FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 09/08/2021 To, MAULI ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Subject Certificate of Cost Incurred for Development of MAULI PLAZA No. of Building (s)/ 1 Wings (s) of the. Phase of the project situated on the plot bearing C.S. No. /C.T.S. No./ Survey No./Final plot no._3 &4,S. NO. 36/2 demarcated by its boundaries (latitude and longitude of the end points)_PLOT NOo. 18 tothe North PLOT NO182_ to the South_ROAD IN LAYOUT to the East_OTHER LAYOUTto the West of Division_AMRAVATIL village AMRAVATI_ taluka AMRAVATI DistrictAMRAVATI PIN 444604 admeasuring _741.13 sq.mtrs. area being developed by [Promoter's NameMAULI ASsOCIATES. Reference: MahaRERA Registration Number- P 50300018935 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assigment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAULI PLAZA No. of Building (s)/ 1 Wings (s) of the Phase of the project situated on the plot bearing C.S. No./C.T.S. No./ Survey No./Final plot no. 3 &4, S. NO. 36/2 demarcated byits boundaries (latitude and longitude of the end points) PLOT NO. 18to the North PLOT NO 182 to the South_ROAD IN LAYoUTto the East_OTHER LAYOUTto the West of Division_AMRAVATI village_AMRAVATI taluka AMRAVATI District_AMRAVATI PIN_444604 admeasuring_741.13 sq.mtrs. area being developed by [Promoter's Name MAULI ASSOCIATES MahaRERA Registration Number- P 50300018935 1. Followingtechnical professionals are appointed by Owner/ Promoter i) M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech; (ii) Shri. Amar Deshmukh as Structural Consultant ii) Shri. Ravi Deshmukh as MEP Cons tan (iv) Shri. Mahesh Vyawahare as Quantity Surveyor W e have estimated the cost of the eompletion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations arebased on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer. and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 4,60.61.042/-. The estimated Total Cost of project Phase I is with reference to the Civil, MEP and alied works required to be completed for the purpose of Amravati obtaining occupation certificate / completion certificate for the building(s) from the Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 5,03,00,000/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase I of the subject project to obtain Occupation Certificate/ Completion Certificate from _AMC. (planning Authority) is estimated at Rs.00/- 6. I certity hat the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A Belo TABLE A Building/Wing bearing Number 1 Called Mauli PLAZA (to be prepared separately for each Building/ Wing ofthe Real Estate Project) Sr. No. Particulars Amounts (1) (2) 3) Total Estimated cost of the building/wing as on date of Rs. 4.60,61,042/- Registration is Cost incurred as on 30.6.2021 (Based on the Estimated 2 Rs. 5,03,00,000./ cost) Work done in percentage (as Percentage of the estimated 3 100% cost) 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 00/ Cost Incurred on Additional / Extra ltems as on 5 02/02/2021 not included in the Estimated Cost (Annexure Rs.0/ A) Yours Faithfully. Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] Pritinsl:a Gurjar e.t.(Civil) Consultng Cii C.gncer Note: T h e scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/ Completion Certificate. 2. ()Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (°). 3. The estinmated cost includes all labour, material, cquipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive.