A.A. CHANDELE CONSULTING CIVIL ENGR RUKHMINI NAGAR AMRAVATI MOB N0: 9766785598 FORM 2 ENGINEER'S CERTIFICATE To, Date: 31/03/2024 The M/s. OM SAICONSTRUCTION ( SHREE GAJANAN WASUDEV PATIL ), Subject: Certificate of Cost Incurred for Development of KASTURI HEIGHTS having MahaRERA Registration Number P50300019254 (Only applicable after Project Registration) being Developed by Om SaiConstruction. Sir, 1. I/We A. A, CHANDELE have undertaken assignment of Certifying Estimated Cost for Kasturi Heights having MahaRERA Registration Number P50300019254 (Only applicable after Project Registration) being Developed by Om Sai Construction. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external worksof the Project as per the specifications mentioned inthe Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by me Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain /confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 1,8O,44,645/- (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil. MEP & Allied Works completion of the apartments && proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) /Wing(s) / Layout /Plotted Development from the Amravati Municipal Corporation, Amravati being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 1,85,77,793/- (Total of Table A & B). The Amount of Estmated Cost Incurred is.calculated on the basis ofinput.materials /services used && unit cost of these items. for 5. The Balance Cost of completion of the Civil, MEP & Allied Works completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 0/- (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A &B below: TABLE- A Building / Wing bearing Number 1 in Kasturi Heights Project) (to be prepared separately of each Building / Wing/ of the Real Estate Amounts Sr. No. Particulars Total Estimated Cost of Building / Wing as on Rs. 1,50,00,000/ 1 31/03/2024 date of Registration is 1,55,33.148/ 2 Cost incurred as on 31/03/2024 date of Certificate Rs. Work done in Percentage 100.00 % 3 (as Percentage of the estimated cost) Balance Cost to be Incurred Rs. 0/ 4 (Based on Estimated Cost) on Cost Incurred on Additional / Extra Items as Rs. 16,50,000/ A) not included in the Estimated Cost (Annexure TABLE-B Internal & External Development Works in respect of Registered Phase Sr. No. Particulars Amounts Total Estimated Cost of Internal & External 1 Development Works including amenities & Rs. 5,00,000/ facilities in the Layout as on 31/03/2024 date of Registration is 2 Cost incurred as on 31/03/2024 date of Certificate Rs. 5,00,000/ Work Done in Percentage 100% (as Percentage of Estimated Cost) 4 Balance Cost to be incurred (based on Estimated Cost) Cost incurred on Additional/ Extra Items not Rs. 8,94,645/ 5 included in the Estimated Cost (Table-C) Agreed & Accepted by: AMIT CHANDELE D.C.E.,B.E. (CIVIL) L.No.R.P.Am/Er-1/106/2020-2022 Rukhmini Nagar, Amravati Mob - 9766785598 Signature of Promoter Yours Faithfully Name: Om Sai Construction Signature Date: 31/03/2024 AMIT CHANDELE