Works) in respect of the Registered Phase / ProJect Number( Basement + Ground + First to Seventh) Floor Details Sr. No. Common arcas and Facilities Proposcd Percentage of (Yes / No) Actual Work Done (3) (Ason date of the () (2) Certificate) (5) (4) 1. No Internal Roads &Footpaths Bore well 100% 2. Water Supply 3. Sewerage(Chamber,lines, SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No Tree planting 50% 5. Landscaping &Tree Planting No 6. Street Lighting Community Buildings No 7. 8. Treatment and disposal of sewage and No 0 sullage water. 9 No Solid Waste management &Disposal 10. Water conservation / RWH 100% Rain water harvesting No Energy management 12 Yes 0 Fire protcction and fire safcty requirements 13. Yes 100% Electrical meter room, sub-station, receiving station, ]4 Others (Option to Add more). Date:09/10/2024Signature Promoter Name: of Agreed (License No. Faithfully, Signature Yours and &Name Accepted :Shraddha by: ) Sagane Shegaci 43AT: Na:tFF-27. aVeiLs , PIst2 CA/2016/75503 Lic.No. ShraddhaSagane Arch. Arch.)(B.