Er. GIRISH AGP,AWAL Consulting Civil Engineer, Project Management Consultant & Contractor 303, Shakambari Ekant, Opp Hotel Greenland Cottage, VidyaNagar, Akola - 444001 fel :- 7058924224 , Email # pmc.girishagrawal@gmail.com Annexure B FORM 2 lsee Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Pmject Wise) oare:1Jlr)fz"tS To, Solid Foundations Group AKoIa, MAHARASHTRA,444OOl Subject: Certificate of Cost lncurred for Development of The Elegant Tower having MahaRERA Registration Number P5OlqrO76851 (Only Applicable after project Registartion) being developed by Solid Foundations Group Sir, l/We Girish Agrawal have of Cenifying Estimated Cost for The Elegant Tower having MahaRERA Registration Number P50'lq)O76851 (Only Applicable after project Registration, being developd by Solid Foundations Group ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor' appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascenain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 301000@.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartmenls and proportionate completion of internal & external works.as per specifications mentioned in agreements of sale and for the purpose of the oblaining occupation certificate / completion cenificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the Akola Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 128756q).fi) (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complilion of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 1722440O.m fiotalof Table A and B) Page 1 of4 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proponionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A otal Estimated Cost of the Cost lncurred on the Additional/Extra items not included in Page 2 of 4 Table B lnternal and External Works in resoect of the Reoistered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the BuildingMing/Layout 0 Ploned Development as on date ofkeqis'irati-on is 2 Cost incuned as on date of cenificate 0 3 Work done in Percentaoe (as oercentaoe of the estimated costl 0 4 Balance Cost to be lncurred"(Based on E$imated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost ffablc -C) Yours Faithfully Er. GIRISH M. AGRAWAT fonsuhln8 Eqlneer, Alq{" ctRtsH AGRA*A,_ Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. ilA (if applicable) Date of Certilicate: Agreed and Accepted by: * -/'A/A/)^-/ Signature of Promoter Name: Solid Foundations Group Date lEls) /?o2-f 1 .The scope of work is to complete Registered Real Estate Project as per drawings approved from lime to time and as per specifications mentioned in agreement of sale. 2.(') Quantily survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be menlioned at the place marked (') and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ('). 3.('-) Balance Cost to be incurred (4) may vary from Ditrerence between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive s.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of4 TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of4