Er.GrRrSHl. AGP/WAL (8.E. CIUL, PGDCM, CE) Consulting Engineer Contractor, Project Management Consultrnt, Builder & Developers. FORM-2 ENGINEER'S CER'TIFICATF (To be submitted at the time of Registration of Ongoing Proiect and for withdrawal of Money from Designated Account) Datet vpto 3-1. / L2 /2024 To, Solid Foundations Group Subiect: Certificate of Cost Incurred for Development of Proiect- The Elegant Tower, having MahaRERA Registration no P50100076851 being developed by Solid Foundations Group. Sic I have undertaken assignment of certiSring Estimated Cost for Project-The Elegant Tower having RERA number P5010ffi76851 developed by Solid Foundations Group 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the proiect. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(sJ of the aforesaid project under reference as Rs.3,01,00,000/- (Rupees Three Crore One Lac Only J The estimated Total Cost ofproiect is with reference to the Civil, MEP and allied work required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the beins the eh6l*ag ASIs:nE(aq{Hfii fthffffrilS$Ig[fuglbgeifits0Aidoproject is beins " implemented. Mob: - +91 TOStg 24224 Email: - sgrawal-girish@hotm8il.com q fun*4I y 1.,-J 2./ A ''-'t- EG GlRlsH M. AGRAWAT ltE'clvlLFeoc*tcEl Cousirtrmg f nftncor, AloL 4. The Estimated Cost lncurred till date is calculated at Rs. 1,20,000,00/- (Rupees One Crore Twenty Lacs OnlyJ The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost 5. The Balance cost of Completion ofthe Civil, MEP and Allied works ofthe Building(s) ofthe subject project to obtain Occupation Certificate/Completion Certificate from Akola Municipal Corporation is estimated at Rs 1,81,000,00/-(Rupees One Crore Eighty One lacs Only) 6. I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Pro)ect as completed on the date ofthis certificate is as given in Table A and B below: TABLE A Building - The Elegant Tower (to be prepared separately for each Building /Wing/Layout/Plottedofthe Real Estate Project) Sr.No Particulans Amounts l Total Estimated cost ofthe Building as Rs. 3,01,00,000/- on date of Registration is z Cost incurred as on date ofcertificate Rs. 1,20,000,00/- 3 Work done in Percentage (Based on Estimate 40o/o Cost] 4 Balance Cost to be Incurred (Based on Estimate Rs 1,81,000,00/- Cost) 5 Cost Incurred on Additional /Extra Items As on not included in the Estimated Cost(Table C) /.kwA 6 /l?",rJ * TPt'Si,?3BAY,i.\ cou.litting Engtncer' Akola Table B Internal & External Development Works in Respect of the Registered Phase Sr.No Particulars Amounts I Total Estimated cost ofthe Internal and NIL External Development Works including amenities and facilities in tle layout as on date ofRegistration is 2 Cost incurred as on date ofcertificate NIL 3 Work done in Percentage (Based on Estimate NIL Cost) 4 Balance Cost to be Incurred (Based on Estimate NIL Cost) 5 Cost Incurred on Additional /Extra ltems NIL As on not included in the Estimated Cost[lable C) Yours Faithfully, / 6 4.,*4 J'kYL-4 Er. GIRISH M.AGRAWAT (&E. Cn [" FGOCrI,CII Gousuld4 E4lnGGr, Ak*r