\ - MIT MEHARE (CIVIL ENGINEER) I C/O GOPAL NAGAR, PAWAN NAGAR, AMRAVATI II PNo. :444 607 M. - 7030508180 E-mail : Regd. No. MIL - L9216 (See regulatlon 3) Date : ENGINEER'S CERTIFICATE (To be submitted at the time of registration of ongoing Project and for withdrawal of Money from Designated Account-Project work) To, Date Shri. Sachin K. lngole, Amravati. Subiect: Certificate of cost lncurred for development of (Proiect Name) for construction of Commercial + Residential, No. of Buildings 1 of the 1 Phase of the Proiect (MahaRERA Registration Number) Situated on the plot Bearing 5r. No 319/34, Plot no 2 demarcated by its boundaries (latitude and longitude of the end Points) Survey No. 319/3A to the North Open Space to south Road width 12.00m to the East Open space to the west of the division i Amravati, village-Badnera, Taluka & District - Amravati, PIN No. 444701 admeasuring 797.00 sq.mt areas being Developed by Shri. Sachin K. lngole, Amravati. Ref:. MahaRERA Registration Number Sir, t Mr. Amit V. Mehare have undertaken assiSnment of certifying estimated cost for subject Real Estate Project proposed to be registered under Maharera, being Commercial + Residential Buildings Survey No.319/34 to the North Open Space to south Road width 12.00m to the East Open Space to the west of the division :- Amravati, village-Badnera, Taluka & District - Amravati, PIN No. 444701 admeasuring 797.00 sq'mt areas being Developed by shri. Sachin K. lngole, Amravati. Following technical professionals are appointed by owner / promoter:- 1. Mr.Amit V. Mehare as Engineer. 2- Shri Ritesh Laddha as structural Consultant 3. M/s / Shri/ Smt. ---N.A.---------- as MEP Consultant 4. Mr. Akshay S. Shirbhate as a site supervisor 5. We have estimated the cost of the completion to obtain occupation certificate,/completion certificate, of the civil, MEP and Allied $/orks, of the buildings of the project. Our estimated cost calculation are based on the drawings/ plans made AI.,{il h{EFIARE gfle!llEER 61y11 C/o.GoPal lia3l:;,F;: ;an l'iar; Amravati Rgd.ir ].li'.':-'l I . M - 703060s i'l - available to us for the proiect under reference by the developer and consultants and the schedule of the items and quantity for the entire work as calculated by Mr. Akshay S. Shirbhate quantity surveyor appointed by developer/engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 5. We estimate total estimated cost of completion of the buildings of the aforesaid project under reference as Rs.2,43,24,755/- (total of table A & B).The estimated total cost of project is with reference to the civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the buildings from the Amravati Municipal corporation being the planning authority under whose jurisdiction the aforesaid project is being implemented. 7. The estimated cost incurred till date is calculated at Rs.0.00/- (Total of Table A&B). The amount of estimated cost incurred is calculated on the base of amount of total estimated cost. 8. The balance cost of completion of the civil, MEP and allied works of the buildings of the subject project to obtain occupation certificate/completion certificate from (planning authority) is estimated at Rs.2,43,24,755/- (total of table A&B). 9. I certify that the cost of the Civil ,MEP, and allied work for the aforesaid proiect as completed on the date of this certificate is as Siven in Table A & B below: Table- A BuildinE / wing Number called (To be prepared separately for each buildings / wing of the real estate proiect) Sr. No. Particulars -or Amounts 1. Total estimated cost ofthe buildings/wings Rs.2,43,24,755/ - As on of registration is 2. cost Incurred as on Rs.0.00/- (based on the estimated cost) 3. Work done in percentage -date of the estimated cost) (as percentage o% - 4. Balance cost to be incurred Rs.2,43,24,755/- (based on estimated cost) 5. cost incurred on additional/extra items Rs.0.00 as on not included in the estimated cost (Annexure A) Table -B (To be prepared for the entire registered phase of the Real Estate Project.) No Particulars Sr. Amounts 1. Total estimated cost of the internal and external N'A. Development works including amenities and Facilities in the layout as on Date Of registration is 2. cost incurred as on N.A. ( based on the estimated co$ 3. work done in percentage - ( as percentage of the estimated cost) 4. Balance cost to be incurred N.A ( based on estimated cost) 5. cost incurred on additional/extra items N.A. as on not included in the estimated cost (Annexure A) Iffi AM MEHARE Note : 1. The scope of the work is complete entire Real Estate Project as per drawings approved from time to time so as obtain occupation certificate/completion certificate. 2. Quantity survey can be done by office of engineer or can be done by an independent quantity surveyor, whose certificate of quantity calculated can be relied upon by the engineer, in case of independent quantity surveyor being appointed by developer, the name has to be mentioned at the person in the office of engineer, who is responsible for the quantity calculated should be mentioned at the place marked. 3. The estimated cost includes all labour, material, equipments and machinery required to carry out entire work. 4, As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /to be incurred. 5, All components of work with specification are indicative and not exhaustive. Annexure A List of Extra/additional items executed with cost (Which were not part of the original Estimate of Total cost.)