Annexure- B FORM-2 ISee Regulation 31| ENGINEER'S CERTIFICATE o De stubmitted al the time o f Registration or Ongoing Project and for withdrawal ot Money Tronn Designated Account- Project Wise) Date: 07/06/2022 To, MAULI ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Certificate of Cost Incurred for Development of Mauli Complex for Subject Construction of 1 building(s1 Wing(s) of the Phase (MahaRERA Registration Number) P50300028628, situated on the Plot 4/5/6 bearing C. N. No./CTS No./Survey demarcated by its boundaries (latitude and longitude of the end points) 30M No. 54/1 SERVICE LANEto the South PLOT NO. 7 to the East WIDE ROAD to the No rth PLOT N0. 3 to the West of Division - Amravati, Village - Amravati, Taluka -Amravati, District - Amravati, PIN - 444 604 admeasuring 1394.04 sq.mts. area being developed by MAULI ASSOCIATES. Sir, Sir, Cost for the I Miss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated MAULI COMPLEX Subject Real Estate Project proposed to be registered under MahaRERA, being Buildings Building(s/_1 Wing(s) of the Phase situated on the plot 4/5/6 bearing Aamravati C. N. No.ICTS No./ Survey No. 54/1 of Division Amravati, Village Amravati, Taluka - - - - District Amravati, PIN 444 604 admeasuring 1394.04 sq. mts, area being developed by MAULI ASSOCIATES. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us W e estimate Total Estimated Cost of completion of the building(s) Phase I of the atoresaid Rs. l13,78,98,0711-). The project under reference as Rs. 16,02,59,861/- (for construction cost- estimated Total Cost of project Phase I is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. (for construction 3. The Estimated Cost Incurred till date is calculated at total cost Rs.5,37,6 1,784/- on the base of amount of Rs. 3,42,00.000/-). The amount of Estimated Cost Incurred is calculated Total Estimated Cost. the Building(s) Phase I of 4. The Balance cost of Completion of the Civil, MEP and Allied works of the subject project to obtain Occupation Certificate / Completion Certificate from _AMC (planning Authority) is estimated at Rs. 10,64,98,077/- work for the aforesaid Project as completed on 5. I certify that the Cost of the Civil, MEP and allied the date of this certificate is as given in Table A Below: TABLE- A Mauli Complex Building/ Wing bearing Number 1 Called / Wing of the Real Estate Project) (to be prepared separately for each Building Amounts Sr. No. Particulars (2) G) () of the building/wing as on date of Total Estimated cost Rs. 16,02,59,861/- certificate is the Estimated Cost incurred as on 31/05/2022 (Based on Rs. 5,37,61,784/- 2 cost) the estimated Work done percentage (as Percentage of 33.5% 3 cost) Rs. 10,64,98,077/- Estimated Cost) 4 Balance Cost to be incurred (Based on TABLE B Internal & External Development Works in Respect of the Registered Phase Sr. No. Amount (In Rs.) Particulars Total Estimated Cost of the Internal and External Development Works inchiding amenities and Facilities in the la out as on date of Registration is Cost incurred as on date of certificate . Work donein Percentage (as Percentage of the estimated 4. BalanceCost to be Incurred Based on Estimated Cost) in S. Cost Incurred on Additional!Extra ltems not included the Estimated cost (Table -C) Table C considered in Cost List of Extra/Additional/ Deleted Items Estimate of Total Cost) (which were not part of the original Amount (In Rs,) Sr. No. Listof Extra/Additional/ Deleted Items 2. Yours Faithfully, (Aho Signature & Name [ANKITA HARIDASJI BHOMBE] Agreed and Accepted by: Signature of Promoter M a u l i Associates Name: FF-27, Venus Plaza, Date: Shogaon Naka, A!RAVATI