Annexure A FORMI Isee Regulation 31| ARCHITECT'S CERTIFICATE withdrawal of (To be submitted at the time of Registration of Ongoing Project and tor Money from Designated Account) Date: 16/09/2022 To The Mauli Associates, FFS-27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Cetificate or Percentage of Completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 (Only Applicable after project Registration) being developed by Mauli Associates Sir, I/WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex_ having Maha RERA Registration Number P50300028628 ( Only Applicable after project Registration. being developed by Mauli Associates Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the Dulldng wing of the Real Estate Project under Maha RERA is as per Table A herein below. The Percentage of the work executed with respect to cach of the activity of the entire phase is detailed in Table B. TABLE-A Layout / Building / Wing Number(to be prepared separately for each Layout 'Building / Wing of the Project) Sr. Tasks/ Activity Percentage of Actual No. (2) Work Done (1) (As on dale of the Certificate) (3) 1 Excavation Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) 4. Plinth 1 100% 5. Stilt Floor Slabs of Super Structure 6. 7 Internal walls, Internal Plaster, Floorings, Doors and windows 55.55% within Flats/Premises 50% 8. SanitaryFittings within the Flat/Premises 9. 10% Staircases, 1 lifts Wells and ,Lobbies at each Floor level Overhead and Underground Water Tanks 50% 10. External plumbing and external plaster, elevation, completion terraces with waterproofing of the Building Wing. of 10% 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical compliance to conditions of environment/CRZ NOC. equipment, entrance lobby;s. plinth Finishing to | 20% protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in Any other activities. agreement of Sale. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase / Proyect Number Sr. No. Common arcas and Facilitics Proposed Details Percentage of (Yes/ No) Actual Work Done (3) (As on date of the () (2) Certificate) (5) (4) No Internal Roads &Footpaths Boarwell 100% Water Supply Sewerage(Chamber,lines,SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No Landscaping &Tree Planting [ree planting 0 5. No 0 6. Street Lighting No 0 7. Community Buildings 8. Treatment and disposal of sewage and No 0 sullage water. 9. No Solid Waste management &Disposal RWH 0% 10. Water conservation/ Rain water harvesting8 No 11 Energy management 12. Yes Fire protection and fire safety requirements 13. Yes 10% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, Signature & Name : Shraddha Sagane (License No. ...... ) Arch. Shraddha Sagane .Arch.) Lic. No. CA!7016/75503 Agreed and Accepted by: AAda Signature of Promoter Name: Name M a u l i Associaies FF-27, Venus Plaza, Date Shegaon Naka, AMRAVATI