SHAILENDRA OESHMUKH & ASSOCIATES ARCHITEC]S, NIER]']R DES GNL R5 & GOVT. APPROVED VALUER OFFICE: "vRINDAVAN SANKUT-" PANCHAVATT SeUARE, AMRAV AIt-444603 PH.NO:-OFF.(0/21 ) 2 6 6 7 23 3, MOB.9 4 23 42 40 1 3 FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) Date:201O112020 To, M/S GARDEN CITY, Kathora Road Amravati - 444604. subject: certificate of Percentage of Gompletion of construction work of Garden city Building(s) I of the one phases of the project [New Registration] cHAFA Building situated on the Plot bearing c.N. No/crs No./ Final plot no. l,_survey no'l28/i Mouia Navsari demarcated by its boundaries ( latitude and longitude of the end points) survey No. 12811 lo the North, Survev No. i2gl3 to the south, survey No. 12911 lo the East, {2.00 M wide road to the west of village - Taluka Amravati District Amravati PIN 444604 admeasuring 1 1 151.s5 sq.mts. Area being developed by M/s GARDEN clrY through partner Mr. Nilesh p. Thakare and Mrs.yogita Nilesh rhakare. Sir, l/ we shailendra Deshmukh have undertaken assignmenl as Archrtect r'Lrcensetj surveyor of certifying Percentage of completion of construction work of Garden city Building(s) 1 of the one Phase of the Project [New Registration] CHAFA Buitding situated on the Plot bearing c.N. No/crs No./ Final Plot no. 1-survey no.12gt2 denarcated by its boundaries ( latitude and longitude of the end points) Survey No. 128/1 to the North e rve No 128, J to the South, Survey No. 12911 to the East, 12.00 M wide road to the West of viltage -- Taluka Amravati District Amravati PIN 444604 admeasuring 1 1 1s1 .55 sq.mts. Area being developed by M/S GARDEN CITY through partner Mr. Nilesh p. Thakare and Mrs yogita Nilesh Thakare. 1. Following technical professionals are appointed by Owner / promoter :- (i) M/s/Shri/Smt Shailendra Deshmukh as L.S. / Architect ; (ii) M/s /Shri / Smt Nice Cons. Nagpur as Structurat Consuttant (iii) M/s /Shri / Smt ------ as MEP Consultant (iv) M/s /Shri / Smt Sanchit P. Patil as Site Supervisor Based on Site lnspection, with respect to each of the BuildrngAruing of the aforesard Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number New Reqistration under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase rs detatled rn Tabte B Table A Eight no. of Building Ming Number " CHAFA" Building of Garden cltv (to be prepared separately for each Building A/r'ing of the project) Sr. Tasks /Activity Percentage No of work done 1 Excavation 90o/o 2 0 (zero) number of Basement(s) and 1(One) Plinth 90% 3 0 (zero) number of Podiums Nit 4 Stilt Floor go% 5 8 (Eiqht) number of Slabs of Super Structure 100% 6 lnternal walls, lnternal Plaster, Floorings within Flats/premises, 50% Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlauPremises, Electricat Fittings within 30% the FlauPremises 8 Stai rcases, Lifts Wells and Lobbies at each Floor level connecting 50% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion 30Yo of terraces with waterproofing of the BuildingANing, 't0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 10% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B lnternal & External Development works in Respect of the entire Registered phase S.No. Gommon areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done 1 lnternal Roads & Footpaths YES NA NA 2 Water Supply Yes 60% Borewell and Pump installed 3 Sewerage (chamber, lines, Yes 3O Yo As per Plan Septic Tank , STP) 4 Storm Water Drains Yes 0Yo As per Plan 5 Landscaping & Tree Planting Yes 0 o/o AT THE TIME OF COMPLITION OF PROJECT 6 Sheet Lighting Yes 00h NIL 7 Community Buildings Yes 0 o/o AT THE TINIE OF co[/PL r1 ,N ,' PROJECT 8 Treatment and disposal of o/o Yes 0 Work in sewage and sullage water progress I Solid Waste management & No 0Yo NA Disposal Water conservation, Rain water I 10 Yes 0% At the time of harvesting completion of work 11. Energy management No 0 o/o NA 12 Fire protection and fire safety Yes A'/, Ni, requirement 13. Electrical meter room, sub- Yes o% As per the station, receiving station requirements of authority 14 Others ( Option to Add more) NA 00k NA Yours Faithfully AR. SHAILENDRA DESHMUKH t Reg. no. CN97121932