SHAILENDRA DESHMUKH & ASSOCIATES ARCHITECTS, INTERIOR DES GNERS & GOVT APPRoVED Va ,,FP OFFICE: "VRINDAVAN SANKUL" pANCHAVAIT SeUARE. AMRAVATI-444603 PH.NO :- OFF. IO72l)2667233, MOB.9 423424013 FORM 'l [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) Date .20t0112020 To, M/S GARDEN CITY, Kathora Road Amravati - 444604. Subiect: Certificate of Percentage of Gompletion of Construction Work of Garden city Building(s) 'l of the one phases of the project [New Registration] JASWAND Building situated on the Plot bearing C.N. No/CTS No./ Finat ptor no .1 survey no4g4--u.qia Navsalldemarcated by its boundaries ( ratitude and rongitude of the end points) Survey No. 128/i to the North, Survev No. 128/3 to the South, Survey No. 'l.2911 to the East, 12.00 M wide road to the West of village Taluka - Amravati District Amravati PIN 444604 admeasuring 1l l s1.s5 sq.mts. Area being developed by M/S GARDEN CITY through partner Mr. Nitesh p Thakare ar.l Mrs.Yogita Nilesh Thakare. Sir l/ we shailendra Deshmukh have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of completion of construction work of Garden crty Building(s) 1 of the one Phase of the project [New Registration] JASWAND Buitding situated on the Plot bearing c.N. No/crs No./ Final plot no. 1-survey no_12812 demarcated by its boundaries ( latitude and longitude of the end points) Survey No. 128/1 to the North Surve No 128 to the south, survey No. 12911 to the East, 12.00 M wide road to the west of vrltage -- Taluka Amravati District Amravati PIN 444604 admeasuring 1 1 151 .55 sq.mts. Area being developed by M/s GARDEN clrY through partner Mr. Nilesh p. Thakare and Mrs.yogita Nilesh Thakare. 1. Following technical professionals are appointed by Owner / promoter :- (i) M/s/Shri/Smt Shailendra Deshmukh as L.S. / Architect , (ii) M/s iShri / Smt Nice Cons. Nagpur as Structurat Consultant (iii) M/s /Shri / Smt ------ as MEP Consuttant (iv) M/s /Shri / Smt Sanchit P. Patil as Site Supervisor Based on Site lnspection, with respect to each of the BuildingMing of the aloresard Real Estate Project , I certify that as on the date of this certificate, the percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number New Reoistration under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase rs delarled rn Tab e tl Table A Eight no. of Building /Wing Number ' JASWAND" Building of Garden Citv (to be prepared separately for each Building /Wing of the Project) Sr. Tasks /Activity Percentage No of work done 1 Excavation 7Oo/o 2 0 (zero) number of Basement(s) and 1(One) Plinth 70% 3 0 (zero) number of Podiums Nit 4 Stilt Floor 60% 5 8 (Eioht) number of Slabs of Super Structure 1000/o 6 lnternal walls, lnternal Plaster, Floorings within Flats/Premises, 40% Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 100k the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 7lYo Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, elevation, completion SOYo of tenaces with waterproofing of the BuildingA/Ving, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 1Oo/o Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildrngA/Vrng Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B lnternal & External Development works in Respect of the entire Registered phase S.No. Common areas and Facilities, Proposed Percentage Oetails Amenities (Yes/No) of Work done 1 lntemal Roads & Footpaths YES NA NA 2 Water Supply Yes 60% Borewell and Pump installed 3 Sewerage (chamber, lineq Yes 30 Yo As per Plan Septic Tank , STP) 4 Storm Water Drains Yes 0 o/o As per Plan 5 Landscaping & Tree Planting Yes 0?o i. ,r_l r.r, COMPLITION OF PROJECT 6 Street Lighting Yes 0 o/o NIL 7 Community Buildings Yes 0 o/o AT THE TIME OF CON,lPLITION OF PROJECT 8 Treatment and disposal of Yes 0Yo Work in sewage and sullage water progress 9 Solid Waste management & No 00h NA Disposal 10 Water conservation, Rain water Yes o% At the ttme ot harvesting completion of work 11 Energy management No 0 o/o NA 12. Fire protection and fire safety Yes 0 o/o NA requirement 13 Electrical meter room, sub- Yes 0 o/o As per the station, receiving station requirements of authority 14. Others ( Option to Add more) NA 0 o/o NA Yours Faithfully AR, SHAILENDRA DESHMUKH Reg. no. CN97121932 K^*fi