qrchrrect, rnt Desisner & varuers Amit Flathi & ASSOCiatgS Reg. No. C I2O02|3O128 G-l; 'Raghurai Arcade', Near Chaudhary Hospiial Civil Lines, Akola /144 001 . Ph:072+2114791 - Cell : 98226 m850. email : airethiamii@yahoo.co.in Ref. Form-1 Date : Architecf s Certificate (Certif icate qto 30/ffi/20241 To The Solid Foundations Group Subjecfi Certificate of Percentage of Completion of Construction Work of Project The Elegant Tower, having MahaRERA Registration Number- P501{XX}76851 being developed by Solid Foundations Group. Sir, I have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Project -The Elegant Tower, having RERA Number - P50100075851 being developed by Solid Foundations Group. Based on Site lnspection, with respect to the Building of the aforesaid Real Estate Project ,I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Proiect under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building -The Elegant Tower Sr. No Tasks /Activity Percentage Of work done (As on date of this certificate) 1 Excavation 100 2 Basements (if any) 00 3 Podiums (if any) m 4 Plinth 100 5 Stilt Floor 70 6 S1abs of Super Structure 40 7 Intemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the 20 Flat/Premises 8 Sanitary Fittings within the Flat/Premises, Elechical Fittings within the Flat/Premises 00 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 40 Underground Water Tanks 10 The extemal plumbing and external plaster, elevation, completion of terraces with 00 waterproofing of the Building/ Wing, 11 Installation of Iifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmenf Compliance to conditions of environment/CRz NOC, Finishing to entr.rnce 00 lobby / s, plinth protectioru paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ffi szi lt L TABLE-B Intemal & External Development Works in Respect of the entire Resistered Phase S. No Corlmon areaa Proposed Petcentage of Details And Facilities, (Yeq/t{o) Work done(As on date Amenities of this certificate) L. Intemal RoacGE NO Foothpaths 2. Water Supply YES 25 WATERSUPPLY 3. Sewarage (chamber, lines, Septic TanI( ,STP) \,ES 25 SEPTICTANK 4. Storm Water Drains NA 5. L,andsca ping &Tree YES Planting 00 PLANTS 6. Sheet Lighting NA Cornmunity NA Buildings 8. 'l reahnent and disposal of sewage and sullage water NA 9. Solid Waste manaeement & NA Disposal 10. Water conservation, Rain water harvesting YES 00 11. Energy Ir4anagement NO 1.2. Fire protecEon ancl-f 6- NO safety requfuements lJ. tlectrrcal meter room, sub- YES 10 statiory receiving station 14. Others(Option to YES 10 Add more) MIS SOUD FflINDAT'O'YS GROOP . ,t- -/,A PA^^J PARTNER