Ar. Chirag Rahate Edifice Design Studio 1st Floor, Vtiayshree Apartment, Durga Square, Akola Phone: 9767671 977 | Email: chiragoSrahate@gmait.com Annexure A FORM 1 [see Regulation 3] ARCHITEGT'S CERTIFICATE (To b6 submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, SS LIFE SPACES ; lgls)la62s AKOLA, MAHARASHTM, 444001 Subject : Certificate of percentage of Work of completion of construction work of S S Diamond having MahaRERA Registration Number P50100053908 (OnlyApplic€ble after prqect Registartion) being developed by SS L|FE SpACES Sir, lM/e CHIRAG PRABHUDAS RAHATE have undertaken assignment as Architect /Licensed Surveyor of certilying percentag( of completion of Construclion Work of S S Diamond having MahaRERA Registration Number psolO0OS39OB (Only Applicab after project Registration, being devetoped by SS LIFE SPACES ) Basod on Site lnspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate proJect I certify that as on the date of this certific€te, the Percentage of Work done for each of the buildingMing of the Real Estate project under MahaREM is as per Table A horein below The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Number: S S Diamond/NA Sr. No. Task8/Activity Percentao€ of Actual Work Done (As on dste of the Certificate) t2t (3) 1 Excavation 100 00 Basements (if anv) 100.00 ; Podiums (if any) 0.00 4 Plinlh, 100.00 Stilt Floor 0.00 :b Slabs of Super Struclure 100.00 7 lnlemal vyalls, lntemal plaster, 75.00 Floorinos- Floors and windows I Sanitsry Fitting within lhe 55.00 Thank you for choosing Edifice Design Studio Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Ccrtifi.rlE\ I and Lobbies at each Floor level Overhead and 52.00 '10 and..external plaster, elevation, completion of terraces 45.00 11 Fittinss and Equipment as '10.00 fl!9 fisht!!s equipment, compliance to conditions roDDy/s, plinth entrance lobby/s, to enrrance ptlnth areas appurtenant to B Compound Wall and all as may be required to project bs per specifications in agrbement Page 2 of3 Table B - comm-on Areas (lnternal and External Development works) in respect of Registered Phase / Project Number) Common areas and facilities Percentage of Actual Work Done 11 Yours Faithfully @) cHrne? pneeHuDAS RAHATE Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CN2024117 8505) Date of Certificate: Signature df P Name: SS Life Spaces Date: I ?L2 [2 oz, Page 3 of3