SHAILENDRA DESHMUKH & SS 0CI ATE S A ARCHITECTS, INTERIOR DESIGNERS APPROVED VALUER & GOVT. OFFICE: "VRINDAVAN PH.NO :-OFF. ( SANKUL" PANCHAVATI SQUARE, AMRAVATI-444603 0721)2667233, MOB.9 42342 40 FORM 1see Regulation 3] ARCHITECT'S CERTIFICATE (O De submitted at the time of Reaistration of Ongoina Project and for witharawao Money from Designated Account) Date: 11/11/2024 To, KASTURI HEIGHTS CIO Shree Gajanan Wasudeo Patil Amravati 444604. Subject : Certificate of Percentage of Completion of Construction Work of Kastur1 Heights Building(s) 1 of the Only Phase of the Project [ P 50300019254 ] situated on the Plot bearing C.N. No/CTS No. /Survey no., --... Final Plot no. 11B, 12A _Survey no, 195/3 Bdemarcated by its boundaries ( latitude and longitude of the end points) plot No. 11-A to the North, Plot no. 12-B to the South, Adi. layout to the East, 12 M VWide Road to the West of Division Rahatgaon village -- Taluka Amravati District Amravati PIN 444604 admeasuring 470.71 sq.mts. Area being developed by Shree. Gajanan Wasudeo Patil. Sir, / We Shailendra Deshmukh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Kasturi Heights Building(s) 1 of the Only Phase of the Project [P 50300019254 ] situated on the Plot bearing C.N. No/CTS No. /Survey no --/Final Plot no. 11B, 12A Survey no, 195/3 B demarcated by its boundaries (latitude and longitude of the end points) plot No. 11-A to the North, Plot no. 12-B to the South, Adj. layout to the East, 12 M Wide Road to the West of Division Rahataaon village -- Taluka Amravati District Amravati PIN 444604 admeasuring 470.71 sg.mts. Area being developed by Shree. Gajanan Wasudeo Patil. 1. Following technical professionals are appointed by Owner /Promoter: () M/s/Shri/Smt Shailendra Deshmukh as LS. / Architect: A L E N O A D DESA (i) M/s /Shri/ Smt Pankaj Deshmukh as Structural Consultant Reg. No. CAI97121932 (ii) M/s /Shri / Smt as MEP Consultant (iv) M/s IShri / Smt ------ as Site Supervisor EORM-4 [see Regulatinn 21 Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P 50300019254 under Maha-RERAis as per table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Bulcing Ming Number KASTURI HEIGHTS (to be prepared separately for each Building Wing of the Project ) Sr. Tasks IActivity Percentage No of work done 1 Excavation 100 % 2 O(zero) number of Basement(s) and 1(One) Plinth 100 % 3 0(zero) number of Podiums Nil 4 Stilt Floor 0% 5 6(Six)number of Slabs of Super Structure 100 % 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 100 % Doors and Windows to each of the FlatPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 100 % the Flat/Premises 8 Staircases, Lifts VWells and Lobbies at each Floor level connecting 85% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion 100 % of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 100 % Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobbyls, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to D Obtain Occupation /Completion Certificate NDRADESHD Reg. No. CA/97121932 RCHITE SHAILENDRA DESHMUKH CA/97/21932 Reg.no. Faithfully AR. Yours S.No. 14. 12. 9 7 6 5 2 13. 11. 10. 4. 3. 1 Internal Electrical Others (receiving station, station management protection requirement Fire andEnergy harvesting Water Treatment Community Lighting Buildings Water StreetLandscaping Drains Storm(chamber, Sewerage WaterInternal lines,Supply Common Disposal Solidsewageand Tank, Septic STP) conservation, Waste & Option Roads External meter and Amenities areas managementsullage water & to room, disposal Tree & Add Footpaths Development and safetyfire Rain sub Planting more) Facilities, water of & Works CHITECAI97/21932 Reg.No. NORA O TABLE-B Proposed (Yes/No) DESM NA Yes Yes Yes Yes Yes Yes in HR No No No No NoYes No Respect Work done Percentage % 0 0% 0 0 0 0 0 0 0 100 %100 % of % 0 % % % % 0 NA of the % % % % entire NA requirements of thperAswork authority work NA Completion of At completion of At NA PROJECT NIL Start WorkYet to NACOMPLITION OF ATPlanperAs PlanperAsWork NA The the THE Registered time time TIME Yet Details of to of OF start Phase