Ar.VrushaliEobade Architectural Plan ning& Designing Reg.No.-CA,/2017/85318 FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE (Certificate upto3 l.O3.2OZ S) Datet 09/04/2025 To, M/s Akola's Construction LLP Akola Subiect Certificate of Percentage of Completion of Construction Work of " Infinity Tower"having MahaRERA Registration Number P50100077106 [Only Applicable after pro,ect registrationl being developed by M/s Akola's Construction LLP. S ir, I Vrushali Bobadehave undertaken assignment as Architect Surveyor of certifying Percentage of Completion of Construction Work of " Infinity Tower"having MahaRERA Registration Number P50100077106 being developed by M/s Akola's Construction LLP. Based on Site lnspection, with respect to the Building of the aforesaid Real Estate Proiect, I certi$/ that as on date of this certificate the Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. Ar.VrushaliBobade Architectural Plan ning& Designing Reg.No.-CA/2017l85318 TABLE - A Building :" lnfinity Tower" Sr Task / Activity Percentage ofActual No. (z) Work Done (As on (1) date ofthe certificate) (3) 1. Excavation 700o/o 2. Basements (if any] 80o/o Podiums (ifany) Nil 4. Plinth 80o/o 5. Stilt Floor 80o/o 6. Slabs of Super Structure 7 0o/o 7. Internal wallt Internal Plaster, Floorings, Doors and Windows 25o/o within Flats/Premises 8. Sanitary Fittings within the Flat/Premises Nil 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 400/o Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 5o/o terraces with waterproofing of the Building/Wing. 11. Installation oflifts, water pumps, Fire Fighting Fittings And NiI Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving ofareas appurtenant to Building / Wing Compound Wall and all other requirements as maybe required to complete proiect as per specifications in agreement of Sale. Any other activities. Ar.VrushaliBobade ArchitecturalPlan ni ng& Designing Reg.No.-CA,/2017l85318 Table B Common Areas 0nternal and External Development Works) in respect to the Building " Infi nityTowefl' Sr.No Common areas Proposed Percentage of Details and Facilities. (Yes/NoJ Work done (As on date of thp Cprfifi.atpl 1. lnternalRoads& Footpaths No NA 2. WaterSupply Yes 25o/o Borewells , Corporation Water Connection Water Supply Tanks, pipelines etc 3. Sewerage (chamber, lines, Yes 250/o Septic Tank , SepticTank, STPI Sewerage Lines 4. Storm Water Drains No NA 5. Landscaping &Tree Planting No NA 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment and disposal of No Nil sewage and sullage water 9. Solid Waste management & No NA Disposal 10. Water conservation, Rain water Yes Nil Rain Water harvesting Harvestine Pit 11. Energy management No Nil L2, Fire protection Yes Nil Fire Hydrant Line, And fire safety requirements Fire Extinguishers, Sprinklers 13, Electrical meter room, sub- Yes Nil ElectriclePanels , station, receiving station Meter Room 14. Others [Option to Add more) No NA Yours Faithfully Signature Name ofArchitect :Ar Vrushali Bobade Name :-Shri Aayush Bhagwandas Agrawal License No. : CA/2O17 /AS3[A Date I og'o4'zoqr. Place :- Akola : '/rtrs[t.t[i't/. $obadc Consrirting Architect CAr 2017/85318