fr. Ahash Gaikwad BE (CM), ME (Slruc:UIII) I+91 9420940050 © +91 9404693082 I I homepoludk:e@gmal.com Jain Plaza, Shop No 3, r Home Point PLinninq Dc.siqmnq S1ru,:11.- < ~11r1 r\"l\l,,r; Annexure B I 9 Near Amblka Urban Bink, Main Road, Chichi, Dist. Buldana, MS India, 443201 Reg No. CCCEA/R/2021/APL/00094 FORM2 Date: / /20 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date:~\\ ogf "2.D'l-6 To, Renucorp Private Limited Akola, MAHARASHTRA,444004 Number Subject: Certificate of Cost Incurred for Development of Krushna Skyline having MahaRERA Registration Limited P50000078469 (Only Applicable after project Registartion) being developed by Renucorp Private Sir, Skyline having I/We Er Akash Galkwad Home Point Gaikwad have of Certifying Estimated Cost for Krushna being developed by MahaRERA Registration Number P50000078469 (Only Applicable after project Registration, Renucorp Private Limited ) and 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments in agreements proportionate completion of internal & external works of the project as per specifications mentioned the project under of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for work as reference by the Developer I Consulatants. The Schedule of items and quantity required for the entire of material.lab our and calculated by Quantity Surveyort appointed by Developer/Engineer, the assumption ofthe cost the above analysis other inputs made by developer.and the site inspection carried out by us to ascertain / confirm given to us. at Rs. 31178642.20 3. We estimate Total estimated the Cost of ·completion of the aforesaid project under reference to the Civil, (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference of internal & external MEf:' and Allied works required for completion of the apartments and proportionate completion occupation works.as per specificatio ns mentioned in agreement s of sale and for the purpose of the obtaining /Plotted Developme nt from the Chlkhall certificate I completion certificate for the Building(s) /Wing(s)/ Layout being implemented. Municipal Council being the Planning Authority under whose jurisidiction the aforesaid project is B}.The amount of 4.The Estimated Cost incured till date is calculated at Rs. 29150500.00 (Total of Table A and these items. Estimated Cost incurred is calculated on the basis of Input materials/services used and unit cost of and 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments of sale, of the proportionate Complition of internal & external works, as per specification mentioned in agreement Page 1 of 4 Project is estimated at Rs 2028142.20 (Total of Table A and B) 6. 1 certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :Krushna Skyline/NA Sr. No. Particulars Amount tin Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 30678642.20 Plotted Develooment as on date of Reqistration is 2 28900500.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaqe of the estimated cost) 94.20 4 Balance Cost to be lncurred-(Based on Estimated Cost) 1TT8142.20 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Page 2 of4 Internal and External Development Works In respect of the Registered Phase , ,· Sr. No. Particulars Amount (In Rs.) (1} . 1 Total Estimated Cost of the Building/Wing/Layout 500000.00 Plotted Develooment as on date of Reoistration is 2 Cost incurred as on date of certificate 250000.00 3 Work done in Percentaoe (as oercentaoe of the estimated cost) 50.00 4 Balance Cost to be lncurred**(Based on Estimated Cost) 250000.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Table -C) Yours Faithfully AKAS GAIKWAD B.Tech(C, ,1 1 ME \Structural) Consultant Structural Engtneer 2 1 ER AKASH GAIKWi~~pj~~~~ ~~j~~g Signature &. Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent _as per ~cction 2(u) of the Act] Local Authority license no. STATE/R/2022/APU01364 (if applicable) Date of Certificate: Agreed and Accepted by: Signature of Promoter Name: Renucorp Private Limited Date: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor.whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer.the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred I to be incurred. 4 .All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page3of4 TABLE C List of Extra/Additional/Deleted Items considered In Cost. (which were not part of the original Estimate of Total Cost) Page4 of4