v-. Ar. Vrusholi Bobode Architecturol Plonning & Designing Reg. No.- C A/2017 18531 I FORM 1 lsee Regulation 3] ARCHITECT'S CERTIFICATE (Certifi cate upto 31.12.2024) Date:18/01/2025 To, M/s Akola's Construction LLP Akola Subiect: Certificate of Percentage of Completion of Construction Work of " Infinity Tower" having MahaRERA Registration Number P5010OO77106 [Only Appticable after project registrationJ being developed by M/s Akola's Construction LLP. Sir, I Vrushali Bobade have undertaken assignment as Architect Surveyor of certiffing Percentage of Completion of Construction Work of " Infinity Tower" having MahaREM Registration Number P50100077106 being developed by M/s Akola's Construction LLP. Based on Site Inspection, with respect to the Building ofthe aforesaid Real Estate Proiect, I certi8/ that as on date ofthis certificate the Percentage of Work done for the building ofthe Real Estate Prolect under MahaRERA is as per Table A herein below. The percentage ofthe work executed with respect to each of the activity ofthe entire phase is detailed in Table B. H- 1L ,Mhada Colony, Opp, (idzeeschool, Ram Nagar Akola - 444 005 (M.S) Mobile :86004 87550 E- mail: vrushalibobade25@gmail.com V l Ar. Vrusholi Bobode Architecturol Plonning & Designing Reg. No.- C A/2017 /85318 TABLE. A Building: " Infinity Tower" Sr Task / Activity Percentage of Actual No. (2) Work Done [As on (1) date ofthe Certificate) (3) 1. Excavation l00o/o 2. Basements (if anyJ B0o/o 3. Podiums (if anyJ Nil 4. Plinth 8Oo/o 5. Stilt Floor 8oo/o 6. Slabs of Super Structure 35o/o 7. Internal walls, lnternal Plaster, Floorings, Doors and Windows 5o/o within Flats/Premises 8. Sanitary Fittings within the Flat/Premises Nil 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and l5o/o Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of Nil terraces with waterproofing of the Building/Wing. 11. Installation of Iifu, water pumps, Fire Fighting Fittings And Nil Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance Iobby/s, plinth protection, paving ofareas appurtenant to Building / Wing Compound Wall and all other requirements as maybe required to complete proiect as per specifications in asreement of Sale. Any other activities. H-1L ,Mhada Colony, Opp, Kidzeeschool,Ram Nagar Akola - 444 005 (M.S) Mobile :85004 87550 E- mail: vrushalibobade25@gmail.com Y ^'' V"fi?fX Ar. Vrusholi Bobode Architeciurol Plonning & Designing Reg. No.- CAl2017 /853\8 Tabte B Common Areas (lnternal and External Development Works) in respect to the ^Ht l, Building " lnfinity Tower" Sr.No Common areas Proposed Percentage ol Details and Facilities. (Yes/No) Work done (As on date of thp fprtiffcatel 1. InternalRoads & Footpaths No NA 2. WaterSupply Yes 25o/o Borewells , Corporation Water Connection Water Supply Tanks , pipelines etc 3. Sewerage [chamber, lines, Yes 25o/o Septic Tank , SepticTan( STP) Sewerage Lines 4. Storm Water Drains No NA 5. Landscaping &Tree Planting No NA 6. Street Lighting No NA 7. Community Buildings No NA Treatment and disposal of No Nil sewage and sullage water 9. Solid Waste management & No NA Disposal 10. Water conservation, Rain water Yes Nil Rain Water harvesting Harvesting Pit LL. Energy management No Nil 12. Fire protection Yes Nil Fire Hydrant Line , And fire safety requirements Fire Extinguishers , Sprinlders 13. Electrical meter room, sub- Yes Nil Electricle Panels , station, receiving station Meter Room t4. Others f0ption to Add more) No NA Yours Faithfully Ctobd. Signature Name ofArchitect : Ar Vrushali Bobade Llcense No. t CA/2Ofi /AS3LA "t,A Sigrrature of Promoter Name rshrl Aayush Bhagwandas Agrawal Date :- 18,01,2025 Place :- Akola l.l;11 ,Mhada ColonV, Opp, Kidzeeschool,Ram Nagar Akola - 44,1 005 (M.S) Jf. l/ru5frAfr il $Ofutl . Ntobite :86004 87550 E mail:vrushatibobade2s@gmait.com : Consulting Archltect cA/2017/8s318 :