MIXED BUILT-UP AREA CALCULATION LOWER GROUND FLOOR MIXED BUILT-UP AREA CALCULATION GROUND FLOOR MIXED BUILT-UP AREA CALCULATION LOWER BASEMENT FLOOR MIXED BUILT-UP AREA CALCULATION UPPER BASEMENT MIXED BUILT-UP AREA CALCULATION FIRST FLOOR MIXED 0.23 2.1 6.475 1.555 15.415 Owner details 0.23 2.1 10.31 1.555 15.415 13.98 17.3 FSI AREA BALCONY TERRACE VENT Other TOTAL BUILDING FLOORS LIFT LIFTWELL DUCT LiftWell20 BUILT UP AREA CALCULATION COMM. RESI. IND. SPECIAL MEZZ. PROP. PROP. SHAFT Deduction FSIAREA LiftWell22 LiftWell21 LiftWell17 FOR FIRST FLOOR MIXED Signature Not Verified 3.76 Area(Sq.M) 3.76 6.045 AREA NAME LENGTH WIDTH 7.49 LiftWell14 BLOCK 31.28 19.58 569.61 MIXED FIFTH FLOOR 0.00 575.49 0.00 0.00 0.00 130.27 0.00 0.00 7.98 17.97 0.00 0.00 549.54 Owner Name Postal Address Contact Number BLOCK AREA TOTAL =569.61Sq.M Digitally signed by ASHISH SHESHRAO WANKHADE 11.56 Date: 2024.04.24 13:49:47 IST 11.56 LiftWell16 - - 3.78 MIXED SIXTH FLOOR 0.00 575.49 0.00 0.00 0.00 125.54 0.00 0.00 7.98 17.97 0.00 0.00 549.54 9.09 3.835 Reason: Approved Drawing Plan 9.09 0.6 0.6 2 LiftWell15 - - 5.35 Location: Akola Municipal Corporation 16.2561 3.675 LiftWell14 - - 4.20 shri mangal 16.58 AKOLAS 3.6 3.6 Project Code : DDMCO-23-44876 MIXED FOURTH FLOOR 569.61 0.00 0.00 0.00 0.00 136.26 0.00 0.00 13.33 0.00 0.00 0.00 556.28 Appartment,,Akola,Akola, 9423144398 LiftWell18 TOTAL Deduction =13.33Sq.M Application Number : DDMCO202301314 CONSTRUCTION LLP Net BuiltUp Area =556.28 Sq.M Maharashtra-444001 0.6 0.6 Proposal Number : 199885 MIXED THIRD FLOOR 569.61 0.00 0.00 0.00 0.00 136.14 0.00 0.00 13.33 0.00 0.00 0.00 556.28 AVINASH MOHANRAO LiftWell16 Certificate Number : DDMCO/B/2024/APL/05006 AKOLA 9.09 2.6069 RAUT 1.73 1.73 LiftWell19 3.7094 MIXED SECOND FLOOR 569.61 0.00 0.00 0.00 0.00 147.66 0.00 0.00 13.33 0.00 0.00 0.00 556.28 PRAVIN 2.33 8.86 SWARUPCHAND AKOLA 2.33 MIXED FIRST FLOOR 569.61 0.00 0.00 0.00 0.00 152.48 0.00 0.00 13.33 0.00 0.00 0.00 556.28 LiftWell15 AGRAWAL BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION FOR LOWER BASEMENT FLOOR MIXED FOR UPPER BASEMENT MIXED 2.33 9.65 4 MIXED GROUND FLOOR 456.28 0.00 0.00 0.00 0.00 0.00 0.00 5.35 7.98 0.00 0.00 0.00 448.30 VIDIT SANJAY TULSHAN AKOLA 2.33 12.8831 AREA NAME LENGTH WIDTH Area(Sq.M) Area(Sq.M) 1 AREA NAME LENGTH WIDTH BUILT UP AREA CALCULATION 1.6192 SUSHANT FOR LOWER GROUND FLOOR MIXED BUILT UP AREA CALCULATION BLOCK 9.09 2.33 19.01 BLOCK 9.09 2.33 19.01 2.1 LOWER GROUND BHAGWANDAS AKOLA AREA NAME LENGTH WIDTH Area(Sq.M) FOR GROUND FLOOR MIXED MIXED 415.10 0.00 0.00 0.00 0.00 0.00 0.00 3.78 9.00 0.00 0.00 0.00 406.10 0.9999 13.1131 1.6192 0.0001 FLOOR AGRAWAL BLOCK AREA TOTAL =19.01Sq.M BLOCK AREA TOTAL =19.01Sq.M BLOCK 27.28 16.58 415.10 AREA NAME LENGTH WIDTH Area(Sq.M) BLOCK 27.28 17.58 456.28 BUILT UP AREA CALCULATION 9.965 2.23 1.785 17.3 AAYUSH BHAGWANDAS LiftWell22 - - 3.78 LiftWell21 - - 3.78 BLOCK AREA TOTAL =415.10Sq.M FOR SIXTH FLOOR MIXED UPPER AKOLA BLOCK AREA TOTAL =456.28Sq.M MIXED 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AGRAWAL TOTAL Deduction =3.78Sq.M LiftWell20 - - 4.20 AREA NAME LENGTH WIDTH Area(Sq.M) BASEMENT TOTAL Deduction =3.78Sq.M LiftWell19 - - 4.80 LiftWell18 - - 3.78 BLOCK 31.28 19.58 575.49 Anurag Shriram Agrawal akola Net BuiltUp Area =15.23 Sq.M Net BuiltUp Area =15.23 Sq.M TOTAL Deduction =9.00Sq.M LiftWell17 - - 4.20 BLOCK AREA TOTAL =575.49Sq.M LOWER TOTAL Deduction =7.98Sq.M 7.8175 LiftWell4 - - 3.78 Net BuiltUp Area =406.10 Sq.M LiftWell3 MIXED BASEMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Net BuiltUp Area =448.30 Sq.M LiftWell3 - - 4.20 FLOOR 9.745 Duct14 - - 1.32 BUILT-UP AREA CALCULATION SECOND FLOOR MIXED BUILT-UP AREA CALCULATION THIRD FLOOR MIXED BUILT-UP AREA CALCULATION FOURTH FLOOR MIXED Duct13 - - 1.32 MIXED Total 3149.82 1150.98 0.00 0.00 0.00 828.35 0.00 9.13 86.26 35.94 0.00 0.00 4178.60 13.98 17.3 13.98 17.3 Duct12 Duct11 Duct12 - - 1.32 13.98 17.3 Duct11 - - 1.32 0.115 Duct10 - - 9.63 Carpet Area Table SCHEDULE OF OPENING: Duct9 - - 1.55 1.6725 0.23 2 Duct14 Duct13 6.045 0.3725 Enclosed Balcony Normal Balcony LiftWell4 6.045 BLD NAME NAME LENGTH HEIGHT NOS. Duct8 - - 1.51 FSI DETAILS Building Name Floor Name Carpet name Tenement No Carpet Area Area Area Total Carpet Area 6.045 LiftWell5 LiftWell8 3.93 TOTAL Deduction =25.95Sq.M LOWER GROUND MIXED W 0.65 1.20 1 LiftWell11 Net BuiltUp Area =549.54 Sq.M MIXED HALL 1 348.88 0.00 0.00 348.88 MIXED V 0.60 1.20 8 FLOOR 0.3725 Incentive FSI MIXED GROUND FLOOR SHOP-1 1 56.61 0.00 0.00 56.61 Assistant Director Town Planning 8.86 MIXED W 0.53 1.20 1 Date: 25/10/2023 for Ancillary Area Ancillary Area Inclusive 2.4661 MIXED GROUND FLOOR SHOP-2 1 56.61 0.00 0.00 56.61 2 Basic FSI Premium FSI TDR MIXED W 0.67 1.20 1 2 2 16.2561 9 Index green building 60% of 80% of Total Housing (20%) Drawing Value 3.675 16.2561 MIXED GROUND FLOOR SHOP-3 1 56.61 0.00 0.00 56.61 3.675 16.2561 MIXED V 0.80 0.75 4 (on serial no 1) (on serial no 1) (on serial no 1) 3.675 If Applicable (2+3+4+5) (2+3+4+5) If Applicable MIXED GROUND FLOOR SHOP-4 1 21.12 0.00 0.00 21.12 MIXED W 0.90 1.20 3 Duct10Duct9 MIXED GROUND FLOOR SHOP-5 1 42.23 0.00 0.00 42.23 ( on basic FSI) MIXED W 0.46 1.20 1 MIXED GROUND FLOOR SHOP-6 1 42.23 0.00 0.00 42.23 MIXED W 2.04 1.20 2 LiftWell10 LiftWell7 Duct8 ABC 6 KG FIRE EXTINGUISHER MIXED GROUND FLOOR SHOP-7 1 31.56 0.00 0.00 31.56 LiftWell13 2.1 9.1 Permissible MIXED GROUND FLOOR TOILET 1 9.52 0.00 0.00 9.52 MIXED W 1.80 1.20 60 0.9999 1.10 0.50 1.40 0.00 0.00 0.00 3.00 0.00 0.00 13.1131 1.6192 0.0001 Index MIXED FIRST FLOOR SHOP-8 1 60.12 30.71 85.85 90.83 MIXED V 0.80 1.20 15 HOSE REEL BUILT-UP AREA CALCULATION SIXTH FLOOR MIXED HOSE BOX 8.86 MIXED FIRST FLOOR SHOP-9 1 56.61 0.00 85.85 56.61 8.86 9.2 Existing MIXED FIRST FLOOR SHOP-11 1 25.77 0.00 85.85 25.77 SCHEDULE OF OPENING: 8.86 HYDRANT VALUE LiftWell9 LiftWell6 Comsumed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MIXED FIRST FLOOR SHOP-12 1 54.75 0.00 7.92 54.75 BLD NAME NAME LENGTH HEIGHT NOS. LiftWell12 Index MIXED FIRST FLOOR SHOP-13 1 30.55 0.00 85.85 30.55 MIXED D 1.50 2.10 1 PUMP MIXED FIRST FLOOR SHOP-14 1 21.30 7.81 0.00 29.11 MIXED D 0.90 2.10 1 MIXED FIRST FLOOR SHOP-15 1 15.72 20.21 0.00 35.93 MIXED R.S 4.00 3.00 1 9.3 Balance Index SPRINKLER HYDRANT LINE 1.10 0.50 1.40 0.00 0.00 0.00 0.00 0.00 0.00 MIXED FIRST FLOOR TOILET 1 4.80 0.00 0.00 4.80 2.1 2.1 3X3M GRID to be Consume MIXED D 1.26 2.10 1 2.1 0.9999 MIXED FIRST FLOOR SHOP-10 1 56.61 0.00 85.85 56.61 13.1131 1.6192 OH WATER TANK 0.9999 0.0001 13.1131 1.6192 0.9999 0.0001 MIXED D 2.10 2.10 1 13.1131 1.6192 0.0001 BUILT UP AREA CALCULATION MIXED SECOND FLOOR OFFICE-1 1 32.31 0.00 0.00 32.31 FOR THIRD FLOOR MIXED 2 WAY FIRE INLET VALUE BUILT UP AREA CALCULATION STAIRCASE TOWER1.20 MIXED D1 0.90 2.10 2 9.4 Total MIXED SECOND FLOOR OFFICE-2 1 29.10 3.36 37.77 32.46 BUILT UP AREA CALCULATION FOR SECOND FLOOR MIXED FOR FOURTH FLOOR MIXED WATER TANK AREA NAME LENGTH WIDTH Area(Sq.M) Permissible PLine 981.00 445.91 1248.54 0.00 412.20 1368.00 4455.65 0.00 0.00 MIXED SECOND FLOOR OFFICE-3 1 28.13 3.29 0.00 31.42 MIXED RS 6.60 3.00 2 AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) BLOCK 31.28 19.58 569.61 Area() MIXED SECOND FLOOR OFFICE-4 1 34.45 4.01 0.00 38.46 MIXED RS 3.70 5.00 5 BLOCK 31.28 19.58 569.61 BLOCK 31.28 19.58 569.61 2.10 BLOCK AREA TOTAL =569.61Sq.M MIXED RS 5.70 3.00 1 MIXED SECOND FLOOR OFFICE-5 1 34.45 4.01 0.00 38.46 BLOCK AREA TOTAL =569.61Sq.M BLOCK AREA TOTAL =569.61Sq.M TERRACE LEVEL LiftWell10 - - 3.78 MIXED SECOND FLOOR OFFICE-6 1 15.72 20.21 0.00 35.93 MIXED R 4.91 3.00 1 9.5 Proposed P LiftWell13 - - 3.78 LiftWell7 - - 3.78 MIXED SECOND FLOOR OFFICE-7 1 28.67 7.81 0.00 36.48 MIXED RS 8.47 3.00 2 LiftWell9 - - 5.35 LiftWell6 - - 5.35 Line Area (Should 981.00 445.91 971.53 0.00 412.16 1368.00 4178.60 0.00 4178.60 LiftWell12 - - 5.35 MIXED SECOND FLOOR OFFICE-8 1 27.68 9.94 4.57 37.62 MIXED RS 3.90 10.00 10 LiftWell8 - - 4.20 LiftWell5 - - 4.20 not exceed 9.4 ) LiftWell11 - - 4.20 2.90 BALCONY MIXED SECOND FLOOR OFFICE-9 1 18.81 6.83 0.00 25.64 MIXED RS 3.19 3.00 3 TOTAL Deduction =13.33Sq.M TOTAL Deduction =13.33Sq.M TOTAL Deduction =13.33Sq.M MIXED SECOND FLOOR OFFICE-10 1 25.49 9.17 0.00 34.66 Net BuiltUp Area =556.28 Sq.M Net BuiltUp Area =556.28 Sq.M Net BuiltUp Area =556.28 Sq.M FIFTH FLOOR LVL HALL MIXED RS 4.85 3.00 3 9.6 Index MIXED SECOND FLOOR OFFICE-11 1 22.81 23.53 37.77 46.34 36.58 36.58 1.09 0.50 1.08 0.00 0.00 0.00 2.68 0.00 0.00 MIXED RS 3.30 6.00 6 Consumed MIXED SECOND FLOOR TOILET 1 4.80 0.00 0.00 4.80 MIXED RS 5.33 3.00 3 MIXED THIRD FLOOR OFFICE-12 1 32.31 0.00 0.00 32.31 1.50 BALCONY 2.90 MIXED D 2.40 2.10 4 MIXED THIRD FLOOR OFFICE-13 1 29.10 3.36 37.77 32.46 4.50 11.92 Parking Check (Table 8B) MIXED THIRD FLOOR OFFICE-14 1 28.13 3.29 0.00 31.42 MIXED RS 4.91 3.00 2 PLATFORM FIFTH FLOOR LVL TOILET HALL + KITCHEN MIXED THIRD FLOOR OFFICE-15 1 34.45 4.01 0.00 38.46 MIXED RS 6.24 3.00 3 RATIO Required MIXED THIRD FLOOR OFFICE-16 1 34.45 4.01 0.00 38.46 MIXED D 8.00 2.10 8 MIXED THIRD FLOOR OFFICE-17 1 15.72 20.21 0.00 35.93 MIXED D 2.00 2.10 2 parking 3.00 Building Name TENAMENT NO.OF MIXED THIRD FLOOR OFFICE-18 1 28.67 7.81 0.00 36.48 USE Transport MIXED D 1.80 2.10 10 FOURTH FLOOR LVL TOILET TOILET AREA Tena/Area/Units MIXED THIRD FLOOR TOILET 1 4.80 0.00 0.00 4.80 MIXED D2 0.75 2.10 17 OFFICE -28 car Scooter car Scooter Vehicle/Ambula MIXED THIRD FLOOR OFFICE-19 1 27.68 9.94 4.57 37.62 nce/Mini Bus MIXED D 1.40 2.10 6 parking MIXED THIRD FLOOR OFFICE-20 1 18.81 6.83 0.00 25.64 MIXED D1 14.00 2.10 14 parking MIXED THIRD FLOOR OFFICE-21 1 25.49 9.17 0.00 34.66 3.00 30M WIDE ROAD 30M WIDE ROAD For every 5 guest MIXED D1 0.75 2.10 12 2M WIDE DRIVE WAY MIXED Residential 1 6 21 4.20 25.20 - MIXED THIRD FLOOR OFFICE-22 1 22.81 23.53 37.77 46.34 rooms 3.4200 M DRIVE WAY THIRD FLOOR LVL TOILET TOILET OFFICE -17 MIXED FOURTH FLOOR OFFICE-23 1 32.31 0.00 0.00 32.31 A A A A MIXED FOURTH FLOOR OFFICE-24 1 29.10 3.36 37.77 32.46 9.965 1.785 2.23 17.3 For every 200 MIXED FOURTH FLOOR OFFICE-25 1 28.13 3.29 0.00 31.42 5M WIDE DRIVE WAY parking MIXED Commertial sq.m. carpet area 3 11 1183.64 17.75 65.10 - MIXED FOURTH FLOOR OFFICE-26 1 34.45 4.01 0.00 38.46 CAR LIFT CAR LIFT CAR LIFT CAR LIFT 3.00 LIFT or fraction thereof. 7.8175 MIXED FOURTH FLOOR OFFICE-27 1 34.45 4.01 0.00 38.46 LiftWell1 SECOND FLOOR LVL TOILET TOILET OFFICE -6 3.00 M DRIVE WAY 9.745 MIXED FOURTH FLOOR OFFICE-28 1 15.72 20.21 0.00 35.93 parking For every 100 MIXED FOURTH FLOOR OFFICE-29 1 28.67 7.81 0.00 36.48 18.98 MIXED Commertial sq.m. carpet area 2 6 1050.36 21.01 63.02 - 24.38 24.38 MIXED FOURTH FLOOR OFFICE-30 1 27.68 9.94 4.57 37.62 Duct7 Duct6 or fraction thereof MIXED FOURTH FLOOR OFFICE-31 1 18.81 6.83 0.00 25.64 0.115 Lift Well Lift Well 3.00 2.10X1.80 2.10X1.80 (3.78 Sq.m) MIXED FOURTH FLOOR OFFICE-32 1 25.49 9.17 0.00 34.66 (3.78 Sq.m) TOILET TOILET 1.6725 0.23 2 Duct4 Duct5 1.50 D D FIRST FLOOR LVL SHOP-15 Total - - - - - 42.96 153.32 - MIXED FOURTH FLOOR OFFICE-33 1 22.81 23.53 37.77 46.34 LiftWell2 0.3725 3.93 parking MIXED FOURTH FLOOR TOILET 1 4.80 0.00 0.00 4.80 2.4661 0.3725 3.00 M DRIVE WAY Visitors MIXED FIFTH FLOOR ROOM-1 1 33.20 4.01 0.00 37.21 8.86 parking(5%) - - - - - 0.21 1.26 0 MIXED FIFTH FLOOR ROOM-2 1 33.20 4.01 0.00 37.21 3.35 MIXED FIFTH FLOOR ROOM-3 1 26.97 3.29 0.00 30.26 Duct3 Duct2 2 WAY FIRE INLET VALUE TOILET TOILET SHOP-7 MIXED FIFTH FLOOR ROOM-4 1 27.92 3.41 0.00 31.33 GROUND FLOOR LVL Total - - - - - 43.17 154.58 0.00 Duct1 2M WIDE DRIVE WAY MIXED FIFTH FLOOR ROOM-5 1 37.73 3.82 0.00 41.55 2.4M WIDE DRIVE WAY 2.1 MIXED FIFTH FLOOR ROOM-6 1 16.16 6.58 5.31 22.74 13.1131 1.6192 parking 0.9999 0.0001 MIXED FIFTH FLOOR ROOM-7 1 21.55 23.52 0.00 45.07 2.74 BUILT-UP AREA CALCULATION FIFTH FLOOR MIXED ABC 6 KG FIRE EXTINGUISHER MIXED FIFTH FLOOR ROOM-8 1 24.18 9.17 0.00 33.35 Parking Check As Per Multiplying Factor : 0.60 GL LEVEL METER ROOM MIXED FIFTH FLOOR ROOM-9 1 22.49 6.83 0.00 29.32 BUILT UP AREA CALCULATION ABC 6 KG FIRE EXTINGUISHER TOILET TOILET MIXED FIFTH FLOOR ROOM-10 1 21.24 9.94 0.00 31.18 FOR FIFTH FLOOR MIXED Area(Sq.M) parking 0.60 AREA NAME LENGTH WIDTH Required Proposed MIXED FIFTH FLOOR OFFICE 1 20.87 7.70 4.69 28.57 BLOCK 31.28 19.58 575.49 RAMP DOWN LOWER GROUND FLOOR LVL SPRINKLER HYDRANT LINE BLOCK AREA TOTAL =575.49Sq.M 4.50 4.50 MIXED FIFTH FLOOR HALL KITCHEN 1 25.89 11.41 12.12 37.30 LiftWell2 - - 3.78 3.00 Building Name Transport Transport Status MIXED SIXTH FLOOR ROOM-11 1 33.20 4.01 0.00 37.21 LiftWell1 - - 4.20 3.00 Duct7 - - 1.32 Car/Mini Bus Scooter Vehicle/Ambula Car/Mini Bus Scooter Vehicle/Ambula MIXED SIXTH FLOOR ROOM-12 1 33.20 4.01 0.00 37.21 Duct6 - - 1.32 UPPER BASEMENT LEVEL BASEMENT JOCKEY PUMP 180 LPM MAIN PUMP nce/Mini bus nce/Mini bus MIXED SIXTH FLOOR ROOM-13 1 26.97 3.29 0.00 30.26 Duct5 - - 1.32 LOWER BASEMENT FLOOR UPPER BASEMENT SPRINKLER HYDRANT LINE MIXED SIXTH FLOOR ROOM-14 1 27.92 3.41 0.00 31.33 Duct4 - - 1.32 15.00 15.00 Duct3 - - 9.63 Total 26 93 0 27 95 0 OK MIXED MIXED SIXTH FLOOR SIXTH FLOOR ROOM-15 ROOM-16 1 1 37.73 16.16 3.82 6.58 0.00 5.31 41.55 22.74 Duct2 Duct1 - - - - 1.55 1.51 9M WIDE ROAD 9M WIDE ROAD 3.00 TOTAL Deduction =25.95Sq.M MIXED SIXTH FLOOR ROOM-17 1 21.55 23.52 0.00 45.07 LOWER BASEMENT LEVEL Net BuiltUp Area =549.54 Sq.M BASEMENT MIXED SIXTH FLOOR ROOM-18 1 24.18 9.17 0.00 33.35 MIXED SIXTH FLOOR ROOM-19 1 22.49 6.83 0.00 29.32 PROP.LOWER BASEMENT FLOOR PLAN PROP.UPPER BASEMENT FLOOR PLAN SECTION BB MIXED SIXTH FLOOR ROOM-20 1 21.24 9.94 0.00 31.18 SCALE 1:100 SCALE 1:100 SCALE 1:100 MIXED SIXTH FLOOR HALL KITCHEN 1 57.07 19.11 16.16 83.44 SPRINKLER DRAWING SPRINKLER DRAWING SPRINKLER DRAWING SCALE 1:100 SCALE 1:100 S.LANE 12/17 12/21 PROP SITE PROP SITE 36.580 36.580 36.580 36.58 12/13 1873 12/20 12/22 2.800 2.800 2.800 2.800 2.800 12/14 12/16 12/18 RO B B B 12/24 12/26 W W W W W W W W W W W W W W W W 31.280 2.800 2.800 2.800 4.800 4.800 WASH 12/23 2M WIDE BALCONY BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY 2M WIDE BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY 12/28 ENCLOSED BALCONY BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY D 2.00X2.00 2.00X2.00 2.00X2.00 ENCLOSED BALCONY 12/15 2.000 12/19 2.500 D 2.500 D 2.500 ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY 12/25 2.800 ENCLOSED BALCONY 12/27 OFFICE-28 ROOM-8 ROOM-7 ROOM-20 ROOM-19 ROOM-18 ROOM-17 ENCLOSED BALCONY ENCLOSED BALCONY 4.50 Lift Well Lift Well Lift Well 5.77X5.70 2.00X2.10 2.00X2.10 ROOM-10 ROOM-9 2.00X2.10 OFFICE-29 OFFICE-30 OFFICE-31 OFFICE-32 OFFICE-33 4.86X7.36 4.47X7.36 5.77X7.36 KITCHEN 4.86X7.36 3.30X7.36 4.47X7.36 5.77X7.36 ENCLOSED BALCONY ENCLOSED BALCONY 27.28 (32.88 Sq.m) (4.20 Sq.m) (4.20 Sq.m) 3.30X7.36 (4.20 Sq.m) 5.99 SP W 6.08X7.47 4.85X7.47 3.30X7.47 4.47X7.47 5.77X7.47 (27.80 Sq.m) (37.36 Sq.m) 3.73X7.36 (26.02 Sq.m) (24.27 Sq.m) (27.80 Sq.m) (37.36 Sq.m) 30.00 M WIDE ROAD Lift Well (26.02 Sq.m) HALL / KITCHEN OFFICE (24.27 Sq.m) HALL 30M WIDE ROAD 30M WIDE ROAD 30M WIDE ROAD 1882 2.00X2.10 D (27.48 Sq.m) D (35.27 Sq.m) (36.27 Sq.m) (24.65 Sq.m) (33.40 Sq.m) (43.11 Sq.m) (4.20 Sq.m) 2.000 7 W 5.77X5.47 3.73X7.36 W A 5.77X7.38 W (31.57 Sq.m) (27.48 Sq.m) W (35.57 Sq.m) TOILET TOILET TOILET TOILET TOILET NZL PLOT NO- 12/18 TOILET TOILET TOILET 1.71X2.40 1.90X2.40 SP A A A 1.71X2.40 1.90X2.40 1.90X2.40 1.90X2.40 (3.77 Sq.m) A (3.32 Sq.m) (3.77 Sq.m) 1.90X2.40 (3.77 Sq.m) 1.90X2.40 (3.77 Sq.m) A (3.32 Sq.m) (3.77 Sq.m) (3.77 Sq.m) MEN TOILET WC D2 D2 D2 D2 D2 D2 D2 D2 SERVICE PLATFORM 4.50 1.66X1.66 DUCT DUCT D DUCT DUCT V 1.10X1.20 1.10X1.20 1.10X1.20 1.10X1.20 KEY PLAN (2.34 Sq.m) D1 D V (1.32 Sq.m) V V(1.32 Sq.m) V D D V(1.32 Sq.m) V V (1.32 Sq.m) V RS RS RS RS RS D2 RS D1 D1 D1 D1 D1 D1 D1 D1 SP 4.800 D1 TOILET WOMEN TOILET BALCONY 2.10X1.78 D 16.26 D.P PLAN 24.380 V WC 1.65X1.67 (2.35 Sq.m) 2 M WIDE PASSAGE 2.00X2.00 V (3.75 Sq.m) 2 M WIDE PASSAGE 24.380 BALCONY 2.00X2.00 D 2 M WIDE PASSAGE RS RS RS RS D1 D1 D1 D1 D1 D1 W D1 D1 D1 D1 D1 D1 W SP 2 M WIDE PASSAGE 14.167 Lift Well DUCT ENCLOSED BALCONY ENCLOSED BALCONY Lift Well DUCT Lift Well DUCT DUCT 24.380 1.10X1.20 2 M WIDE PASSAGE 1.10X1.20 1.10X1.20 1.10X1.20 Proposed Construction (1.32 Sq.m) 2.10X1.80 2.10X1.80 2.10X1.80 (HOT WATER PIPE) MANHOLE (3.78 Sq.m) V V V(1.32 Sq.m) V (3.78 Sq.m) V (1.32 Sq.m) V V (1.32 Sq.m) V WATER TANK (3.78 Sq.m) Lift Well 16.580 OFFICE-23 TOILET D21.90X2.40 TOILET D2 D2TOILET D2 ROOM-6 D2TOILET D2 D21.90X2.40 TOILET D2 ROOM-16 2.10X1.80 FREE BOARD 18000 D D 1.90X2.40 TOILET D TOILET TOILET SUMP WELL 8.47X3.82 4.65X3.93 1.90X2.40 4.65X3.93 (COLD WATER PIPE) LITRES 1.90X2.40 1.90X2.40 1.90X2.40 1.90X2.40 INSULATED STORAGE CAPACITY. (3.77 Sq.m) (3.77 Sq.m) (3.77 Sq.m) (3.78 Sq.m) SP (3.77 Sq.m) (3.77 Sq.m) (3.77 Sq.m) (3.77 Sq.m) (3.77 Sq.m) 1.5 FEET (32.31 Sq.m) 1.5 M WIDE PASSAGE 1.5 M WIDE PASSAGE 1.5 M WIDE PASSAGE TANK (17.65 Sq.m) (17.65 Sq.m) ROCKWOOL OUTLET 2.50 INSULATION INLET BAFFLE BK.WALL STAINLESS STEEL TANK D1 D1 SP BHEL FOR HOT WATER P.C.C. SECTION THROUGH M.S.GATE ROOM-5 TOILET ROOM-15 TOILET OFFICE-27 OFFICE-26 OFFICE-25 OFFICE-24 1.50X2.61 1.50X2.61 CROSS SECTION U. WATER TANK. WATER STORAGE REQUIREMENT SCALE: 100 3.90X9.60 3.90X9.60 3.19X9.60 3.30X9.60 Lift Well ROOM-1 ROOM-2 ROOM-3 ROOM-4 5.22X9.40 (3.91 Sq.m) ROOM-11 ROOM-12 ROOM-13 ROOM-14 5.22X9.40 (3.91 Sq.m) 2.40X2.23 3.90X9.49 3.90X9.49 3.19X9.49 3.30X9.49 (37.58 Sq.m) BALCONY (37.58 Sq.m) BALCONY HOT WATER OUTLET OVER HEAD WATER TANK REQUIRED P.C.C.COPING (37.45 Sq.m) (37.45 Sq.m) (30.59 Sq.m) (31.64 Sq.m) 2.50X2.00 3.90X9.49 3.90X9.49 3.19X9.49 3.30X9.49 2.50X2.00 (5.35 Sq.m) CW_HT TO USER POINT (31.92 Sq.m) (31.92 Sq.m) (25.13 Sq.m) (26.17 Sq.m) TOUGHENED GLASS HOT WATER PIPE VENT PIPE .23 thk.BK.WALL 22 TENEMENT = 110 PERSON X 45.00 .Ltr DUCT (31.92 Sq.m) (31.92 Sq.m) (25.13 Sq.m) (26.16 Sq.m) DUCT D 2.40X4.42 2.40X4.42 . SP 8M COVER PROTECTS THE CW_WIDTH thk.BK.WALL (9.63 Sq.m) (9.63 Sq.m) 2.0 HEAT ABSORBER (COLLECTOR) 19800.00Ltr D1TOILET DUCT D1TOILET DUCT MANHOLE GL. 1.50X1.82 2.27X1.22 (1.55 Sq.m) 1.50X1.82 2.27X1.22 (1.55 Sq.m) 2287 TENEMENT = 2287 X 310 PERSON X 45.00 .Ltr ST_WID 29 (2.74 Sq.m) (2.74 Sq.m) .45 thk.STONE WALL. 6 FEET APROX. .35 RUBBER TUBES 13950.00Ltr UP (COPPER TUBES FINS OUTLET P.C.C. STUDY LOBBY 2.4M WIDE SELECTIVELY COATED BLACKCHROME UP UP DUCT UP DUCT TO ABSORB SUN'S HEAT) 1.50X1.20 1.50X1.20 PLAN OF UNDERGROUND COMPOUND WALL A LCON Y (1.51 Sq.m) D BALC ONY (1.51 Sq.m) INLET 33750.00 Ltr. X 1.50=50625.00 Ltr SED B SE SOLAR WATER HEATING SYSTEM ST_LEN ENCLO ENCLO 17.18 1.40 WATER STORAGE TANK PROPOSED-O.H.W.T = 0.00 .Ltr DETAIL ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY W ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY W SEPTIC TANK DETAIL W W W W 4.50 W W W W 4.50 W W W W 4.50 4.800 SCALE 1:100 SCALE: 100 SCALE: 100 UGR Prop:0.00 SCALE: 100 Proforma I : Area Statement ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY B B B 16.48 4.50 OH WATER TANK 2.000 2.000 2.000 1. Area of plot (Minimum area of a, b, c to be 1.000 3.000 3.00 3.000 considered) or area of subplot with sanctioned layout No. 891.82 2.00 STAIRCASE TOWER1.20 WATER TANK FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR 15.00 15.00 15.00 and subplot No. 9M WIDE ROAD 15.00 2.10 9M WIDE ROAD 9M WIDE ROAD (a) As per ownership document (7/12, CTS extract) 891.90 9.00 M WIDE ROAD TERRACE FLOOR LVL TERRACE LEVEL FOURTH FLOOR PLAN (b) as per TILR or City Survey measurement sheet 891.90 SCALE 1:100 (c) as per Demarcated drawing area 891.82 N FIFTH FLOOR PLAN N SIXTH FLOOR PLAN N SITE PLAN N N 2.90 TOILET TOILET ROOM 18 TOILET TOILET ROOM 17 2.90 BALCONY LESS 2.Area not in possession 0.00 SCALE 1:100 SIXTH FLOOR LVL HALL KITCHEN ROOM 19 FIFTH FLOOR LVL HALL 6F 2.900 Project Details OHW TANK LVL 36.580 36.580 3. Entire area (1-2) 891.82 Building Type - Building Development STAIRCASE TOWER 1.20 4.Deductions for - 2.90 2.90 BALCONY Zone Type - Residential Zone - R-2, R-3 HALL+KITCHEN OFFICE TOILET TOILET ROOM 9 TOILET TOILET (a) Proposed D.P./ D.P. Road widening Area /Service ROOM 8 ROOM 7 Location - Non-Congested 2.800 2.800 0.00 2.40 FIFTH FLOOR LVL FIFTH FLOOR LVL TOILET HALL + KITCHEN 5F 2.900 Road / Highway widening Ward No - B B TERRACE FLOOR LVL W W W W W W W W W W W W (b) Any D.P. Reservation area 0.00 Plot No. - NZL PLOT NO-12/19 2.800 2.800 3.00 3.00 BALCONY BALCONY 2.00X2.00 (Total a+b) 0.00 OFFICE 28 Cts No./Servey No. - 3 ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY OFFICE 31 OFFICE 32 2.00X2.00 5.Balance area of plot (3-4) OFFICE 30 OFFICE 33 891.82 ENCLOSED BALCONY ENCLOSED BALCONY 2.90 OFFICE 29 FOURTH FLOOR LVL 4F 3.000 Sheet No. - 1 2.500 B 2.500 FOURTH FLOOR LVL TOILET TOILET OFFICE -28 Zone Number: East Zone OFFICE-6 OFFICE-17 6. Amenity Space 0.00 ENCLOSED BALCONY ENCLOSED BALCONY SIXTH FLOOR LVL Lift Well Lift Well 5.77X5.70 5.77X5.70 (Applicable if (1) > 20000 sqmt Ward Name : Civil Line (32.88 Sq.m) OFFICE-7 2.00X2.10 (4.20 Sq.m) OFFICE-8 OFFICE-9 OFFICE-10 OFFICE-11 (32.88 Sq.m) OFFICE-18 2.00X2.10 (4.20 Sq.m) OFFICE-19 OFFICE-20 OFFICE-21 OFFICE-22 - 3.00 W W 3.00 Prorata Value : 0.00 6.08X7.47 4.85X7.47 3.30X7.47 4.47X7.47 5.77X7.47 6.08X7.47 4.85X7.47 3.30X7.47 4.47X7.47 5.77X7.47 (Required -(a) Upto 20000 sqmt - Nil - 30M WIDE ROAD 30M WIDE ROAD OFFICE 17 OFFICE 19 OFFICE 20 OFFICE 21 OFFICE 22 (35.27 Sq.m) (36.27 Sq.m) (24.65 Sq.m) (33.40 Sq.m) (43.11 Sq.m) (35.27 Sq.m) (36.27 Sq.m) (24.65 Sq.m) (33.40 Sq.m) (43.11 Sq.m) 2.90 OFFICE 18 W THIRD FLOOR LVL THIRD FLOOR LVL TOILET TOILET OFFICE -17 3F 3.000 (b) Above 20000 sqmt - (a) + 5 % of Total area 0.00 23.89 FIFTH FLOOR LVL A EN A A A 7. Net Plot Area (5-6 ) 891.82 MEN TOILET LEGENDS: MEN TOILET 23.890 WC WC 8. Recreational Open Space - SERVICE PLATFORM SERVICE PLATFORM 1.66X1.66 1.66X1.66 3.00 3.00 V (2.34 Sq.m) D1 V (2.34 Sq.m) D1 LIFT 3.00 OFFICE 6 OFFICE 7 OFFICE 8 OFFICE 9 OFFICE 10 OFFICE 11 RS RS RS RS RS RS RS RS RS RS (a) If area (6) is more than 4000 sqmt - 10 % of (6) is SECOND FLOOR LVL 2F 3.000 0.00 SECOND FLOOR LVL TOILET TOILET OFFICE -6 PLOT BOUNDRY SHOWN WHITE D1 WOMEN TOILET WOMEN TOILET D1 required. V WC V WC FOURTH FLOOR LVL PROPOSED WORK SHOWN RED 1.65X1.67 (2.35 Sq.m) 2 M WIDE PASSAGE 1.65X1.67 (2.35 Sq.m) 2 M WIDE PASSAGE Proposed___ 0.00 24.380 24.380 RS RS RS RS RS RS RS RS RS RS (b) If area is less than 4000 sqmt -Check - 3.00 3.00 DRAINAGE LINE SHOWN YELLOW LIGHT - 2 M WIDE PASSAGE 2 M WIDE PASSAGE Lift Well Lift Well 3.00 FIRST FLOOR LVL SHOP 15 SHOP 14 SHOP 8 FIRST FLOOR LVL 1F 3.00 WATER LINE SHOWN BLUE DOTTED 2.10X1.80 (3.78 Sq.m) 2.10X1.80 (3.78 Sq.m) i) If it is full number like 1,2,125,419,etc. As per 7.12 TOILET TOILET SHOP-15 OFFICE-1 OFFICE-12 ENCLOSED BAL SHOWN BROWN D 8.47X3.82 D 8.47X3.82 abstract or City Survey Number - No Recreational open - THIRD FLOOR LVL (32.31 Sq.m) (32.31 Sq.m) space is required 1.5 M WIDE PASSAGE 1.5 M WIDE PASSAGE TERRACE SHOWN DARK YELLOW 3.35 3.35 OPEN BAL SHOWN BRAWN ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 3.00 - 0F OFFICE-5 OFFICE-4 OFFICE-3 OFFICE-2 OFFICE-16 OFFICE-15 OFFICE-14 OFFICE-13 recreational open space is required. GROUND FLOOR LVL SHOP 7 SHOP 1 GROUND FLOOR LVL TOILET TOILET SHOP-7 3.35 EXSTING SHOWN BLUE HATCHED 3.90X9.60 3.90X9.60 3.19X9.60 3.30X9.60 3.90X9.60 3.90X9.60 3.19X9.60 3.30X9.60 SECOND FLOOR LVL Lift Well 2.40X2.23 Lift Well 2.40X2.23 (A) 10 % Subject to minimum 200 sqmt 0.00 (37.45 Sq.m) (37.45 Sq.m) (30.59 Sq.m) (31.64 Sq.m) (5.35 Sq.m) (37.45 Sq.m) (37.45 Sq.m) (30.59 Sq.m) (31.64 Sq.m) (5.35 Sq.m) Proposed ______________ 0.00 2.74 D D 2.74 (B) Exemption to leave open space subject to availing 3.34 3.00 -1F - GL LEVEL METER ROOM HALL GL LEVEL METER ROOM 3.34 UP UP basic F.S.I of 75 % TOILET TOILET FIRST FLOOR LVL 0.60 TOUGHENED GLASS UP LOBBY 2.4M WIDE 2.000 UP LOBBY 2.4M WIDE (C) Exemption to leave open space subject to payment 0.600 0.00 LOWER GROUND FLOOR LVL LOWER GROUND FLOOR LVL G.I. OF Plinth COVER PROTECTS THE of 10 % land value of land at (7) as per annual - (COLLECTOR) 3.00 3.00 ENCLOSED BALCONY W ENCLOSED BALCONY W ENCLOSED BALCONY W ENCLOSED BALCONY W 4.50 ENCLOSED BALCONY W ENCLOSED BALCONY W ENCLOSED BALCONY W ENCLOSED BALCONY W 4.50 statement of rate. 3.35 -2F -3.00 B B UPPER BASEMENT LEVEL 2.000 2.000 BASEMENT UPPER BASEMENT LEVEL BASEMENT RUBBER TUBES (COPPER TUBES FINS GRID Certificate of Area: UPPER FLOOR LVL SELECTIVELY COATED BLACKCHROME TO ABSORB SUN'S HEAT) SECOND FLOOR THIRD FLOOR Certified that the plot under reference was surveyed by me on 15.00 15.00 BATTERY 2023-05-01 and the dimensions of sides etc. of plot stated onplan 2.74 3.00 3.00 -3F -3.00 9M WIDE ROAD 9M WIDE ROAD are as measured on site and the area so worked out tallies with the LOWER BASEMENT LEVEL GL LEVEL BASEMENT LOWER BASEMENT LEVEL BASEMENT INVERTER ELEC METER area stated in document of Ownership/ T.P. Scheme Records/Land SECTION BB PANEL PROP. SECOND FLOOR PLAN PROP. THIRD FLOOR PLAN Records Department/City Survey records. ELEVATION SECTION AA SCALE 1:100 SECTION VIEW - MIXED TERRACE FLOOR PLAN SOLAR SCALE 1:100 SCALE 1:100 Signature SCALE 1:100 SCALE 1:100 ELECTRIC MANUFACTURING UNIT (Name of Architect/ Licensed Engineer/ Supervisor.) SCALE 1:100 Owner's Declaration - 36.580 36.580 36.580 36.580 36.580 I/We undersigned hereby confirm that I/We would abide by plans approved by Authority / Collector. I/We would execute the structure 1.500 as per approved plans. Also I/We would execute the work under 2.800 4.500 11.92 4.500 supervision of proper technical person so as to ensure the quality PLATFORM B B B B B SP SP SP SP 4.800 4.800 4.800 and safety at the work site. W W W W 2.800 2M WIDE BALCONY CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP ENCLOSED BALCONY ENCLOSED BALCONY ENCLOSED BALCONY Owner (s) name and signature ENCLOSED BALCONY W W W 2.500 Architect/ Licensed Engineer/ Supervisor name and signature 1.5 M WIDE PASSAGE 4.500 4.500 SHOP-8 Lift Well Lift Well Lift Well 15.30X5.70 Job No. SP SP SP SP SP 2.00X2.10 2.00X2.10 SHOP-15 2.00X2.10 (4.20 Sq.m) SHOP-7 (4.20 Sq.m) SHOP-1 SHOP-14 (4.20 Sq.m) (87.21 Sq.m) 3.4200 M DRIVE WAY SP W 5.77X5.70 3.73X7.47 MECHANICAL VENTILATION 10.08X3.70 D 15.30X3.70 (32.88 Sq.m) 30M WIDE ROAD 30M WIDE ROAD 30M WIDE ROAD 30M WIDE ROAD 30M WIDE ROAD (31.56 Sq.m) (56.61 Sq.m) (27.90 Sq.m) SP W METER ROOM A A A A A 3.61X7.26 A A RS A A RS A Name Of : 2 M WIDE PASSAGE SP (26.17 Sq.m) TOILET MEN TOILET MECHANICAL VENTILATION 5M WIDE DRIVE WAY WC SERVICE PLATFORM SP 3.60X1.65 1.66X1.66 2M WIDE DRIVE WAY CAR LIFT CAR LIFT CAR LIFT CAR LIFT V V (2.34 Sq.m) D1 SP (5.97 Sq.m) SHOP-2 SHOP-9 SP SP SP SP D1 RS SP SP 15.30X3.70 15.30X3.70 TOILET D1 Postal Address : ,,Near thote 3.00 M DRIVE WAY (56.61 Sq.m) WC (56.61 Sq.m) 1.98X1.67 1.65X1.67 SP CP CP CP CP CP 18.98 SP V (3.31 Sq.m) V(2.35 Sq.m) WOMEN TOILET 2 M WIDE PASSAGE hospital,Akola,Akola,Akola-444001,Maharashtra 24.380 SP 24.380 24.380 D 24.380 D1 24.380 SP SP HALL RS RS Lift Well SP Lift Well Lift Well LIFT 23.10X16.12 Lift Well 2.10X1.80 (3.78 Sq.m) 2.10X1.80 2.10X1.80 (348.88 Sq.m) 2.10X1.80 2.10X1.80 SHOP-12 Phone No.:8983936296 (3.78 Sq.m) SP SP SP SP SP SP SP SP SP SP SP (3.78 Sq.m) (3.78 Sq.m) SHOP-6 SHOP-5 (3.78 Sq.m) 3.90X15.58 SHOP-3 SHOP-10 1.500 SP D MECHANICAL VENTILATION D 2.22 CP CP D D 3.90X10.83 3.90X10.83 15.30X3.70 D (54.75 Sq.m) 15.30X3.70 DESCRIPTION OF PROJECT : (42.23 Sq.m) (42.23 Sq.m) 1.5 M WIDE PASSAGE 4.800 4.800 (56.61 Sq.m) (56.61 Sq.m) Type of Proposal : Mixed SP SP SP SP SP SP SP SP SP SP SP SP SP BUILDING ON CTS. NO./SURVEY NO.-3 1.52 M WIDE LOBBY SHOP-13 SP SP RS RS 3.00 M DRIVE WAY 3.90X7.83 (30.53 Sq.m) MECHANICAL VENTILATION SP Lift Well LIFT Lift Well SP SP SP SP 2M WIDE DRIVE WAY 2.40X2.00 (4.80 Sq.m) SHOP-4 2.40X2.23 D SHOP-11 2.40X2.23 SITE ADDRESS : SP SP SP SP SP SP SP SP SP 2.4M WIDE DRIVE WAY SP 6.60X3.20 (5.35 Sq.m) (5.35 Sq.m) (21.12 Sq.m) 6.60X3.90 AKOLA D CP CP CP CP CP (25.77 Sq.m) 4.800 SP RS RS RS SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP UP UP DN RS RS RS LOBBY 2.4M WIDE UP UP UP 1.7 M WIDE PASSAGE UP tion ural projec Name Of Engineer : ANURAG SHRIRAM AGRWAL D R.S architect 2 M WIDE PASSAGE RAMP DOWN 4.50 4.50 4.50 4.50 4.50 LOGO ADDRESS OF OFFICE UP B 3.000 B 3.000 B 3.000 B 3.000 B OFFICE - 2.000 akola LOWER BASEMENT FLOOR UPPER BASEMENT LOWER GROUND FLOOR GROUND FLOOR FIRST FLOOR 15.00 15.00 15.00 15.00 15.00 9M WIDE ROAD 9M WIDE ROAD 9M WIDE ROAD 9M WIDE ROAD 9M WIDE ROAD OWNERS SIGN - TECHNICAL PERSON SIGN Signature Not Verified Verified by applicant Digitally signed by ANURAG SHRIRAM AGRAWAL Date: 2024.04.24 13:17:49 IST PROP.LOWER BASEMENT FLOOR PLAN PROP.UPPER BASEMENT FLOOR PLAN PROP.LOWER GROUND FLOOR PLAN PROP. UPPER GROUND FLOOR PLAN PROP. FIRST FLOOR PLAN Reason: Technical Person DSC Location: Akola Municipal Corporation Project Code : DDMCO-23-44876 Application Number : DDMCO202301314 SCALE 1:100 SCALE 1:100 SCALE 1:100 SCALE 1:100 SCALE 1:100 Proposal Number : 199885 MIXED SCALE - 1:100 Date: 08/06/23 JOB NO - DDMCO-23-44876 CHECK BY - - SUBMISSION DRAWING