FORM 1 ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account – Building/Wing wise) To Date: 16/09/19 The J.K Investors (Bombay) Limited, New Hind house, NarottamMorarjeeMarg Ballard Estate, Mumbai Pin-400001. Subject: Certificate of Percentage of Completion of Construction Work of Gautam Nagarphase-1 Building Nos. 6 and 7of the Project NEW RERA Registration situated on the Plot bearing C.N. No / CTS No. / Survey no. Final Plot no R-16 and R 17 demarcated by its boundaries (latitude and longitude of the end points) 20 mt road to the North of plot 16, Amenity P11 to the south of the of plot no17,Remaining plot of R-16 & R-17 to the East,20 Mtr Roadto the West of Additional Amravati Industrial Area, Nandgaonpeth ,AmravatiDistrict AmravatiPIN 444901 admeasuring 22585 sq.mt.on which 1009 sq.mt.areais being developed byJ.K Investors (Bombay) Limited. Sir, WeDESIGNO Architects have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Gautam Nagar phase-1 Building Nos. 6 and 7 of the Project, situated on the plot bearing C. N. No/ CTS No. Survey no. / Final Plot no R 16 & R 17of Additional Amravati Industrial Area, Nandgaonpeth ,Amravati ,Division Amravati village Talkandataluka& District Amravati PIN444901admeasuring22585 sq.mt. on which 1009 sq.mt.areais being developed by J.K Investors (Bombay) Limited. 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s Designo Architectsas Architect (ii) M/s Structural Concept Designs Pvt. Ltd. as Structural Consultant (iii) M/s Electro-mech Consultants as MEP Consultant (iv) Shri Alok Hazari as Site Engineer Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project as registered vide new registration under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A Building / Wing bearing Number6 or called Building No. 6 (to be prepared separately for each Building / Wing of the Real Estate Project) Sr.No Tasks / Activity Percentage of workdone 1 Excavation 0 2 Number of Basement(s) and Plinth 1 0 3 0 Number of Podiums 0 4 Stilt Floor-1 0 5 4 Number of slabs of super structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0 Electrical fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 External plumbing and external plaster, elevation , 0 completion of terrace with the waterproofing of the building. 10 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE – B Internal & External Development Works in Respect of the each Building/Wing project S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths YES 0 As per sanctioned plan 2 Water Supply YES 0 As per sanctioned plan 3 Sewerage (chamber, sewage lines), YES 0 As per sanctioned Storm Water Drains plan 4 Storm Water Drains YES 0 As per sanctioned plan 5 Landscaping & Tree Planting NO 0 6 Street Lighting YES 0 As per requirement 7 Community Building NO 0 8 Treatment and disposal of sewage YES 0 As per sanctioned and sullage water plan 9 Solid Waste management & Disposal NO 0 10 Water conservation, Rain water YES 0 As per sanctioned harvesting plan 11 Energy management NO 0 12 Fire protection and fire safety YES 0 As per Fire NOC requirements 13 Electrical meter room, sub-station, YES 0 As per sanctioned receiving station plan 14 Other NO 0 Table A Building / Wing bearing Number 7 or called Building No. 7 (to be prepared separately for each Building / Wing of the Real Estate Project) Sr.No Tasks / Activity Percentage of workdone 1 Excavation 0 2 Number of Basement(s) and Plinth 1 0 3 0 Number of Podiums 0 4 Stilt Floor-1 0 5 4 Number of slabs of super structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0 Electrical fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 External plumbing and external plaster, elevation , 0 completion of terrace with the waterproofing of the building. 10 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE – B Internal & External Development Works in Respect of the each Building/Wing project S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths YES 0 As per sanctioned plan 2 Water Supply YES 0 As per sanctioned plan 3 Sewerage (chamber, sewage lines), YES 0 As per sanctioned Storm Water Drains plan 4 Storm Water Drains YES 0 As per sanctioned plan 5 Landscaping & Tree Planting NO 0 6 Street Lighting YES 0 As per requirement 7 Community Building NO 0 8 Treatment and disposal of sewage YES 0 As per sanctioned and sullage water plan 9 Solid Waste management & Disposal NO 0 10 Water conservation, Rain water YES 0 As per sanctioned harvesting plan 11 Energy management NO 0 12 Fire protection and fire safety YES 0 As per Fire NOC requirements 13 Electrical meter room, sub-station, YES 0 As per sanctioned receiving station plan 14 Other NO 0 Yours Faithfully Signature & Name of Architect – AR PRADEEP DHORE License no. - CA/91/13873.)