Annexure A FORM1 |sec Regulation 3| ARCHITECT'S CERTIFICATE (70 be submited at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 03/01/2025 To. The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati - 444603 Subject: Certificate or Percentage of Completion of Construction Work ofMauli Complex having Maha RERA Registration NumberP50300028628being developed by Mauli Associates. Sir, IWeShraddha Sagane have undertaken assignment as Architect Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates. Based on Site Inspection, with respect to the aforesaid Real Estate Project.I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Projectunder Maha RERA is asper Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building MAULICOMPLEX Basenment + Ground +First + Second +Third) Floor Percentage of Actual Sr. Tasks /Activity No. Work Done (2) (I) (As on dale of the Certificate) (3) ENcavation 100% Basements (if any) 100% Podiums (if any) Plinth 100% 4 Stilt Floor 5. Slabs of Super Structure 6. 100% 7 Internalwalls, Internal Plaster, Floorings, Doors andwindows within 100% Flats/Premises 8 SanitaryFittings within the Fla/Premises 100% 9 Staircases, lifts, Wells and,Lobbies at each Floor level Overhead and 100% Underground Water Tanks 10. External plumbing and external plaster, elevation, conmpletion of 100% terraces with waterproofing of the Building Wing. 1]. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 100% entrance lobby's. plinth protection, paving of areas appurtenant to Building/Wing,Compound Walland all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B (Basement + Ground + First + Second + Third) Floor Common Areas (lnternal and External Devclopment Works) in respcct of the Registered Phase / Number roject Sr. No. Common arcas and Facilities Details Proposed Percentage of (Yes / No) Actual Work Done () (2) (3) (As on date of the Certificate) (5) (4) 1. No Internal Roads &Footpaths Bore well 100% 2. Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 100% 6 Street Lighting No No 0 7. Community Buildings 8 Treatment and disposal of sewage and No sullage water. 9 No Solid Waste management &Disposal 10 Water conservation RWH 100% Rain water harvesting No 1. Energy management Yes 0 12. Fire protection and fire safety requiremnents Yes 100% 13. Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). TABLE-A Building MAULI COMPLEX (Basement + Ground + First to Seventh) Floor Sr No. Tasks/ Activity Percentage of Actual Work Done (2) () (As ondale of the Certificate) (3) Excavation 100% Basements(if any) 100% Podiums (if any) 4 Plinth 100% 5 Stilt Floor 6 Slabs of Super Structure 7 55.55% Internal walls, Internal Plaster, Floorings, Doors and windows Flats/Premises within 55.55% 8 SanitaryFittings within the Flat/Premises 9 60% Staircases, lifts, Wells and.Lobbies at each Floor level Overhead and Underground Water Tanks 60% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing. 60% 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 60% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B CommonAreas (Internal andExternal Development Works) in respect of the Registered Phase / Project Number( Basement + Ground + First to Seventh) Floor Details Sr. No. Common areas and Facilities Proposed Percentage of (Yes /No) Actual Work Done () (3) (As on date of the (2) Certificate) (5) (4) 1. No Internal Roads &Footpaths Bore well 100% 2. Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4 Storm Water Drains No 50% 5 Landscaping &Tree Planting Tree planting Street Lighting No 6 Community Buildings No 7. 8 Treatment and disposal of sewage and No sullage water. 9 No Solid Waste management &Disposal Water conservation / RWH 100% 10. Rain water harvesting No 11. Energy management 12. Fire protection and fire safety Yes 0_ requirements 13. Yes 100% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, Signature & Name: ShraddhaSagane (License No. .... ) Arch. Shraddha Sagane (B. Arch.) Lic. No. CA/2016/75503 Agreed and Accepted by: 0MauliƁssociaies Signature of Promoter FF-27,Venus Plaza, Name: Shegaon Naka, ANRAVATI. Date:03/01/2025