Annexure A FORM 1 see Regulation 31 ARCHITECT'S CERTIFICATE o be submitted at the time of Registration of Ongoing Project and tor withdrawal ol Money from Designated Account) Date: 07/06/2022 To, The Mauli Associates, FFS-27, Venus Plaza, Shegaon Naka square, Amravati. 444603 Subject: Certificate or Percentage of Completion of Construction Work of Mauli Complex having Maha RERA Registration Number P50300028628 (Only Applicable after project Registration) being developed by Mauli Associates Sir, I/We Shraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Mauli Complex_ having Maha RERA Registration Number P50300028628 ( Only Applicable after project Registration. being developed by Mauli Associates Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project I certify that asO the date of this certificate. the Percentage of Work done for each of the he Real Estate Project under Maha RERA is as per Table A herein below. The o O the entire phase s PCentage of the work executed with resnect to each of the activity of detailed in Table B. TABLE-AA Layout/ Building/ Wing Number(to be prepared separately for cach Layout 'Building / Wing of the Project) Sr. Percentage of Actual Tasks Activity No. Work Done (2) (1) (As on dale of the Certificate) (3) Excavation Excavation 100% 100% 2 Basements (if any) Podiums (if any) 4. Plinth 100% 5. Stilt Floor Slabs of Super Structure 6. 7. 55% Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 30% 8. SanitaryFittings within the Flat/Premises 10% 9. Staircases, 1 lifts Wells and ,Lobbies at each Floor level Overhead and Underground Water Tanks 30% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing. 10% 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 20% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B o n Areas (Internal and External Development Works) in respect of the Registered Phase rojc Number Sr. No. Details Common areas and Facilities Proposed Percentage of (Yes/ No) Actual Work Done () (2) (3) (As on date of the Certificate) (5) (4) Internal Roads &Footpaths No 2 Boarwell 100% Water Supply . Sewerage(Chamber,lines, SepticTank, Septic Tank 100% STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 6. Street Lighting No 0 . Community Buildings No 3. Treatment and disposal of sewage and sullage water. No 0 9. No 0 Solid Waste management &Disposal 10 Water conservation/ RWH 0% Rain water harvesting 11. No Energy management 12 Fire protection and fire Yes safety requirements 13. 10% Electrical meter room, sub-station, Yes receiving station, 14. Others (Option to Add more). Yours Faithfully, (agane Signature & Name : Shraddha Sagane (License No. ........) Arch. Shraddha Sagane (3. Arch.) Lle. No. CA/2018/75503 Agreed and Accepted by: Signature of Promoter Name: Mauli Associates Name: FF-27, Venus Plaza, Date: Shegaon Naka, AMRAVATI.