DNYANOBA TRIMBAKRAO NAGARALE Sai Niu.as, Rajashri Nagar. Basri'eshawar Charvk, Kava Naka. Laruf.413 512. Ntob.No. + 91- 77 688 85281 FORM.2 ENGINEER'S CERTIFICATE Date.25l07l2Q17 To Name :-Dreamz Inf rastructure (Promoter) Address of Promoter:- C/o Dreamz Infrastructure Rallies plot, Amravati. 444601 Subiect : Ceftificate of Percentage of Completion of Construction Work of 6No.of Building of the Itphase of the Project IMahaRERA Registration Number] situated on the plot bearingc.N.No/c'tsNo./survey no.Gut No.87,88,119(P),113,134,135 ,r38,L39,L40,L42,&144(p) demarcated by its boundaries ( latitude and longitude of the end points)cut no:-89,90,131to the North , 18m internal road to the south, Gut No. 139to the East, Phase I A1 Buildingto the Westof Division Amravati village Borgaon Dharmare taluka Amravati District Amravati ptN 444901 admeasuring 20943,47 sq,mt. area being developeo oy Dreamz Infrastructure (Promoter) Ref :MahaRERA registration Number :- NA( new registration for new project) Sir, lDnyanoba T. Nagrale have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 6Bullding of the ll phase of the project, situated on the plot bearing Gut.No./survev No: Gut No.8rug,119(p),113,134,13s,138,139,i.40,i.42,&144(p)of Division Amravati. Village Borgaon Dharmale Taluka Amravati. District Amravati. plN 444901 admeasuring 20943.47 sq.mt. area being developed by Dreamz lnfrastructure (promoter) Following technicai professionals are appointed by Owner / promoter (i) M/s Akash V.Mohota as L.S. / Architect (ii) Shri Ritesh J.Laddha as Structural Consultant (iii) M/s HB CONSULTANT & VISHWAKARMA PLUMBING CONSULTANCY as MEP Consultant (iv) Shri Dnyanoba T. Nagrale Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEp and Allied works, of the Building(s) of the project. Our estimaied cost calculaiions are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated byDnyanoba T. Nagrale quantity Surveyor" appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us' 3. We estimate Total Estimated Cost of completion of the building(i) of the aforesaid project under reference as Rs- 479898114.00/-(Total of Table A and B). The estimated Total cost of project is with reference to the civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town Planning being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 330346010.00/-(Total of Table A and B)-. The amount of Estimated Cost Incurred is calculaied on the base of amount of Total Estlmaied Cost . 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate fromTown planning (planning Auth0rity) is estimated at Rs. 149552104.00/-( Total of Table A and B). 6. I cerlify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this ceriificate is as given in Table A and B below : TABLE A Building /Wing bearing Number or called A2 Wing (to be prepared separately for each Building of the Real Estate Project) ^lving 5r. No, Partieulars Amounts 1 Total Estimated cost ofthe building as on 25/07 /2017 73338662.00 2 Cost incurred as on 25/Q7 /2Q17 6921-3362.O0 (based on the Estimated cost ) Work done in Percentage 94.38 0A {as Percentage ofthe estimated cost ) 4 Balance Cost to be Incurred 4125300.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on_not included in the Estimated Cost (Annexure A) TABLE A Building /Vving bearing Number or called A3 Wing (to be prepared separately for each Building /VVing of the Real Estate Project) Sr. No. Particulars Amounts L Total Estimated cost ofthe building as on 2510712017 73338662.00 2 Cost incurred as on 25/07 /20L7 s0878697.00 (based on the Estimated cost ) 3 Work done in Percentage 69.38 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 22459965.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE A Building bearing Number or called 44 Wing ^/ving (to be prepared separatety for each Buitding /Wing of the Real Estate project) Sr. No, Particulars Amounts 1 Total Estimated cost ofthe building as on 25107/20L7 73338662.00 2 Cost incurred as on 25/07 /20L7 522s53797 .00 (based on the Estimated cost ) 3 Work done in Percentage 7r.25 % (as Percentage of the estilated cost ) 4 Balance Cost to be Incurred 21084865.00 (Based on Estimated Cost) 5 Cost lncurred on AdditionafExtra ttenrs 0,00 as on included in ---not the Estimated Cost (Annexure A) TABLE A Building /Wing bearing Number or called A5 Wing (to be prepared separately for each Building /Wing of the Real Estate project) 5r. No. Particulars Amounts t Total Estimated cost ofthe building as on25/07 /2017 73338662.00 2 Cost incurred as on 25/07 /2017 56379096.00 (based on the Estimated qost ) 3 Work done in Percentage 76.88 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 16959566.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE A Building IWing bearing Number or called A6 Wing (to be prepared separately for each Building /Wing of the Real Estate Project) Sr, No. Particulars Amounts 1 Total Estimated cost ofthe building as on25/07120L7 73338662.00 2 Cost incurred as on 25/07 /2017 472rr764.00 (based on the Estimated cost ) 3 Work done in Percentage 64.38% {as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 26126898.00 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 as on_not included in the Estimated Cost (Annexure A) TABLE A Building /Wing bearing Number or called A7 Wing (to be prepared separately for each Building /Wing of the Real Estate Project) Sr, No. Particulars Amounts 1 TotalEstimated cost ofthe building as on 25/07 /2017 73338662.00 2 Cost incurred as on 25/07 /2OI7 38961164.00 (based on the Estimated cost ) 3 Work done in Percentage s3,L3 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 34377498.OO (Based on Estlmated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE B (A2 TO A7 WING) (To b6 prepared for the entire registered phase of the Real Estate Projsct) Sr, Particulars Amounts No 1 Total Estimated cost of the Internal and External 39866142.00 Development Works including amenities and Facilities in the layout as on 25/07 /20L7 cost incurred as on 25/07 /2017 15448130.00 (based on the Estimated cost ) Work done in Percentage 38.75% (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 244t80r2.00 (Based on Estimated Cost) ) Cost lncurred on Additional /Extra ltems not included in 0.00 the Estimated Cost (Annexure A) @rryL" Yours Faithfully Dnyanoba T. Nagrale