Architect, tnt Desisner & varuers Amit Rathi & ASSOCiatgS Reg. No. CAI2o0a3o128 G-l ;'Raghurai ArcadE', NBar Chaudhary Hospital Civil Lines, Akola 444 OO1. Ph:.072+2414791 - Cell : 98226 00850. email : amthiamit@yahoo.co.in Ref. Date : Form -l Architecf s Certificate (Certif icate upt o 31fl2/ 202al To The Solid Foundations Group Subject Certificate of Percentage of Completion of Construction Work of Project The Elegant Tower, having MahaRERA Regiskation Number- P501C10076851. being developed by Solid Foundations Group. Sir, I have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Project -The Elegant Tower, having RERA Number - P50100076851 being developed by Solid Foundations Group. Based on Site Inspectiory with respect to the Building of the aforesaid Real Estate Project ,I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. t dL /fi,N Table A Building -The Elegant Tower Sr. No Tasks /Activity Percentage Of work done (As on date of this certificate) L Excavation 100 2 Basements (if any) 00 o Podiums (if any) 00 4 Plinth 100 5 Stilt Floor 70 6 Slabs of Super Structure 65 7 Intemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the 40 Flat/Premises tl Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 20 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifs, Overhead and 50 Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion ol terraces with 00 waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment Compliance to conditions of environment/CRz NOC, Finishing to entrance 00 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate /.*w-L @r TABLE-B Internal & External Development Works in Respect of the entire Registered Phase And Facilities, Work done(As on date Amenities of this certificate) WATER SUPPLY -/.Atl*l mit P. Rathi B.Arch Regd.No.CA 2002/3A1i4