SHAILENDRADESHMUKH & ASS 0CI ATE S ARCHITECIS INIERIOR DESIGNERS &GOVI APPROVED VALUER OFRCE "VEINDAVAN $ANKUL" PANCHAVAtI SQUARE. AMRAVAIL44A603 PHNO OFf.(07 2 1)2667 233, MOB 9423A2 4013 FORM 1(see Regulation ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of OngoingProject and for withdrawal of Money from Designated Account) Date: 20/03/2024 To, KASTURIHEIGHTS CJO Shree Gajanan Wasudeo Patil Amravati - 444604. Subject : Certificate of Percentage of Completion of Construction Work of Kasturi Heights Building(s)1 of the Only Phase of the Project [P 50300019254 ] situated on the Plot bearing C.N. No/CTS No. /Survey no.----Final Plot no. 11B, 12A Survey no. 195/3 Bdemarcated by its boundaries ( latitude and longitude of the end points) plot No. 11-A to the North, Plot no. 12-Bto the South, Adj. layout to the East, 12 MWide Road to the West of Division Rahatgaon village - Taluka Amravati District Amravati PIN 444604 admeasuring 470.71sq.mts. Area being developed by Shree. Gajanan Wasudeo Patil. Sir, WWe Shailendra Deshmukh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Kasturi Heights Building(s) 1 of the Only Phase of the Project [P 50300019254 ]situated on the Plot bearing C.N. NolCTS No. ISurvey no. ---|Final Plot no. 11B, 12ASurvey no, 195/3 B_ demarcated by its boundaries ( latitude and longitude of the end points) plot No. 11-A to the North, Plot no. 12-B to the South, Adj. layout to the East, 12 MWide Road to the West of Division Rahatgaon village -- Taluka Amravati District Amravati PIN 444604 admeasuring 470.71 sq.mts. Area being developed by Shree. Gajanan Wasudeo Patil. 1.Following technical professionals are appointed by Owner / Promoter : (0) M/s/Shri/Smt Shailendra Deshmukh as L.S. /Architect; () M/s /Shri / Smt PankajDeshmukh as Structural Consultant (ii) M/s /Shri /Smt as MEP Consultant (iv) M/s /Shri /Smt as Site Supervisor Based onSite Inspection, with respect to each of the BuildingWing of the aforesaid Real Estate Project , Icertify that as on the date of this certificate, the Percentage of Work done for each of the buildingWing of the Real Estate Project as registered vide number P 5030001 9254 under Maha-RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Bulding Wing Number KASTURI HEIGHTS_ (to be prepared separately for each Building / Wing of the Project ) Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 0(zero) number of Basement(s) and 1(0ne) Plinth 100% 3 0(zero) number of Podiums Ni 4 Stit Floor 0% 5 6(Six) number of Slabs of Super Structure 100 % 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 100 % Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 90 % the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting 90 % Staircasesand Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion 95 % of terraces with waterproofing of the BuildingWing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 90 % Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S.No. Common areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done 1 Internal Roads &Footpaths No NA NA 2. Water Supply Yes 80 % Work started 3 Sewerage (chamber, lines, Yes 80 % As per Plan Septic Tank, STP) 4 Storm Water Drains Yes 0% As per Plan 5 No 0% AT THE TIME OF Landscaping &Tree Planting COMPLITION OF PROJECT 6 Street Lighting No 0% NIL 7. Community Buildings No 0% NA 8 Yes 50 % Work started Treatment and disposal of sewage and sullage water 9 Solid Waste management & No 0% NA Disposal 10. Water conservation, Rain water Yes 0% At the time of harvesting completion of work 11. Energy management No 0% NA 12. Fire protection and fire safety Yes 0% At The time of requirement completion of work 13. Electrical meter room, sub Yas 0% As per the station, receiving station requirements of authority 14. Others ( Option to Add more) NA 0% NA Yours Faithfully AR. SHAILENDRA DESHMUKH Reg. no. CA/97/21932 CAJRK2