FORM- See Regulation 3] ARCHITECT'S CERTIFICATE Date:12/08/2021 To, The MANISHA ANANT LINGOT (MANISHA BUILDERS AND DEVELOPERS) FF-27, Venus Plaza, Shegaon Naka Square, Amravati. Subject Certificate of Percentage of Completion of Construction Work of JAEE RESIDENCY No. of Building (s)/ 1 Wings (s) ofthe. Phase of the project situated on the plot bearing C.S. No./C.T.S. No./ Survey No./ Final plot no._45/5/B/2/3 demarcated by its boundaries (latitude and longitude of the end points)_PLOTNO.1 to the North PART OF PLOT NO 3 to the South_ROAD IN LAYOUT to the East _SERVICE LANE to the West of Division_AMRAVATI village. AMRAVATI taluka AMRAVATI_ DistrictAMRAVATI PIN_444604 admeasuring_558.73 sq.mtrs. area being developed by [Promoter's Name MANISHA ANANTKUMAR LINGOT (MANISHA BUILDERS AND DEVELOPERS) MahaRERA Registration Number-P50300028493 Sir, / We SHRADDHA SAGANE have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of JAEE RESIDENCY No. of Building (s)/ 1 Wings (s) of the Phase of the project situated on the plot bearing C.5. No./C.T.S. No./ Survey No./Final plot no._45/5/8/2/3 demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 1 to the North PART OF PLOT NO 3 to the South_ROAD IN LAYOUT to the East _SERVICE LANE to the West of Division _AMRAVATI village AMRAVATI taluka AMRAVATI DistrictAMRAVATI PIN_444604 admeasuring_558.73 sq.mtrs. area being developed by Following technical professionals are appointed by Owner/ promoter ) M/s/ Shri/ Smt. SHRADDHA SAGANE as L.S. / Architect (ii) Shri. PANKAJ Deshmukh as Structural Consultant (ii) Shri. RAVI DESHMUKH as MEP Consultant (iv) Shri. Mahesh Vyawahare as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number_P 50300028493 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building/ Wing Number 1 Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. Excavation 100 O number of Basement(s) and 1 NO. Plinth 100 0 number of Podiums 0 Stilt Floor 0 5 number of Slabs of Super Structure 100 Internal Walls, Internal Plaster, Floorings within 6. Flats/Premises, Doors and Windows to each of the 100 Flat/Premises. Sanitary Fittings within the Flat/Premises, Electrical 7. 100 Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level 8. connecting Staircases and Lifts, Overhead and 100 Underground Water Tanks. The external plumbing and external plaster, elevation, 9. completion of terraces with waterproofing of the 100 Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fighting to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/ CRZ NOC, 10. 100 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation Completion Certificate. TABLE B Internal and External Development Works in respect of the entire Registered Phase. Sr. No. Common areas and Facilities, Proposed Percentage of Details (1) Amenities (Yes/No) Work done (5) (2) (3) (4) I. Internal Roads & Footpaths No NA 2. Water Supply Yes 100 Borewell Sewarage (chamber, lines, Septic Yes 100 Septik Tank 3 Tank, STP) Storm Water Drains No 0 NA Landscaping & Tree Planting. Yes 100 Plants 6. Street Lighting No 0 NA Community Buildings No NA (1) (2) (3) (4) (5) 8. Treatment and disposal of sewage and sullage water. No NA Solid Waste management & 9. No Disposal. NA 10. Water conservation, Rain water Rain Water harvesting. Yes 100 Harvesting 11. Energy management No NA Fire protection and fire safety 12 NO NA requirements Electrical meter room, Electric Meter 13. Yes 100 sub-station, receiving station. Room 14. Others (Option to Add more). Yours Faithfully, KU. SHRADDHA SAGANE Signature & Name (IN BLOCK LETTERS) of L.S./ Architect (License No. CA/2016/75503) MOB. NO. 9561811923 Auch. Shraddha Sagane (3. Arch.) No. CA/2016/75503