SHAILENDRA DESHMUKH & ASSOCIATES ARCHITECTS, INTERIOR DESIGNERS & GOW. APPROVED VAI.UER OFFICE: "VRINDAVAN SANKUL" PANCHAVATT SeUARE, AMRAVATI-444603 PH.NO :-OFF. 1O72112667233, MOB 94 23 42 40 13 FORM 'l [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) Date 2010112020 To, M/S GARDEN CITY, Kathora Road Amravati - 444604. Subject: Gertificate of Percentage of Completion of Construction Work of Garden city Building(s) 1 of the one Phases of the project [New Registration] KAMAL Building situated on the Plot bearing C.N. No/CTS No./ Final plot no. 1, Survey no'l28/2 Mouia Navsari demarcated by its boundaries ( latitude and longitude of the end points) Survey No. 12811 to the North, Survev No. 128/3 to the South, Survey Nr, 12911 lo the East, 12.00 M wide road to the West of village - Taluka Amravati District Amravati PIN 444604 admeasuring 11 151.55 sq.mts. Area being developed by M/S GARDEN CITY through partner Mr. Nilesh P. Thakare and Mrs.yogita Nilesh Thakare. Sir, l/ we shailendra Deshmukh have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of completion of construction work of Garden crtv Building(s) 1 of the one Phase of the Project [New Registration] KAMAL Building srtuated on the Plot bearing c.N. No/crs No./ Final Plot no. 1-survey no.12\t2 demarcated by its boundaries ( latitude and longitude of the end points) Survey No. 128/1 to the North, Survev N o. 12813 to the South, Survey No, 12911 to the East, '12.00 M wide road to the West of vrt age Taluka Amravati District Amravati PIN 444604 admeasuring 11151.5s sq.mts. Area berng developed by M/s GARDEN clrY through partner Mr. Nilesh p. Thakare and Mrs.yogita Nilesh Thakare. 1. Following technical professionals are appointed by Owner / promoter :- (i) M/s/Shri/Smt Shailendra Deshmukh as L.S. / Archite ct; (ii) M/s /Shri / Smt Nice Cons. Nagpur as Structural Consultant (iii) M/s /Shri / Smt ------ as MEP Consuttant (iv) M/s /Shri / Smt Sanchit P. Patil as Site Supervisor Based on Site lnspection, with respect to each of the BurtdrngAlVrng of the aforesard Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number New Reqistration under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Tabte B Table A Eight no. of Building /Wing Number ' KAMAL' Buitding of Garden Citv (to be prepared separately for each Building Ming of the Project) Sr. Tasks /Activity Percentage No of work done 1 Excavation TOYo 2 0 (zero) number of Basement(s) and 1(One) Plinth 50% 3 0 (zero) number of Podiums Nit 4 Stilt Floor 0% 5 I (Eioht) number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within Flats/Premises, OYo Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlauPremises, Electrical Fittings within o% the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0o/o Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, elevation, completion OYo of terraces with waterproofing of the BuildingANing, 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, ptrnth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B lnternal & External Development Works in Respect of the entire Registered phase S.No. Common areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done 1 lnternal Roads & Footpaths YES NA NA 2 Water Supply Yes 60 0h Borewell and Pump installed 3 Sewerage (chamber, lines, Yes 30 0k As pe' P 3' Septic Tank , STP) 4 Storm Water Drains Yes 0Yo As per Plan 5 Landscaping & Tree Planting Yes 0 o/o AT THE TIME OF COMPLITION OF PROJECT 6 Street Lighting Yes ooh NIL 7 Community Buildings Yes O o/o AT THE TIIVIE OF CO[IPLITION OF PROJECT I Treatment and disposal of Yes 0%o Work in sewage and sullage water progress I Solid Waste management & No O o/o NA Disposal 10 Water conservation, Rain waler Yes O o/o At the time of harvesting completion of work 11 Energy management No O o/o NA 't2 Fire protection and fire safety Yes 0% N.A requirement 13 Electrical meter room, sub- Yes 0%o As per the station, receiving station requrrements of authority 14 Others ( Option to Add more) NA 0 o/o NA Yours Faithfully AR. SHAILENDRA DESHMUKH Reg. no. CN97121932