Annexure A FORM 1 Isee Regulation 31] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 7/01/2023 To, The Mauli Associates. FFS-27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate or Percentage of Completion of Construction Work of Mauli Complex having Maha RERA Registration Number Ps0300028628 (Only Applicable after project Registration) being developed by Mauli Associates Sir, /WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex_ having Maha RERA Registration Number P50300028628 ( Only Applicable after project Registration. being developed by Mauli Associates Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. of Work done for each of the I certify that as on the date of this certificate, the Percentage A herein below. The building/Wing of the Real Estate Project under Maha RERA is as per Table entire phase is percentagee of the work executed with respect to each of the activity of the detailed in Table B. TABLE-A Layout / Building/ Wing Number(to be prepared separately for each Layout 'Building /Wing ofthe Project) Sr. Percentage of Actual Tasks Activity No. Work Done (2) () (As on dale of the Certificate) (3) . Excavation Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) Plinth 100% 4. 5. Stilt Floor Slabs of Super Structure . 55.55% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 50% 8. SanitaryFittings within the Flat/Premises 30% 9 Staircases, 1 lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 50% 10. External plumbing and external plaster, elevation, completion of| terraces with waterproofing of the Building Wing. 30% 11. Installationof Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, 30% to conditions of environment/CRZ NOC. Finishing to compliance entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and Extenal Development Works) in respect of the Registered Phase / Project Number Sr. No. Common areas and Facilities Proposed Details Percentage of (Yes / No) Actual Work Done (1) (2) (3) (As on date of the Certificate) (5) (4) 1. Internal Roads &Footpaths No Boarwell 100% 2. Water Supply 3. Sewerage(Chamber.lines,SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 0 6. Street Lighting No 0 7. Community Buildings No 0 8. Treatment and disposal of sewage and No 0 sullage water. 9. No Solid Waste management &Disposal 10. Water conservation/ RWH 100% Rain water harvesting 11. No Energy management 12. Yes Fire protection and fire safety requirements 30% Yes 13. Electrical meter room, sub-station, receiving station, Others (Option to Add more). 14. Yours Faithfully, Signature & Name : Shraddha Sagane (License No. ... Arch. Siraddha Sagaie E. Arch.) . N o . CA/701.5/75503 Agreed and Accepted by: Signature of Promoter Name: Name C AS50Ci0ies Date: FE-27, Vanus Piaza, S h e g a o n N a k a , AMRAVATI.