FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 31/03/2026 To, DILIP DEVICHAND CHAUDHARI Plot No.43A to 56B of S No. 30/2, Mouje Chandur, Akola 444004. Subject: Certificate of Percentage of Completion of Construction Work of NISRAG GARDEN WING R located at Plot No.43A to 56B of S No. 30/2, Mouje Chandur, Akola 444004. having MahaRERA Registration Number NA (Only Applicable after project registration) being developed by DILIP DEVICHAND CHAUDHARI. Sir, I/ We SHYAM THAKUR have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of NISRAG GARDEN WING R located at Plot No.43A to 56B of S No. 30/2, Mouje Chandur, Akola 444004. having MahaRERA Registration Number NA (Only Applicable after project registration) being developed by DILIP DEVICHAND CHAUDHARI. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of Actual Work Done (As on date No. (2) of the Certificate) (1) (3) 1. Excavation 100 % 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100 % 5. Stilt Floor NA 6. Slabs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings, Doors and Windows 50 % within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 40% 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 30% and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion 50 % of terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Common areas Proposed Percentage of Details No and Facilities. (Yes/No) Work done (5) (1) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& NA NA NA Footpaths 2. Water Supply NA NA NA 3. Sewerage (chamber, lines, NA NA NA Septic Tank, STP) 4. Storm Water Drains NA NA NA 5. Landscaping & Tree Planting NA NA NA 6. Street Lighting NA NA NA 7. Community Buildings NA NA NA 8. Treatment and disposal of NA NA NA sewage and sullage water 9. Solid Waste management & NA NA NA Disposal 10. Water conservation, Rain NA NA NA water harvesting 11. Energy management NA NA NA 12. Fire protection NA NA NA And fire safety requirements 13. Electrical meter room, sub- NA NA NA station, receiving station