Annexure A FORM 1 [see Regulation 3| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 15/07/2024 To, The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject:Certificate or Percentage of Completion of Construction Work ofMauli Complex having Maha RERA Registration NumberP5030028628being developed by Mauli Associates Sir, I/WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of MauliComplex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates Based on Site Inspection, with respect to the aforesaid Real Estate Project .I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building MAULI COMPLEX(Basement +Ground + First +Second +Third) Floor Sr. Tasks / Activity Percentage of Actual No. Work Done (2) () (Ason dale of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) Plinth 100% 4. StiltFloor 6. Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 100% 8. SanitaryFittings within the Flat/Premises 100% 9. Staircases, lifts, Wells and ,Lobbies at each Floor level Overhead and 100% Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the Building Wing. 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 100% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B ( Basement + Ground + First + Second + Third) Floor Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number Sr. No. Common areas and Facilities Proposed Details Percentage of (Yes / No) Actual Work Done () (2) (3) (As on date of the Certificate) (5) (4) No Internal Roads &Footpaths 2 Bore well 100% Water Supply 3 Sewerage(Chamber,lines, SepticTank, Septic Tank 100% STP). 4 Storm Water Drains No 5 Landscaping &Tree Planting Tree planting 100% 6 Street Lighting No 0 7 Community Buildings No 8 Treatment and disposal of sewage and No 0 sullage water. 9 No Solid Waste management &Disposal 10 Water conservation / RWH 100% Rain water harvesting No 11. Energy management 12. Yes 0 Fire protection and fire safety requirements 13 Yes 100% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). TABLE-A Building MAULICOMPLEX (Basement +Ground + First to Seventh) Floor Sr. Tasks / Activity Percentage of Actual No. Work Done (2) (1) (As on dale of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) Plinth 100% 4. Stilt Floor 5. 6 Slabs of Super Structure 55.55% 7 Internalwalls, Internal Plaster, Floorings, Doors and windows within 55.55% Flats/Premises SanitaryFittings within the Flat/Premises 60% 9 Staircases, lifts, Wells and Lobbies at each Flor level Overhead and 60% Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 60% terraces with waterproofing of the Building Wing. 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 60% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase / Project Number( Basement + Ground + First to Seventh) Floor Sr. No. Common areas and Facilities Proposed Percentage of Details (Yes / No) Actual Work Done () (2) (3) (Ason date of the Certificate) (5) (4) 1, No Internal Roads &Footpaths 2. Bore well 100% Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 50% 6 Street Lighting No 7 Community Buildings No 8 Treatment and disposal of sewage and No 0 sullage water. 9. No 0 Solid Waste management &Disposal 10. Water conservation / RWH 100% Rain water harvesting No 11. Energy management 12. Yes Fire protection and fire safety 0 requirements 13 Yes 100% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, Signature &Name :Shraddha Sagane (License No. ...........) Arch. Shraddha Sagane (B. Arch.) Lic. No. CA/2016/75503 Agreed and Accepted by: Moan Associates FF-27, Venus Plaza, Signature of Promoter Name: Shegaon Naka, AMRAVATI. Date: 15/07/2024