FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 9/8/2021 To. MANISHA ANANT LINGOT (MANISHA BUILDERS AND DEVELOPERS,) 202, Govind Tower. Vidyut Nagar, Walgaon road, VMV, Amravati. Subject: Certificate of Cost Incurred for Devclopment of JAEE RESIDENCY No of Building (s)/ 1 Wings (s) of the. Phase of the project situated on bearing C.s. No. /C.T.S. No./ Survey No./Final plot no._45/5/8/2/3 demarcated by its boundaries (latitude and longitude of the end PLOT NO. points) 1 to the North PART OF PLOT NO 3_ to the South_ROADIN LAYOUT to the East SERVICE LANE to the West of Division_AMRAVATI_ village AMRAVATI taluka AMRAVATI District_AMRAVATIPIN 444604 admeasuring _558.73 sq.mtrs. area being developed by [Promoter's Name MANISHA ANANTKUMAR LINGOT (MANISHA BUILDERS AND DEVELOPERS MahaRERA Registration Number- P 50300028493 Sir I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being JAEE RESIDENCY No. of Building (s/ 1Wings (s) of the . Phase of the project situated on the plot bearing C.S. No./C.T.S. No./ Survey No./ Final plot no._45/5/B/2/3 demarcated by its boundaries (latitude and points) PLOT NO. 1 to the North PART OF PLOT NO 3 longitude of the end to the South_ROAD IN LAYOUT to the East_SERVICE LANE to the West of Division_AMRAVATI illage_ AMRAVATI taluka AMRAVATI DistricT-AMRAVATI PIN_444604 admeasuring_558.73sq.mtrs. area DEVELOPERS being developed by MANISHA ANANTKUMAR LINGOT (MANISHA BUILDERS AND Promoter: Following technical professionals are appointed by Owner/ M/s/Shri/ Smt. Shraddha Sagane as L.S./ Architech; Shri.PANKAJ Deshmukh as Structural Consultant (i) (in) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor Certiticate Completion W e have estimated the cost of the completion to obtain Occupationthe Alied works, of tie Building(s) of pnjoet. Our estimated Certificate, of the Civil, MI:P and cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material. labour and other inputs made by developer, and the site inspection carried out by us. 2.We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid Phase I is project under reference as Rs.2.63,75.960/-. The estimated Total Cost of project with reference to the Civil, MEP and allied works required to be completed for the purpose o from the Amravati obtaining occupation certificate l completion certificate for the building(s) Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. amount of Estimated 3. The Estimated Cost Incurred till date is calculated at Rs. 3,05, 13,932/-. The Cost. Cost Incurred is calculated on the base of amount of Total Estimated works of the Building(s) Phase I of 4. The Balance cost of Completion of the Civil, MEP and Allied the subject project to obtain Occupation Certificate / Completion Certificate from_AMC_ (planning Authority) is estimated at Rs. 00/- work for the aforesaid Project as completed on 5. I certify that the Cost of the Civil, MEP and allied the date of this certificate is as given in Table A Below: TABLE- A Jaee Resideney Building/ Wing bearing Number1Called for each Building / Wing of the Real Estate Project) (to be prepared separately Annor S Sr. No. Particulars (2) (3) () building/wing as on Dec 2017 Total Estimated cost of the Rs. 2.63,75,960/- date of Registrationis Cost incurred as on 30.6.2021 (Based on the Estimated Rs. 3,05,13,932/- 2 cost) of the estimated Work done in percentage (as Percentage 100% cost) on Estimated Cost) Rs. 00/ 4 Balance Cost to be incurred (Based Extra ltems as on Cost Incurred on Additional the Estimated Cost (Annexure Rs.0/ 5 02/02/2020 not included in A) Yours Faithfully. Signature of Enginecer. PRATIKSIHA ANILRAO GURJAR] Pratlksta Gurjar B.E.(Civil) EonsuRN CIYI EH r Note: approvc entire Real Estate Project as per drawings h e Scope of work is to complete Certificate / Completion Certificate n c tO time so as to obtain Occupation be done by an independet be done by office of Engineer or can relied upon by tne survey can can be uantity calculated whose certificate of quantity nane the Developer, uantity Surveyor, appointed by of independent quantity surveyor being a r e being calculated by Cgineer. In case quantity case marked (*) and in Tor at the place who is responsible be mentioned the office of Engineer, o s of Engineer, the name of the person in marked ("). oice be mentioned at the place the quantity calculated should to carry machinery required material, equipment and The estimated cost includes all labour, out entire work. the Real development of deviation in quantity required for As this is an estimated cost, any incurred / to be incurred. 4. result in amendment of the cost Estate Project will exhaustive. are indicative and not work with specifications 5. All components of