Nrerdra1malrep.c.e; Civil Engineer & Consultant Swami Apartment, Jatharpeth Chowk, Akola- 444 fr)s Mobile - 94231 25325 Email- gawatrenarendra@gmail.com FORM-2 [see Regulation 3l ENGINEER' S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certificate from 01.01 .2025 to 31.03.2025) Date: l7l 0412025 To SS Life Space, Lohiya Nrg*, Kholeshwar, Akola - 444 001. Subject Certificate of Cost Incurred for Development of S S Diamond having MahaRERA Registration No.P50100053908 being developed by SS Life Space. Sir, I, Narendra Gawatre have undertaken assignment of certiffing Estimated Cost for the S S Diamond having Maha RERA Registration No. P501m053908 being developed by SS Life Space 2. Wb have estimated the cost of the completion to obtain Occupation Certifrcate/Compfetion Certificate, of the Civil, MEP and Allied works, of the building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by me appointed by Developer and the assumption of the cost of nrateriat, labour and o,ther irputs madE by del'elo,per, aadthe site irspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesaid poject under reference as Rs.12r22r00r{n0.00 at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certiticate/completion certiticate tbr the building from the Akola Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 7r49,67,W.fi). The amount of Estimated Cost Incurred is calculated on the basis of input material /services used and unit cost ofthese items. 5. The Balance cost of Completion of the Civil, MEP andAllied works of the Building of the subject project to obtain Occupation Certificak/Completion Ce{ificate from Akola Municipal Corporation is estimated at Rs. 4;72,33,0N.(X) because project under construction & in progress. 6. I certi$ that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Thble A and B below : TABLE A Building - SS Diamond Sr.No larticulars Amounts I total Estimated cost of the Building SS Diamond as Rs. 12,22,00,000.00 rn the date of Resistration is lost incurred as on date of certificate Fis.7,49,67,000.00 il/ork done in Percentage @ased on Estimate Cost) 61.3s % t ]alanee Cost to he tracurred (Based ooEstinnate Cost) Rs. 4,72,31.000.00 Cost Incurred onAdditional /Extra Items not included N.A. in the estimated cost (Table-C) Table B lnternal de External Development Works in Respect of the Resistered Phase ir. No. Particulars tmounts lotal Estimated cost of the Internal and External Rs. N.A. Development Works including amenities and facilities in ihe trayout as o* datc of Eegistration is lost incurred as on date of certificate R.s. N.A. Work done in Percentage (Based on Estimate Cost) 3.s. N.A. + Salance Cost to be Incurred (Based on Estimate Cost) ls. N.A. ) lost trncurred o*lAdditiorel lExtra I@rns.not ir,rctruded in es. N.A. he estimated cost (Table-C) Yours Faitlfully, ;,;aiEi?AE-watreto.ce) $vit Ergineer&ConsulEnt' Srvail epartment Jarrarpefricd;,fi AKotA Narendra Gawatre Name of Engineer & Sign Agreed andAccepted by: FO'EC UFE SPACE \q#o[,n=* Signature of Promoter Name :Pratik Vinod Lohiya Date: 17.U.2A25 Place - AKOLA