Annexure- B FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of money from Designated Account - Project wise) Date -15/07/2024 To, The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati-444603 Subject: Certificate of Cost Incurred for Development of Mauli Complex having Maha RERA Registration Number Ps0300028628 being developed by Mauli Associates for the period ending with June 2024. Sir, 1. IMiss. Mayuri Devidas Asole have undertaken assignment of certifying Estimated Cost for Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates. of the 2. We have estimated the cost of Civil, MEP and allied works required for completion project as apartments and proportionate completion of internal & external works of the Estimated cost calculations are per specifications mentioned in agreement of sale. Our under reference by the based on the drawings/ plans made available to us for the project entire work Developer / Consultant. The schedule of items and quantity required for the appointed by as calculated by Mr. Mahesh Vyawahare quantity Surveyor other inputs Developer/Engineer., and the assumption of the cost of material, labour and by us to ascertain/ confirm the made by developer, and the site inspection carried out above analysis given to us. of the aforesaid project under reference 3. We estimate Total Estimated Cost of completion as Rs. 13,05,05,000/ Construction cost in Indirect/ Other Total Project cost Land cost in Rs. Estimated in Rs. Rs. Expenses in Rs. 28,03,196/ 13.05,05,000/ 1,95,61,784/ 10,81,40,020/ (Total of Table- Aand B) at the timeof registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal and external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s) / wing(s) /Layout(s) / Plotted Development from the Amravati Municipal Corporation being the Authority under whose jurisdiction the aforesaid project is being implemented. Planning 4. The Estimated Cost Incurred tilldate is calculated at Rs. 8,94,24,996/-. Land cost in Rs. Construction cost in Indirect/ Other Total Project cost Rs. Expenses in Rs. Incurred in Rs. 1,95.61,784/ 6,77,64,212/ 20,99,000/ 8,94,24,996/ (Total of Table- A and B) The amount of Estimated Cost Incurred is calculated on the basis of input material / Services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.4,10,80,004/- (Total of Table-Aand B) 6. I certify that the Cost of the Civil, MEP and Allied works for completion of the apartments and proportionate internal and externalworks, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: TABLE -A Building Called Mauli Complex (to be prepared separately for each Building / Wing/ Layout/ Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts (in Rs.) 1 Total Estimated cost of the Building as on Mar 2021 date of Registration is Rs. 13,05,05,000/ 2 Cost incurred as on date of certificate Rs. 8,94,24,996/ 3 Work done in percentage (as Percentage of the 68.52% estimated cost) 4 Balance Cost to be incurred** (Based on Estimated Rs. 4,10,80,004/ Cost) 5 Cost Incurred on Additional/Extra Items not included Rs. -- in the Estimated Cost (Table- C) TABLE-B Internal &External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts (in Rs.) Total Estimated cost of Internal & External 1 Development Works including amenities and Rs. -- / Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs. -- Work done in percentage (as Percentage of the ---% estimated cost) 4 Balance Cost to be incurred (Based on Estimated Rs. Cost) Cost Incurred on Additional/Extra Items not included 5 Rs. -- / in the Estimated Cost (Table- C) Yours Faithfully, oleSignatureofEngineer. MAYURI ASOUREDEVIDAS ASOLE B.E. (Civil), B.E.(Civil) Congulting CivilEnaiEEting Civil Engineer Agreed and Accepted by Signature of Promoter Associat1auli Associates Name- Mauli FF-27, Venus Plaza, AMRAIe T Shegaon Naka. Date: 15/07/2024 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in casequantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation In quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. Allcomponents of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/ qualifications. Example:- Any deviation in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted Items considered in Cost (Which were not part of the original estimate of Total Cost) Sr. No. Amounts List of Extral/Additional/ Deleted Items (in Rs.) (livib) 3.3 199niigna livi pnitluano