FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 24/01/2022 To, MANISHA BUILDERS AND DEVELOPERS, Amravati. 202, Govind Tower, Vidyut Nagar, Walgaon road, VMV, Certificate of Cost Incurred forDevelopment of Jaee Residency for Subject: Phase (MahaRERA Registration Construction of I building(s)/_ Wing(s) ofthe No./CTS No./Survey No./ Number)_New Registration situated on the Plot bearing C. N. 45/5 Final Plot No.2/3 demarcated by its boundaries (latitude and longitude of the end points) South 18 M WIDE PLOT NO. 1 to the North _PART OF PLOT N0. 3to the ROAD to the East SERVICE LINE to the West of Division - Amravati, Village Amravati, 444 604 admeasuring 558.73 sq.mts. area being Taluka -Amravati, District Amravati, PIN developed by MANISHA BUILDERS AND DEVELOPERS. Ref MahaRERA Registration Number P 50300028493 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project propoaed to be registered under MahaRERA, being JAEE RESIDENCY Buildings Building(s)_1 Wing(s) of the Phase situated on the plot bearing C. N. No./CTS No./ Survey No./ Final Plot No,. 2/3 of Division - Amravati, Village Amravati, Taluka Aamravati - District - Amravati, PIN 444 604 admeasuring 558.73 sq. mts, area being developed by MANISHA BUILDERS AND DEVELOPERS. . Followingtechnical professionals are appointed by Owner/ Promoter: (i) M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech; (i) Shri. Pankaj Deshmukh as Structural Consultant (ii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under items and quantity for the entire reference by the Developer and Consultants and the Schedule of appointed by works as calculated by Mr. Mahesh Vyawahare quantity Surveyor labour and other inputs made by Developer/Engineer, and the assumption of the cost of material, developer, and the site inspection carried out by us. Phase I of the aforesaid 3. We estimate Total Estimated Cost of completion of the building(s) The estimated Total Cost project PhaseI is of project under reference as Rs. 3,57,19,212/-_ of to be completed for the purpose with reference to the Civil, MEP and allied works required Amravati the certificate for the building(s) from obtaining occupation certificate/ completion the aforesaid Municipal Corporation being the Authority under whose jurisdiction Planning project is being implemented. The amount of Estimated calculated at Rs. 3,57,19,212/-. 4. The Estimated Cost Incurred till date is Cost. of amount of Total Estimated Cost Incurred is calculated on the base Phase I of MEP and Allied works of the Building(s) 5. The Balance cost of Completion of the Civil, Completion Certificate from_AMC_ / the subject project to obtain Occupation Certificate (planning Authority) is estimated at Rs. 0-_ as completed on and allied work for the aforesaid Project 6. I certify that the Cost of the Civil, MEP certificate is as given in Table A Below: the date of this TABLE A Jaee Residency Building/ Wing bearing Number 1 Called Real Estate Project) (to be prepared separately for each Building/ Wing ofthe Particulars Amounts Sr. No. () (2) (3) Total Estimated cost of the building/wing as on date of Rs. 3,57,19,212/- Registration is Cost incurred as on 31/12/2021 (Based on the Estimated Rs. 3,57,19,212/- cost) Work done in percentage (as Percentage of the estimated 100% 3 cost) Balance Cost to be incurred (Based on Estimated Cost) Rs. 0/- Cost Incurred on Additional / Extra ltems as on not Rs.0/- 5 includedin the Estimated Cost (Annexure A) Yours Faithfully. Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] Pratiks1a Gurjar B.E.(Civil) Consulting Civil Engineer Agreed And Accepted By Signature of Promoter Name e f e .o9,3T Eiaz, r a g a 7arR,3I4RIadi-88BEO9 Date: Note from as per drawings approved entire Real Estate Project 1. The scope of work is to complete Certificate. Certificate / Completion time to time so as to obtain Occupation be done by an independent be done by office of Engineer or can the 2. () Quantity survey can calculated can be relied upon by whose certificate of quantity Quantity Surveyor, Developer, the name case of independent quantity surveyor being appointed by Engineer. In are being calculated by the place marked (*) and in case quantity has to be mentioned at who is responsible for of Engineer, of the person in the office offrice of Engineer, the name marked (*). should be mentioned at the place the quantity calculated material, equipment and machinery required to carry The estimated cost includes all labour, 3. out entire work. Real deviation in quantity required for development of the As this is an estimated cost, any 4. amendment of the cost incurred/ to be incurred. will result in Estate Project are indicative and not exhaustive. with specifications S. All components of work