(o.c.E.) Civil Engineer & Consultant Swami Apartment, Jatharpeth Chowk, Akola - 444 005 Mobile - 94231 25325 Email- gawatrenarendra@gmail.com Annexure B FORM 2 lsee Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Projecl and for withdrawal of Money from Designated Acoor.tnt-Project Wise) Oate:19.01.2o26 To, SS Life Spaces Akola, MAHARASHTRA,444001 Subiect : Certificate of Cost lncurred for Development of S S Diamond having MahaRERA Registration Number P50100053908 (Only Applicable after projecl Registartion) being developed by SS Life Spaces Sir, l/We Narendra Gawatre have of Certifying Estimated Cost for S S Dlamond having MahaRERA Registration Number P50100053908 (Only Applicable after projecl Registration, being developed by SS Life Spacee 1 2,We have Estimated the cost of Civil, MEP and ellied works required for completion of the apartments and .proportionate completion of internal I external works of the proiect as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection caffied out by us to ascertain / confirm the above analysis given to us. 3. We estimate Tolal estimated the Cost of completion of thc aforesaid project under reference at Rs. 122200000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & extemalworks,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) A/Mng(s)/ Layout /Plotted Development from the Akola unicipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 77006800.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services us6d and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Pfoject is estimated at Rs 45193200.00 (Total of Table A and B) Page 1 of4 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as mmpleted on the date of this certificate is as given in Table A and B below: Table-A otal Estimated Cost of the lncurred on the AdditionauExtra items not included in Page 2 of4 Table B lnternal and External Works in respect of the Phase Sr. No. ParlicularB Amount (ln Rs.) (1t 1 Total Estimated Cost of the BuildangMing/Layout 0 Plotted Development as on date of Reqistration is Cost incurred as on date of certificate 0 Work done in Percentaqe (as Dercentaqe of the estimated cost) 0 4 Balance Cost to be lncuned*.(Based on Estimated Cost) 0 Cost lncurred on the Additional/Extra items not included in the Estimated Cost {Tablc -C) infri Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Lsss than bachelois Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. NA (if applicable) Date of Certificate , 19 /o / fznt Aoread and AcceDted bv: dw For SS Ltr- . Signature of ProfiffiTNER Namei SS Life Spaces s61q. t thrlt*€ 1.The scope of work is to complete Registered Real Estate Project as per drawings approved fiom time to time and aE per specmcations mentioned in qgreement of sale. 2.(') Ouantity suNey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (-) and in case quantity are being calculated by ofiice of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(--) Balance Cost to be incuned (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development ofthe Real Estate Project will result in amendment ofthe cost incuned / to be incuned. 4.All components of work with specifications are indicative and not exhaustive S.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of4 TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost) Pag€ 4 of4