ACTUAL ARCHITECTURE Office No. 3, Shriniketan Appartment, Sheela Vihar Colony, Near Hotel Kimaya, Phone No. +91 8767209807 Karve Road, Pune - 411038 Email ld: office@actualarchitects.com Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Shri Sunil Shriram Hatekar ,,TORAN,,, Near Bharat Vidhyalya Ground, Tapdia Nagar, Akola - 444001 Subject: Certificate of Percentage of Completion of Construction Work of PAWAN PARK having MahaRERA Registration Number P50100032595 Being developed by ShriSunil Shriram Hatekar. Sir, l, Tanmai S. Hatekar have undertaken assignment as architect for certifying Rercentage of completion of Construcfion work of PAWAN PARK having MahaRERA Registrafion Number P50100032595 being developed by Shri Sunil Shriram Hatekar Based on site lnspection, with respect to layout / each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the entire phase is detailed in Table B. TABLE- A Layout /Auilding /Wing Number 1 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) {3) 1. Excavation 1,OO% 2. Basements ( if anv) NA 3. Podiums (if any) NA 4. Plinth 1.OO% 5. Stilt Floor NA 6. Slabs of super structure L00% 7. lnternal walls, lnternal Plaste4 Floorings, Doors and windows within 1,OO% Flats / Premises 8. Sanitary Fittings within the Flat / Premises 70% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 60% Underground water Tanks 10. External plumbing and external plaster; elevation, completion of 60% terraces with waterproofing of the Building / Wing lnstallation on Lifts, water pumps, Fire Fighting Fittings and o% ( 1.1.. Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Auilding /Wing Number 2 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) (3) 1. Excavation 1,OO% 2. Basements ( if anv) NA 3. Podiums (if any) NA 4. Plinth 7s% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and o% U nderground water Ta nks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wine 11. lnstallation on Lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fitfing, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 3 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) (3) L. Excavation o% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth o% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternal walls, lnternal Plastel Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 0% Underground water Tanks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wing 1.1. lnstallation on Lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRz NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 4 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) (3) 1. Excavation o% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth o% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and o% Underground water Tanks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wing 11. lnstallation on Lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 5 (To be prepared separately for each for each Layout / Building Wing / of the project) Sr. Task / Activity Percentage of Actual No. (21 work Done (1) (As on date of the Certificate) (3) 1.. Excavation 1.00% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 60% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and o% Underground water Tanks 10. External plumbing and external plaste; elevation, completion of o% terraces with waterproofing of the Building / Wine 1,1,. lnstallation on Lifts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 6 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. l2l work Done (1) (As on date of the Certificate) (3) 1.. Excavation rca% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternalwalls, lnternal Plaste; Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and o% Underground water Ta n ks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wine 11,. lnstallation on Lifts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in ment of sale. Any other activities. Layout /Building /wing Number 7 (To be prepared separately for each for each Layout / Building wing of the project) / Percentage of Actual work Done (As on date of the Certificate) Excavation Basements (if any) Podiums (if Slabs of super structure lnternal walls, lnternal plaster; Floorings, Doors and winoorrs rithin Flats / Premises Sanitary Fittings within the Flat / premises Staircases, Lifts wells and Lobbies at each Roor t"*t o*rr,"ro ,na U nderground water Ta nks External plumbing and external plaster, elevation, completion terraces with water roofing of the Buildi lnstallafion on Lifts, water pumps, Fire righti,g-Fittings and Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/wing, compound wail and ail other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B common Areas (lnternal and External Development works) in respect of the Registered phase/ project Number Sr. Common areas and Facilities Proposed Percentage of Details No. (2) (Yes/ No) ActualWork (s) (1) (3) Done (As on-date of the Certificate) (4) t. tnrernar Koa0s & l-ootpaths Yes 7s% lnternal road work is in process. 2. Water Supply Yes 50% Water supply connection work is in process. 3. Sewerage (Chambe; lines, Septic Yes 1.5% Sewerage relating to Tank, STP) Building No.7 Completed. 4. Strom Water Drains No o% 5. Landscaping & Tree Planting Yes 40% Tree Plantation work is in process 6. Street Lighting Yes 40% Work is in process 7. Community Buildings No 0% 8. Treatment and disposal of sewage Yes L5% Work is in process and sullage water. 9. Solid Waste management & No o% Disposal 10, Water conservation / Rain water Yes 20% Work is in process harvesting L7. Energy management Yes o% 1.2. Fire protection and fire safety No o% requirements 13. Electrical meter room, sub-station, Yes 100% Construction of room receiving station. is completed 1.4. Others (Option to Add more). 4ry- ffi Yours Faithfully, raruuhzrsulll HATEKAR Signature & Name (tN BLOCK LETTERS) (License N l Agreed and accepted by: SUNIL SHRTRAM HATERKAR Signature of profi6ter Name: Sunil Shriram Hatekar Date: 23.06.2025