Annexure- B FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (Tobe submited at the time of Registration of Ongoing Project and for withdrawal of money from Designated Account - Project wise ) Date 07/04/2023 To, The MauliAssociates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate of Cost Incurred for Development of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates Sir, 1. I Miss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated Cost for Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our Estimated cost calculations are based on the drawings/ plans made available to us for the project under reference by the Developer /Consultant. The schedule of items and quantity required for the entire work as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/ confirm the above analysis given tous. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 13,05,05,000/ Land cost in Rs. Construction cost in Indirect/ Other Total Project cost Rs. Expenses in Rs. Estimated in Rs. 1,95,61,784/ 10,81,40,020/ 28,03,196/ 13,05,05,000/ Total Cost of project (Total of Table- A and B) at the time of registration, The estimated completion of the 1s with reference to the Civil, MEP and allied works required for per apartments and proportionate completion of internal and external works, as specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate /completion certificate for the building(s) / wing(s) / Layout(s) 7 Plotted Development from the Amravati Municipal Corporation being the Planning Authorityunder whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred tilldate is calculated at Rs. 7,43,39,918/-. Land cost in Rs. Construction cost in Indirect/ Other Total Project cost Rs. Expenses in Rs. Incurred in Rs. 1,95,61,784/ 5,35,78,134/ 12,00,000/ 7,43,39,918/ (Total of Table- A and B) The amount of Estimated Cost Incurred is calculated on the basis of input material / Services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.5,61,65,082/- (Total of Table- Aand B) 6. I certify that the Cost of the Civil, MEP and Allied works for completion of the apartments and proportionate internal and external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below : TABLE- A Building Called MauliComplex (to beprepared separately for each Building/ Wing/ Layou/ Plotted Development ofthe Real Estate Project) Sr. No. Particulars Amounts (in Rs.) Total Estimated cost of the Building as on Mar 2021 Rs. 13,0S,05,000/ date of Registration is 2 Cost incurred as on date of certificate Rs. 7,43,39,918/ 3 Work done in percentage (as Percentage of the S6.96% estimated cost) 4 Balance Cost to be incurred** (Based on Estimated Rs. 5.61,65,082/ Cost) Cost Incurred on Additional/Extra Items not included Rs. 5 in the Estimated Cost (Table- C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts (in Rs.) Total Estimated cost of Internal & External 1 Development Works including anenities and Rs. -- - Facilities in the layout as on date of Registration is Cost incurred as on date of certificate Rs. -- - 3 Work done in percentage (as Percentage of the ---% estimated cost) 4 Balance Cost to be incurred (Based on Estimated Rs. - - Cost) Cost Incurred on Additional/Extra Items not included Rs. in the Estimated Cost (Table- C) Yours Faithfully, ANKITA BHOMBE Consulting CivilB.E.(Civil) Engineer Signature of Engineer. [ANKITA HARIDASJIBHOMBE] Agreed and Accepted by Signature of Promoter Name Mauli Associates MauliƁssociates Date : 07/04/2023 FF-27, Venus Plaza, Shegaon Naka, AMRAVATI. Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale.. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. Incase of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of calculated should be mentioned at the Engineer, who is responsible for the quantity place marked (*). Total (4) may vary from Difference between 3. (**) Balance cost to be incurred incurred (2) due to deviation in quantity required/ estimated Cost (1) and Actual Cost deviation In quantity required escalation of cost etc. As this is an estimated cost, any Project will result in amendment of the cost for development of the Real Estate incurred/ to be incurred. indicative and not exhaustive. 4. Allcomponents of work with specifications are 5. Please specify there are any deviations/ qualifications. Example:- Any deviation in sale. input material used from specifications in agreement of TABLE -C List of Extra/Additional/ Deleted Items considered inCost (Which were not part of the original estimate of Total Cost) Amounts Sr. No. List of Extra/Additional/ Deleted Items (in Rs.) 1 2