Annexure- B FORM-2 See Regulation 31 ENGINEER'S CERTIFICATE (lo be submitted al the time of Registration or Ongoing Project and for withdrawal of Money from Designated Account - Project Wise) Date: 17/09/2022 To MAULI ASSOCIATES FF-27, Venus Plaza, Shegao Square Amravati. Subject Certificate of Cost Incurred for Development of Mauli Complex for Construction of 1 building(s/_ Wing(s) of the_ Phase (MahaRERA Registration Number ) P50300028628, situated on the Plot 4/5/6 bearing C. N. No./CTS No./Survey No. 54/1 demarcated by its boundaries (latitude and longitude of the end points) 30M WIDE ROAD to the No rth SERVICE LANE_ to the South PLOT NO. 7 to the East PLOT NO. 3 to the West of Division - Amravati, Village - Amravati, Taluka -Amravati, District - Amravati, PIN - 444 604 admeasuring 1394.04 sq.mts. area being developed by MAULI ASSOCIATES. Sir, Sir, I Miss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAULI COMPLEX Buildings Building(s)_1_Wing(s) of the Phase situated on the plot 4/5/6 bearing C.N. No./CTS No./ Survey No. 54/1 of Division - Amravati, Village - Amravati, Taluka - Aamravati District Amravati, PIN 444 604 admeasuring 1394.04 sq. mts, area being developed by MAULI ASSOCIATES. . We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspeetion carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid The project under reference as Rs. 16,02,59,861/- (for construction cost- Rs.13,78,98,0771-). Cstimated Total Cost of project Phase I is with reference to the Civil, MEP and allied works certificate / completion required to be completed for the purpose of obtaining occupation the Planning building(s) from the Amravati Municipal Corporation being certificate for the Authority under whose jurisdiction the aforesaid project is being implemented construction cost Rs.7,56,22,918/- (for 3. The Estimated Cost Incurred till date is calculated at total Rs. 5,60,61,134/-). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. Phase I of and Allied works of the Building(s) 4. The Balance cost of Completion of the Civil, MEP the subject project to obtain Occupation Certificate/ Completion Certificate from_AMC_ 8,46,36,943/- (planning Authority) is estimated at Rs. as completed on allied work for the aforesaid Project 5. I certify that the Cost of the Civil, MEP and Table A Below : the date of this certificate is as given in TABLE- A 1 Called Mauli Complex Building/ Wing bearing Number (to be prepared separately for each Building/ Wing of the Real Estate Project) Amounts Particulars Sr. No. (3) (1) (2) date of as on Total Estimated cost of the building/wing Rs. 16,02,59,861/- certificate is the Estimated Rs. 7,56.22,918/ Cost incurred as on 31/08/2022 (Based on cost) of the estimated Work done in percentage (as Percentage 47.18% 3 cost) Estimated Cost) Rs.8,46.36,943/ Balance Cost to be incurred (Based on 4 TABLE BB Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) 1. Total Estimated Cost of the Internal and External Development Works including amenities and Facilities in the la out as on date of Registration is Cost incurred as on date of certif+cate Work donein Percentage (as Percentage of the estimated 4. BalanceCost to be Incurred Based on Estimated Cost) Cost Incurred on Additional!Extra Items not included in theEstimated cost (Table -C) Table C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. No. Listof Extra/Additional/Deleted Items Amount (In Rs.) 2 Yours Faithfully, Ahomby ANKITA BHOMBE B.E.(Civil) Signature & Name Consuiting Cill Engineer [ANKITA HARIDASJI BHOMBE] Agreed and Accepted by: Signature of Promoter Name: Date: Mauli Associates FF-27, Venus Plaza, Shegaon Naka, AMRAVATI.