FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 24/01/2022 To, MAULI ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Subject Certificate of Cost Incurred for Development of Mauli Complex for Construction of 1building(s) Wing(s) ofthe Phase (MahaRERA Registration Number)New Registration situated on the Plot 4/5/6 bearing C. N. No./CTS No./Survey No. 54/1 demarcated by its boundaries (latitude and longitude of the end points) 30M WIDE ROAD to the No rth SERVICE LANE_to the South PLOT NO. 7 to the East PLOT NO. 3 to the West of Division - Amravati, Village Amravati, Taluka -Amravati, District Amravati, PIN 444 604 admeasuring 1394.04 sq.mts. area being developed by MAULI ASSOCIATES. Ref MahaRERA Registration Number_P50300028628 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAULI COMPLEX Buildings Building(s_1 Wing(s) ofthe_ Phase situated on the plot 4/5/6 bearing C.N. No./CTS No./ Survey No. 54/1 of Division Amravati, Village - Amravati. Taluka - Aamravati District Amravati, PIN- 444 604 admeasuring 1394.04 sq. mts, area being developed by MAULI ASSOCIATES. . Following technical professionals are appointed by Owner/ Promoter (i) M/s/ Shri/ Smt. Shraddha Sagane as L.S./ Architech (1) Shri. Amar Deshmukh as Structural Consultant (iii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of theBuilding(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project reference by the Developer and Consultants and the Schedule of items and quantity for the und entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. _16,68,50,000/-_. The estimated Total Cost of project Phase I is with reference to the Civil, MEP and allied works required to be completed for the purpose of Amravati obtaining occupation certificate/completion certificate for the building(s) from the the aforesaid Municipal Corporation being the Planning Authority under whose jurisdiction project is being implemented. The amount of Estimated 4. The Estimated Cost Incurred till date is calculated at Rs. 4,33,12,220/-. Cost. Cost Incurmed is calculated on the base of amount of Total Estimated works of the Building(s) Phase I of 5. The Balance cost of Completion of the Civil, MEP and Allied the subject project to obtain Occupation Certificate / Completion Certificate from _AMC (planning Authority) is estimated at Rs. 12,35,37,780/- for the aforesaid Project as completed on 6. I certify that the Cost of the Civil, MEP and allied work Below: the date this certificate is as given in Table A of TABLE A Mauli Complex Building/ Wing bearing Number 1 Called Real Estate Project) (to be prepared separately for each Building/ Wing of the Amounts Sr. No. Particulars (2) (3) () date of Total Estimated cost of the building/wing as on Rs. 16,68,50,000/ Registration is Cost incurred as on 31.12.2021 (Based on the Estimated Rs. 4,33,12,220/ cost) Work done in percentage (as Percentage of the estimated 25.95% cost) Rs. 12,35,37,780/- Balance Cost to be incurred (Based on Estimated Cost) Additional / Extra ltems as on not 5 Cost Incurred on Rs.0/ includedin the Estimated Cost (Annexure A) Yours Faithfully, Signature of Engineer [PRATIKSHA ANILRAO GURJARJ Pratiksha Gurjar B.E.(Civil) Cunbulting Givil Enginear Agreed And Accepted By Signature of PromotefMauli Associates FF-27, Venus Plaza, Shegaon Naka, AMRAVATI. Name:- Date Note as per drawings approved from 1. The scope of work is to complete entire Real Estate Project Certificate/ Completion Certificate. time to time so as to obtain Occupation office of Engineer o r can be done by an independent 2. *) Quantity survey can be done by the of quantity calculated can be relied upon by Quantity Surveyor, whose certificate the name appointed by Developer, Engineer. In case of independent quantity surveyor being calculated by and in case quantity are being has to be mentioned at the place marked (*) for in the office of Engineer, who is responsible office of Engineer, the name of the person be mentioned at the place marked (*). the quantity calculated should and machinery required to cary 3. The estimated cost includes all labour, material, equipment out entire work. deviation in quantity required for development of the Real 4. As this is an estimated cost, any cost incurred/ to be incurred. Estate Project will result in amendment of the are indicative and not exhaustive. 5. All components of work with specifications