ACTUAL ARCHITECTURE Office No. 3, Shriniketan Appartment, Sheela Vihar Colony, Near Hotel Kimaya, Phone No. +91 8767209807 Karve Road, Pune - 411038 Email ld : office@actualarchitects.com Annexure A FORM 1 [see Regulation 3] ARCH ITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Shri Sunil Shriram Hatekar "TORAN', Near Bharat Vidhyalya Ground, Tapdia Nagar; Akola - 44400L Subject: Certificate of Percentage of Completion of Construction Work of PAWAN PARK having MahaRERA Registration Number P50100032595 Being developed by Shri Sunil Shriram Hatekar. sir l, Tanmai S. Hatekar have undertaken assignment as architect for certifying Percentage of completion of Construcfion work of PAWAN PARK having MahaRERA Registration Number P50100032595 being developed by Shri Sunil Shriram Hatekar Based on site lnspection, with respect to layout / each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the worl< executed with respect to each of the entire phase is detalled in Table B. TABLE- A Layout /Building /Wing Number ! (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage ofActual No. (21 work Done (1) (As on date of the Certificate) (3) t. Excavation 1.00% 2. Basements ( if any) NA 3. Podiums (if any) NA 4. Plinth 1.OO% 5. Stilt Floor NA 6. Slabs of super structure 1.OO% 7. Internalwalls, lnternal Plaster, Floorings, Doors and windows within 6s% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 60% U nderground water Tanks 10. External plumbing and external plaster; elevation, completion of 20% terraces with waterproofing of the Building / Wing 1.1.. lnstallation on Lifts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRz NOC, finishing to entrance lobby/s, plinth protecfion, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing Number2 (To be prepared separatelyforeach foreach Layout/ Building/Wing of the project) Sr. Task / Activity Percentage of Actual No. (21 work Done (1) (As on date of the Certificate) (3) 1. Excavation 100% 2. Basements ( if any) NA 3. Podiums (if any) NA 4. Plinth 7s% 5. Stilt Floor NA 6. Slabs of super structure 0% 7. lnternal walls, lnternal Plaster; Floorings, Doors and windows within 0% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor levelOverhead and o% Underground water Tanks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wing 1.1.. lnstallation on Lifts, water pumps, Fire Fighting Fitlings and o% Equipment as per CFO NOC, Electrical fitEing, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 3 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) (3) 1. Excavatio n 0% 2. Basements (if anv) NA 3. Podiums (if any) NA 4. Plinth o% 5. Stilt Floor NA 6. Slabs of super structure 0% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within 0% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 0% Underground water Tanks 10. External plumbing and external plaster; elevation, completion of o% terraces with waterproofing of the Building / Wine 1.1,. lnstallation on Lifts, water pumps, Fire Fighting Fit[ings and 0% Equipment as per CFO NOC, Electrical fiting, mechanical equipment, compliance to condltions of environment/CRz NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number { (To be prepared separately for each for each Layout / Building Wing / of the project) Sr. Task / Activity Percentage of Actual No. (21 work Done (1) (As on date of the Certificate) (3) 1. Excavatio n o% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth o% 5. Stilt Floor NA 6. Slabs of super structure 0% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Filcings within the Flat / Premises 0% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 0% Underground water Tanks 10. External plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building / Wine n. lnstallation on Lifts, water pumps, Fire Fighting Fitfings and 0% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. Layout /Building /Wing Number 5 (To be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. (21 work Done (1) (As on date of the Certificate) (3) 1.. Excavatio n 1,OO% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 60% 5. Stilt Floor NA 6. Slabs of super structure o% 7. lnternal walls, lnternal Plaste; Floorings, Doors and windows within 0% Flats / Premises 8. Sanitary Fittings within the Flat / Premises 0% 9. Staircases, Lifts Wells and Lobbies at each floor levelOverhead and o% U nderground water Tan ks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wing L1 lnstallation on Lifts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fitLing, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Anv other activities. Layout /Building /Wing Number E (To be prepared separately for each for each Layout / Aullding / Wing ofthe project) Sr. Task / Activity Percentage of Actual No. (2) work Done (1) (As on date of the Certificate) (3) 1. Excavation 1"00% 2. Basements (if any) NA 3. Podlums (if anv) NA 4. Plinth 1.OO% 5. Stilt Floor NA 5. Slabs of super structure o% 7. lnternalwalls, lnternal Plastel Floorings, Doors and windows within o% Flats / Premises 8. Sanitary Fittings within the Flat / Premises o% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 0% Underground water Ta nks 10. External plumbing and external plaster, elevation, completion of o% terraces with waterproofing of the Building / Wing LL. on Lifts, water pumps, Fire Fighting Fittings and lnsta llatio n o% Equipment as per CFO NOC, Electrical fit[ing, mechanical eq uipme nt, compliance to condifions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per ificafions in agreement of sale. Any other activities. Layout /Building /Wing Number 7 (To be prepared separately for each for each Layout / Auilding / Wing of the project) Sr. Task / Activity Percentage of Actual No. (21 work Done (1) (As on date of the Certificate) (3) 1. Excavatio n 1,OO% 2. Basements (if any) NA 3. Podiums (if any) NA 4. P lint h 1.00% 5. Stilt Floor NA 6. Slabs of super structure 100% 7. lnternal walls, lnternal Plaster, Floorings, Doors and windows within 1.00% Flats / Premises 8. Sanitary Fittings within the Flat / Premises 1.OO% 9. Staircases, Lifts Wells and Lobbies at each floor level Overhead and 100% Underground water Tanks 10. External plumbing and external plaster, elevation, completion of 1.00% terraces with waterproofing of the Building / Wine 1.1.. lnstallation on Lifts, water pumps, Fire Fighting Fittings and 1,OO% Equipment as per CFO NOC, Electrical fitting, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B Common Areas (lnternaland External Development Works) in respect of the Registered Phase/ Project Number Sr. Common areas and Facilities Proposed Percentage of Details No. (2) (Yes/ No) Actual Work (s) (1) (3) Done (As on date of the Certificate) (4) 1.. lnternal Roads & Footpaths Yes 75% lnternal road work is in process. 2. Water Supply Yes 50% Water supply connection work is in process. 3. Sewerage (Chamber; lines, Septic Yes 1,5% Sewerage relating to Tank, STP) Building No. 7 Completed. 4. Strom Water Drains No o% 5. Landscaping & Tree Planting Yes 40% Tree Plantation work is in process 6. Street Lighting Yes 40% Work is in process 7. Community Buildings No o% 8. Treatment and disposal of sewage Yes 15% Work is in process and sullage water. 9. Solid Waste management & No o% Disposal 10. Water conservation / Rain water Yes 20% Work is in process harvesting 1.1.. Energy management Yes o% L2. Fire protection and fire safety No o% requirements 13. Electrical meter room, sub-station, Yes 1,00% Construction of room receiving station. is completed 14. Others (Opfion to Add more). Yours Faithfully, -/ -1 "-*rtAa'>-- TANMAI SUNIL HATEKAR Signature & Name (lN Agreed and accepted by: SUNIL SHRIRAM HATERKAR W Sffiture of Promoter Name: Sunil Shriram Hatekar Date: 29.01.2025