[1 x erdr a 6 aw atr e1o. c.e.1 Civil Englne€r & ConsLdtant Swaml Apartm€nt, Jalharpeth Cho'vk, Akola -,{44 005 nbblle - 94231 2S25 Emai! gawatr€nargndra@grnail.com FORM-2 [see Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certificate from 01.01.2024 to 31.03.2024) Datc: l5l 01 12024 To SS Life Space, Lohiya Nagar, Kholeshwar, Akola - 444 001. Subject: Certificate of Cost Incurred for Development of S S Diemond having MahaRERA Registration No.P50100053908 being developed by SS Life Space. Sir, I Narendra Gawatre have undertaken assignment of certifuing Estimated Cost for the S S Diamondhaving MahaRERA Registration No.P50100053908 being developed by SS Life Space 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by me appointed by Developer and the assumption ofthe cost of material, labour and other inputs made by developer, and the site inspection caried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs.12,22,00,000.00 at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate lbr the building tiom the Akola Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 2,95,67,000.00. The amount of Estimated Cost Incurred is calculated on the basis of input material/services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied work of the Building of the subject project to obtain Occupation Certificate/Contpletion Certificate frorn Akola Municipal Corporation is estimated at Rs. 9,2632,000.00 because project under construction & in progress. 6, I certifu that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A and B below : TABLE A tsuilding - SS Diamond Amounts fotai Estimateci cost of the Buiiding SS Diamond as on Rs. i2,22,00,000.00 lhe date ofReeistration is 2 Cost incuned as on date ofcertificate Rs. 2,95,67,000.00 Work done in Percentage (Based on F.stimate Cost) ).4.00 o/o 4 Balance Cost to be Incurred (Based on Estimate Cost) Rs. 9,26,32,000.00 ) Cost Incurred on Additional /Extra Items not included N.A. in the estimated cost (Table-C) Table B Intemal & External Development Works in Resoect of the Registered Phase Sr. No. Particulars Amounts Iotal Estimated costof the Intemal and Extemal Rs. N.A. Development Works including amenities and facilities in Lhe layout as on date of Registration is I Cost incurreii as on