FORM-2 (Sec Regulation 3) ENGINEER'S CERTIFICATE Date 23/I I/2021 To, MANISHA BUILDERS AND DEVELOPERS ' 202, Govind Tower, Vidyut Nagar,Walgaon road, VMV , Amravati . Subject : Certificate of Cost Incurred for Development of Jaee Residency for Construction of 1 building(s)/ _1 ___ Wing(s) of the ___ Phase (MahaRERA Regjstration Number )_New Registration situated on the Plot bearing C. N. No./CTS No./Survey NoJ 45/5 Final Plot No.2/3 demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 1 to the North _PART OF PLOT NO. 3 to the South 18 M WIDE ROAD to the East SERVICE LINE to the West of Division - Amravati, Village - Amravati, Taluka -Amravati, District - Amravati, PIN - 444 604 admeasuring 558.73 sq.mts. area being developed by MANISHA BUILDERS AND DEVELOPERS. Ref MahaRERA Registration Number_ P 50300028493 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being JAEE RESIDENCY Buildings Building(s)/ _I __ Wing(s) of the _ _ _ _ _ _ Phase situated on the plot bearing C. N. No./CTS No./ Survey No./ Final Plot No,. 2/3 of Division - Amravati, Village - Amravati , Taluka - Aamravati - District - Amravati, PIN - 444 604 admeasuring 558.73 sq. mts, area being developed by MANISHA BUILDERS AND DEVELOPERS. I. Following technical professionals are appointed by Owner I Promoter:- (i) Mis I Shri/ Smt. Shraddha Sagane as L.S. I Architech ; (ii) Shri.PANKAJ Deshmukh as Structural Consultant (iii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our_estimated cost calculations are based on the Drawings/plants made available to us for the project under the entire reference by the Developer and Consultants and the Sclwdule ur iterns 1111d qw1111ity fo r inted by \ works as calculated by Mr. Mahesh Vynwuh nrc qua11tily Surveyor appo made by Developer/Engineer, and the assumption of the cost or maleri11I , labour 1111d othcr inputs developer, and the site inspection carried out by us. c1forcsaid 3. We estimate Total Estimated Cost of completion of the b11ildi11g( s) Phase I of thc I is project under reference as Rs. 3,35,00,000/- . The estimated Total Cost of prqject Phase of with reference to the Civil, MEP and allied works required lo be completed for the purpose the Amravat i obtaining occupation certificate / completion certificate for th e building( s) from aforesaid Municipal Corporation being the Planning Authority under whose jurisclieli on the project is being implemented. of Es timated 4. The Estimated Cost Incurred till date is calculated at Rs. 3.35,00,000/-. The amount Cost Incurred is calculated on the base of amount of Total Estimated Cost. Phase I of 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building( s) AMC_ the subject project to obtain Occupation Certificate / Completion Certificate from (planning Authority) is estimated at Rs. 0/-_ d on 6. I certify that the Cost of the Civil , MEP and allied work for the aforesaid Project as complete the date of this certificate is as given in Table A Below : TABLE - A Building / Wing bearing Number I Called Jaee Residenc y (to be prepared separately for each Building/ Wing of the Real Estate Project) Sr. No. Particulars Amounts (2) 3) ( I) Total Estimated cost of the building/wing as on date of Rs. 3,35,00,000/- Registration is Cost incurred as on 23 / I I /2021 (Based on the Estimated Rs. 3,35,00,000/- 2 cost) Work done in percentage (as Percentage of the estimated 100% 3 cost) 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 0/- Cost Incurred on Additional / Extra Items as on not Rs.O/- 5 included in the Estimated Cost (Annexure A) Yours Faithfully , Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] ~'cv l Pra ttltsFtacurj ar 6.f ,( CIVIi ) Consult ing Clll!I f f1gltHHlf • No te: s app rov ed from ple te ent ire Re al Est ate Pro jec t as per dra wi ng 1 · ~h e sco ~e of wo rk is to com Ce rtif ica te. as to ob tai n Oc cup ati on Ce rti fic ate / Co mp let ion tim e to tim e so ent be do ne by an ind epe nd vey can be do ne by off ice of En gin eer or can n by the 2 . (*) Qu ant ity sur rel ied upo ose cer tifi cat e of qua nti ty cal cul ate d can be nam e Qu ant ity Su rve yo r, wh sur vey or bei ng app oin ted by De vel op er, the epe nd ent qu ant ity En gin eer . In cas e of ind are bei ng cal cul ate d by pla ce ma rke d (*) and in cas e qu ant ity has to be me nti on ed at the is res po nsi ble for e of the per son in the off ice of En gin eer, wh o off ice of En gin eer, the nam ce ma rke d (*) . uld be me nti on ed at the pla the qu ant ity cal cul ate d sho ed to car ry lab our , ma ter ial , equ ipm ent and ma chi ner y req uir lud es all 3. Th e est im ate d cos t inc ou t ent ire wo rk . al for dev elo pm ent of the Re im ate d cos t, any dev iat ion in qua nti ty req uir ed 4 . As thi s is an est urr ed / to be inc urr ed . e Pro jec t wil l res ult in am end me nt of the cos t inc Es tat ica tiv e and not exh au stive. com po nen ts of wo rk with spe cif ica tio ns are ind 5. All ) l l. ,.. 3 ::;: n ro ;:::\. ~ ;::;· OJ ...... ro - 0 V> C -0 ro ~- V> o· ::> T