Annexure A FORM 1 |see Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 03/10/2023 To, The Mauli Associates, FFS- 27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate or Percentage of Completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 being developed by Mauli Associates Sir, UWe ShraddhaSagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex having Maha RERARegistration Number P50300028628 being developed by Mauli Associates Based on SiteInspection, with respect tothe aforesaid Real Estate Project .I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 11. 10. 9 8. 7 6 5. 4 3. 1. () No. Sr. required Building/Wing, External asterraces Installation compliance Staircases,Sanitary Underground Water Tanks Flats/Premises Internal Slabs Floor Excavation Basements Stilt PlinthPodiums any)(if any)(if activities. other Any entrance per of to with Fittings walls, Super lobby;s. CFO plumbing lifts, complete to of waterproofing Lifts. InternalStructure Compound conditionsNOC, Wells within plinth water project and and the Plaster, protection,Electrical COMPLEX Building MAULI pumps, external of each at Flat/Premises of ,Lobbies Activity Tasks / Wal as per Building Wing.the Floorings, environment/CRZ and Fire TABLE-A specifications plaster, (2) alpaving fittings, Fighting other Doors elevation, Floor requirements of mechanical Fittings and in areasNOC. level agreement windows appurtenant and completion Overhead Finishing equipment, as Equipment within ofmay Sale. and be to to of Percentage (As Actualof Done 55.55% Certificate) onWork 50% S0% 60% 60% 60% 100% 100% I00% (3) dale of thc Number Common SrNo. 14. 13. 12. 11 10. 9 8 7 6 4 3 2 1. () Areas Treatment (Internal Electrical Solid Sewerage(Chamber, lines,SepticTank, Others Fire Landscaping Planting &Tree Common Waste Internal management protection conservation water Rain Energyharvesting Water / Community Buildings Drains Water Storm and (0ptionreceivingmeter requirements sullage water. and Lighting Street Supply Water External management Roads areas disposal STP). room, (2) to station, and &Footpaths and Add Development sub-station, fire of Facilities more). &Disposal sewage safety TABLE-B and Works) 2 planting Tree Septic Tank Bore well (YesNo) / Proposed in Yes Yes RWH No No No No No No No (3) respect of Work Done the (As Actual Percentage Certificate) on ofRegistered 100% 100% S0% 100% 100% 0 (4) date of Phase the Details Project / (S) CA/2016/75503 Lic.No. ShraddhaSagane Arch. Shan 03/10/2023 Date:Name: Signature Promoterof Agreed Faithfully, (LicenseNo.Signature Yours Associabes Mauli FF-27, Plaza, Venus and & Accepted Name Arch.)(B. ...) Shraddha : by: Sagane